Final Engineering services report _62 Lake Macdonald Drive · OPW25/0057
Very large file (27.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
1.0 INTRODUCTION This Engineering Services Report (ESR) is to provide information as to the development potential and servicing of the defined property (62 Lake Macdonald Drive, Cooroy) on behalf of Noosa Shire Council. This report identifies engineering aspects associated with a proposed development and may form the basis of future works and supporting documentation for the commencement of a development application with Noosa Shire Council. 2.0 PROJECT INFORMATION 2.1 SITE LOCATION The site is located on the corner of Lake Macdonald Drive and Dianella Court, at Cooroy with an overall site area of approximately 3.54 ha. The real property description is Lot 105 on SP118458. The total site currently consists of a storage shed, vegetation and open space. The proposed development application is for lot reconfiguration for residential purposes. Adjoining land used to the site include: • South Undeveloped vegetated, low-density allotments and road reserve • East Low-density residential • West Cooroy Cemetery Refer to Figure 1 – Site Locality Plan. 2.2 TOPOGRAPHY AND DRAINAGE The site is approximately 3.54 ha in size and approximately half of the site on the northern side has been cleared with remnant pine plantation covering most of the southern half of the site. This is not protected vegetation and is to be cleared as part of the site contaminated land remediation works. The site generally grades north, east and south from a high point of approximately RL 128 on the western boundary down to approximately RL 103 at the north-east corner of the site. There is a small external catchment (1/SP118458) of approximately 0.35 ha. Roughly half of this catchment will be cut- off by the proposed swale drain on the eastern boundary of the proposed balance lot. The other half will flow through proposed lot 3, matching what occurs in the existing case scenario until lot 3 is developed. It is expected that this flow will then be cut-off and piped within lot 3, to its nominated point of discharge. 2.3 POTENTIAL LAND-USE / DEVLOPMENT POTENTIAL The land parcel will be divided into three (3) community use lots and one (1) balance lot, including associated road and drainage reserve. The balance lot will be provided as a provision for the future expansion of the Cooroy Cemetery that currently operates on the adjacent land. The ultimate case for the development utilised for engineering design is a maximum expected yield of 130 units with a mix of one-, two- and three-bedroom units spread across the three community use lots. It is assumed that these units and/or buildings will have a maximum of three stories. For further details, refer to the Operational Works Plans. 62 Lake Macdonald Drive, Cooroy – Engineering Services Report Page 1 233467 | M24-1037Rpt – Issue A – April 2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Final Engineering services report _62 Lake Macdonald Drive.pdfRelated documentApplication case desk ↗
About this file
- File size
- 27.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.