Council archive · source document
Final Engineering services report _62 Lake Macdonald Drive · OPW25/0057
Very large file (27.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 47, section 5. The text section number identifies this passage in the reader.
00
ta
re
search should be performed before the commencement of any
excavation work. The property boundaries shown have not fully
determination of the boundaries, an Identification survey will be
Notes: Contour Interval is 0.5 metres. Underground services have been
0
located from visible surface features only . A Dial Before You Dig
been investigated for the purposes of this survey. For an accurate
.0
00 3
120 . 11 tre
d3 e
.00
NOTE:
00
1112. 00
11
TE
conc.
Drawn:
d/way
0 ma
Datum:
RL 108.138
119 . 0 il EP
PSM 178243
bo L
x
SM WM
LI H
Form 6 Dated 29.02.24
CAC
27 EP
13 8°50 118 .00 L
8.4 '3
97 0"
0
. 0
retaining wall
17
Noosa Shire Council
1
F.Bk
F.W.
Scale
00 ma
il
d/wa
6.
conc
FH bo
y
Acc. Bk
.
3 x
00
11
Level Bk
.
C 3
d
.
10
560
0
0
co /wa
16 1
111 . 00
nc y
EP T SP
13
-
L E
5.
WM WM 176
11
96
8
CAC
00
A1 1:500
conc. path
4.
11
00
3.
2. Meridian is MGA (Zone 56) vide SP176968
11
from council records and field measurements.
0
0
File
2.
14
Date
SP
TB 11 176
96
E 4 M (pk 8
N 7 9172 t )
RL 0788 0.40
11 0 8
0.6 6.44
2
100988
81
05.04.24
100988 DTM
Job & Plan No.
1. Sewer & Stormwater pipe IL's & diameters have been plotted
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Final Engineering services report _62 Lake Macdonald Drive.pdfRelated documentApplication case desk ↗
About this file
- File size
- 27.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.