Original source · versioned page text
Approval Plans OPW16-0203.01 pdf
The original of this document is very large (21.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn -
NOOSA COUNCIL
APPROVED PLAN
OPW16/0203 5 DEC 2016
[OCR of page images]
g g Gg 2 FF gg F |& Jeg gs | S < SF €&] } & ol oS) 6) Ue SO
= N
STRUCTURE oO un + ma N = K ~~ “6 << =- © w = al ~ = = s i a a a\Q io a
NAME & 3 5 ~ BG) 3
o oS cc a a oO =
6
7 Zz Z
ws we ry we ~ 2
s is s |g z le 2 2: :
& & & eb ale 2 = 2
STRUCTURE 7 S S S 7 a [aS tle >I ole eo wes oe =
? > > ? 3 4 we a\. le = Sle a
DESCRIPTION Blois a} | g/88 2/8 a\z= 2/8 e|2 3|- gee | §
je Ze zie dle ze gl Bg) dize a], alt “52 aif sl. ogi, gle ale 2 gee 7
l= la gfe sir gir OIE gg = eles Z|6 #8 wleS EIS Z\8 =\s 2/6 2/2 FF sa 7 ° ° alae o .
z/8 =|2 zis EB #8 Fle Slo B Fle2 |e 3)~ Flse Bl x Ele Ele Fle e/2 HIB Sle & g g Ele2 2 Zz
als als ols ols ols als =z|£ a S|t#S ols le celts ale ols als als &lg Se ols . . . sles a 2
als BIS BIS BIS BR Be BA 3s Glee GS ols alse 3|8 ale als ae s|f se Be aR R R Bees 3 3
NOTE:
4, NOTWITHSTANDING THE STORMWATER Oto HEL
STRUCTURE LEVELS SHOWN, THE COVER TYPICAL)
OR GRATE LEVEL SHALL SUIT THE
FINISHED SURFACE PROFILE. - NOOSA COUNCIL
2, THE PIPE CLASSES HAVE BEEN a
DESIGNED FOR SERVICE LOADS ONLY. > g - yy APPROVED PLAN
THE CONTRACTOR SHALL ASSESS sl 3 Lp
I 3 4
ANTICIPATED LOADS AND UPGRADE THE = 6 EI 3 ™ OPW16/0203 5 DEC 2016
PIPE CLASSES IF NECESSARY IN 2 q 3 -- op
ACCORDANCE WITH AS 3725-2007. = ig g - [ ~-- SN L Id
CRACKED PIPES WILL NOT BE ACCEPTED. led EE [
3. CONTRACTOR TO CHECK EXISTING i — _\ |
CONNECTIONS PRIOR TO CONSTRUCTION. SI PI ‘| NI
4, SURCHARGE DURING A Q100 EVENT IS ~ S -
PICKED UP PARTIALLY DOWNSTREAM A =
AND THE REMAINING CONTRIBUTES TO EN iz \ EXTEND EXISTING CONSTRUCT SPLITTER MANHOLE | 4S |
OVERLAND FLOW. FLOOD WIDTHS DO RSS. CONSTRUCT 900@ APPROX. 3.8m OVER EXISTING 825 PIPE REFER
NOT EXCEED ROAD RESERVE DURING Qw H.G.L. mS FIELD INLET DRG 16-001014-119 FOR DETAIL —J
MODELLED Q100 EVENT (TYPICAL) aa OVER EXISTING
5, DRAINAGE SYSTEM FOR STAGE 2 HAS LINE E HAS BEEN
BEEN DESIGNED TO MAXIMISE CAPTURE | DESIGNED TO CONVEY | 900D PIPE
AND MINIMISE OVERLAND FLOW DUE TO 33 L/s SURCHARGE 3 MONTH FLOW TO GPT
LARGE UPSTREAM CATCHMENTS.
pene Note event. EXISTING STAGE EXISTING STAGE
1A WORKS EXISTING STAGE_1A_WORKS 4A WORKS
PIPE SIZE mm (Class) 300 300 375 525 750 600 900 900 900 900 900 600 600 600 600 600 825, 900
BLACKMAXT | TBLACKMAXT| “IBLACK | “(BLACK (2) BLACK (2) (2) (2) (2) (2) BLACK (BLACK MAX) (BLACK “BLACK” | TBLACK™ (2) (2)
MAX) | MAX) MAX) MAX) MAX) | MAX) | MAX)
PIPE GRADE (%) 4.86% 4.90% | 4.06% |_ 1.09%, |_ 0.40% |_ 0.29%, |_ 0.30% 0.31% 0.50% 1.00% 0.48% 9.40% 0.40% 3.00% 3.00% 3.00%, | 5.16%, |_ 3.00%, | 4.45%, | 0.50%
PIPE SLOPE (1 in X) 20.59 20.43 | 24.76 | 91.88 "| 249.86” | 350.72 | 333.34 325.48 200.00 99.88 206.21 250.01 250.00 33.33 33.33 33.33 | 19.37 | 33.32 "| 22.49 | 200.09
FULL PIPE VELOCITY (m/s) 0.80 1.61 1.61 os? | oss 1 1 0. 190 2,001.90 ty) 2.01.93 ty) | 2,011.93 4 2.63 28 2.63 |. 2.63 |. 2.63 | 0.77 | 2.40
PART FULL VELOCITY (m/s)| 25 3.08 3.20 [19 1 150 154 1. 1 4.07 4.0 4.07} 5.01 | 4.07 | 3.95 | 2.40
91.0 90.0 87.0 86.0 89.0
ele =al Seis ele gale eel 938 eele ele aegis sie esl|k 8 g 2 8 g alg alg eae ss/a ssl Bela sia sale
H.G.L IN PIPE & gle gle dels ssl sels ssle dele Ssif S/S ssl sie sje 5 z z e| 2) es sls aele gele sels sele dele Sele
W.S.E_IN STRUCTURE aa - Sy ye ese = 7 = s 2 cS 22/8 3 8 3 ss|S sss
sje gis age cle 2
PIPE FLOW 0.056 0.114, 0.177 | 0.108 | 0.246 | 0.492 | 0.492 0.247 0.924 als els S/S sis $ 0.744 0.744 0.744 | 0.744 | 0.744 | 0.409 | 1.526
(Cumecs)
PIPE CAPACITY 0.213 0.216 0.353 | 0.449 | 0.705 0.595 0.610 0.340 1.281 1.250 1317 1317 1317 1.064 1.064 1.064 1.396 1.064 3.028 1.280
AT GRADE (Cumecs)
DEPTH To VERT 2 ge Se 2 S 82 se ge Se & Za ol, ele ale ela 2 Ral ae ge © &&8 3g 23
= 2/5 a3 a2 a|S a Be =| ele 2 a|2 = AIS gS Sim B/e q/e S = Ala ale a2 Ala Hla Als ala
INVERT LEVEL & 3&8 GR 8/8 g]8 SR SIS SE jf SiR 8 as |g 2|8 alg 3/8 8 a &|8 ge as RR g|2 se §[s
OF DRAIN es 85 88 ge Se Fe se =F |e Fe ae fe ala ale B|R 8 2 sls sls sis sie sls als
8 8 7 | a} 0 OS) BG 8 3} gs} 8 s R g 2 gs} 8 gs 68) RR]
DESIGN SURFACE 3 8 g g g g 2 s s g 2 = g gS 3 S 3 s 5 2 z 2 g 5 8
LEVEL i ests =z —ate —s] 2 {|__|
SETOUT ee se #8 88 s/8 Sg fe g8 ge fle gle 22 a2 ee ee ge ge Sls
COORDINATES “= ule wf eee wiz lz lz
= 7 zg 3 3 = 5 7 s e 2 8 5 2 = 2 a 7 7 a B 3 z g =
RUNNING =| 26.750 38] 25.500 gi] 12.9038] s.oo0g'| 5.9577] 4.91028 5.5072 S| 045s s 38.420 = 37.406 75.678 S] as qe =} 223372 2] eo 86.120 S| 6.844%] 12.000] 10.3736 31878] 11.7634
CHAINAGE £ & &
LINE N.S.C. REF NO. MCU15/0111 & REC15/0031
Fast [eae [ome] OA SORE CHET T TEGROFLN Nos coeNT TAREE
sso [ay | AY | 27.06.16 AMENDMENT DETAILS Fy “| 11000 0 0120-30050 SURVEYOR: ML_SURVEYS PALM LAKE WORKS PTY STORMWATER DRAINAGE
“ATA | BF _| BF | 07.09.16 | ISSUED FOR CONSTRUCTION - PENDING COUNCIL APPROVAL 20 43 38 Leybourne Street, Chelmer QLD 4068 LTD 5 coaern
at ; RORIZONTAL Mob: 0412 744 223 E: [email protected] | ) LONGITUDINAL SECTIONS
K 7
Bic Deawacrecx| 1100 2 1 0 2 sm PROMECT Ho. ‘APPROVED y Calibre Consulting (QLD) Py Lid ‘uy SHEET 2 OF 3
40 Ee 2 —— a 43 16-001014 Mal ANDREW MCPHAIL RPEQ 6921 PALM GORE RESORT calibre Ge San Sg ts QD An 0 Sey THAWING HOUSER See
NIE VERTICAL a Telephone 07 3895 3444 Focsimile 07 3895 3400
air FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD STAGE 2 CONSULTING tau Catan istine ty Sappen Setiacont SOREL 16-001014-115 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.