Original source · versioned page text
Approval Plans OPW16-0203.01 pdf
The original of this document is very large (21.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn- NOOSA COUNCIL APPROVED PLAN OPW16/0203 5 DEC 2016 [OCR of page images] PALM LAKE RESORT - COOROY 19 TRADING POST ROAD, COOROY DRAWING INDEX ROADWORKS AND DRAINAGE 16-001014-100 16-001014-101 16-001014-102 16-001014-103 16-001014-104 16-001014-105 16-001014-106 16-001014-107 16-001014-108 16-001014-109 16-001014-110 16-001014-111 16-001014-112 16-001014-113 16-001014-114 16-001014-115 16-001014-116 16-001014-117 16-001014-118 16-001014-119 16-001014-120 16-001014-121 16-001014-122 SEWERAGE RETICULATION 16-001014-200 16-001014-202 16-001014-203 16-001014-210 WATER SUPPLY 16-001014-300 16-001014-301 STORMWATER QUALITY 16-001014-400 16-001014-401 16-001014-402 16-001014-403 16-001014-404 CENTRAL BASIN SETOUT PLAN SHEET 1 OF 4 16-001014-405 CENTRAL BASIN SETOUT PLAN SHEET 2 OF 4& 16-001014-406 CENTRAL BASIN SETOUT PLAN SHEET 3 OF 4& 16-001014-407 CENTRAL BASIN SETOUT PLAN SHEET 4 OF & 16-001014-408 16-001014-409 16-001014-410 16-001014-411 16-001014-412 16-001014-413 DRAWING INDEX AND LOCALITY PLAN OVERALL LAYOUT PLAN ROADWORKS AND DRAINAGE LAYOUT PLAN ROADWORKS AND DRAINAGE NOTES AND DETAILS BULK EARTHWORKS LAYOUT PLAN BULK EARTHWORKS NOTES, DETAILS AND SECTIONS EROSION AND SEDIMENT CONTROL LAYOUT PLAN EROSION AND SEDIMENT CONTROL NOTES AND DETAILS ROAD 2 LONGITUDINAL SECTION ROADS 11, 12 AND 13 LONGITUDINAL SECTIONS AND TYPICAL SECTIONS CARPARK SETOUT AND DETAILS SURVEY SETOUT LAYOUT PLAN STORMWATER DRAINAGE CATCHMENT PLAN SHEET 1 OF 2 STORMWATER DRAINAGE CATCHMENT PLAN SHEET 2 OF 2 STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 1 STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 2 STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 3 STORMWATER DRAINAGE Q10 CALCULATIONS TABLE STORMWATER DRAINAGE Q100 CALCULATIONS TABLE STORMWATER DRAINAGE STRUCTURE DETAILS SHEET 1 OF 2 STORMWATER DRAINAGE STRUCTURE DETAILS SHEET 2 OF 2 FOOTPATH SETOUT AND LONGITUDINAL SECTIONS FOOTPATH CROSS SECTIONS OF 3 OF 3 OF 3 SEWERAGE RETICULATION NOTES AND LOCALITY PLAN SEWERAGE RETICULATION LONGITUDINAL SECTION SHEET 1 OF 2 SEWERAGE RETICULATION LONGITUDINAL SECTION SHEET 2 OF 2 SANITARY SERVICES SITE PLAN WATER SUPPLY NOTES AND DETAILS WATER SUPPLY LAYOUT PLAN WATER QUALITY NOTES AND DETAILS SOUTHERN BIORETENTION BASIN LAYOUT PLAN SOUTHERN BIORETENTION BASIN SECTIONS CENTRAL BASIN LAYOUT PLAN CENTRAL BASIN SECTIONS SHEET 1 OF 2 CENTRAL BASIN SECTIONS SHEET 2 OF 2 WATER QUALITY RISER OUTLET PIT DETAILS NORTHERN BASIN LAYOUT PLAN NORTHERN BASIN SECTIONS NORTHERN BASIN DETAILS STAGE 2 CONSTRUCTION HOLD POINT PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL VERIFY LEVELS OF ALL EXISTING CROSSINGS AND CONNECTION POINTS. CONSTRUCTION HOLD POINT ONCE THE BASE OF MANHOLES, INSPECTION PITS, GULLIES AND FIELD INLETS FOR STORMWATER DRAINAGE AND SEWER RETICULATION HAVE BEEN POURED, FURTHER CONSTRUCTION SHALL NOT PROCEED UNTIL THE SUPERINTENDENT AND OR ENGINEER HAVE INSPECTED THE WORKS FOR FINISHED LEVELS AND APPROVED CONSTRUCTION TO CONTINUE. CONSTRUCTION NOTE THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH: - STORMWATER QUALITY MANAGEMENT REPORT - CALIBRE CONSULTING - 16-001014-01A - SEPTEMBER 2016 - STORMWATER MANAGEMENT CONSTRUCTION AND MAINTENANCE - CALIBRE CONSULTING - 16-001014-02A - SEPTEMBER 2015 - TRAFFIC IMPACT ASSESSMENT - CALIBRE CONSULTING - B14158ERO1C - DECEMBER 2014 - ACOUSTIC ASSESSMENT REPORT - ASK CONSULTING ENGINEERS - 7617RO1VO2 10/02/16 - ELECTRICAL CONSULTANTS PLANS - ELECTRO TECHNICAL CONSULTANTS - K3173 DRAWING SET (ENERGEX PROJECT NUMBER - $0500378) - LANDSCAPE ARCHITECT PLANS - TBA No. OF LOTS : 1 No. UNITS = 65 AREA OF SITE = 2.9 ha RP DESCRIPTION LOT 1 ON RP215922 PARISH OF TEWANTIN COUNTY OF MARCH DATUM LEVEL P.S.M. 24974 RL 110.614 AHD NOOSA COUNCIL APPROVED PLAN OPW16/0203 5 DEC 2016 =) LOCALITY PLAN NTS. U.B.D. REF: AUSTRALIAN CITY STREETS MAP: 4 | GRID: R20 N.S.C. REF NO. MCU15/0111 & REC15/0031 Test [case ama] are con oneox SALE METRES THCROFEN Wo Tien TaAWEIG THE AMENDMENT DETALLES SURVEYOR: ML_ SURVEYS Tk F + Tr TSSUED FOR CONSTRUCTION - PENDING COUNCIL APPROVAL FB teybourne pireet. Chelmer QLD 4068 PALM LAKE WORKS PTY LTD < —— (CONSULT AUSTRALIA DRAWING INDEX AND uw mr Job: [email protected] y é 8 BF _[ BF | 31.10.16 [ORAWING INDEX AMENDED or we a a PROIEGT — A LOCALITY PLAN ie moon oo |e ne PALM LAKE RESORT calibre Se en e % DRAWS WER eve Ne 16-00101 f . Telephone 07 3895 3444 Facsimile 07 36953400 SomeaNY Sir FOR 2 ON BEHALF OF CAUBRE CORSULTING (QLD! PTY LTD STAGE 2 CONSULTING rcure uaa te ws acco ORM 16-001014-100 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.