Original source · versioned page text
Approval Plans OPW16-0203.01 pdf
The original of this document is very large (21.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn -
NOOSA COUNCIL
APPROVED PLAN
OPW16/0203 5 DEC 2016
[OCR of page images]
—=
NOTE:
REFER TO LANDSCAPE ARCHITECT
DRAWINGS FOR BIO-RETENTION BASIN LS _ ~ SS SD
BATTER TREATMENTS AND BASIN PLANTING / Lc eo N
= —— N
4 PROPOSED 1200 x 1200 FIELD INLET EXISITNG 900 STORMWATER PIPE TO CONVEY
NOTE:
REFER TO DRG. 16-001014-110 FOR CARPARK)
SETOUT AND DETAILS.
NOTE:
REFER TO DRG. 16-001014-400 FOR TYPICAL
WATER QUALITY NOTES AND DETAILS
4
Z
PRIMARY OUTLET PIT TO DIVERT
63% ARP PEAK FLOWS TOWARDS
CENTRAL BASIN (RL 102.0mAHD)
PEAK FLOWS OF THE 63% ARP STORM
TO BE EXTENDED APPROX. 3.8m EXACT
LOCATION TO BE DETERMINED ON SITE
N
RL 103.00
RL 102.00
\
A
x
EVENT, \
\
‘
EXISITNG @900 STORMWATER PIPE
\ TO CONVEY PEAK FLOWS ABOVE
\ THE 63% ARP STORM EVENT
PROPOSED 1200 x 1200 FIELD INLET
SECONDARY OUTLET PIT TO CONVEY \
PEAK FLOWS ABOVE 63% AEP >)
\
LEGEND
EXISTING SURFACE CONTOUR
EXISTING SURFACE CONTOUR
BATTERS (GRADE AS SPECIFIED)
PROPOSED ROCK RETAINING WALL
CONCRETE SLEEPER RETAINING WALL
PROPOSED STORMWATER PIPE
225® SUBSOIL COLLECTOR
100@ SUBSOIL AND CLEANOUT POINTS
SAFETY FENCE - REFER LANDSCAPE
ARCHITECT PLANS FOR DETAILS.
ROCK ARMOURING SCOUR PROTECTION
TURF REINFORCED WITH ENKAMAT
OR APPROVED EQUIVALENT
Q100 OVERLAND FLOW
BIORETENTION BASIN FILTER MEDIA
REFER DRG. 16-001014-400 FOR DETAIL
BASIN SETOUT TABLE
PROPOSED RETAINING WALL (MAXIMUM
71m WALL HEIGHT) SAFETY FENCING TO
BE PROVIDED ALONG RETAINING WALL
TOW = RL 103.30
BOW = RL 102.55 ‘ Es io
T 7 OUTHERN BASIN (BIORETENTION SYSTEM ROCK PROTECTION
| . FILTER AREA = 310m? (oy 30
\ y SURFACE LEVEL = 101.7m AHD
< FILTER DEPTH = 0.4m
Wo TEMPORARY PONDING DEPTH
\ ONS
\ in
\ \
25% PIPE TO OUTLET THROUG!
ASE OF WALL I.L.101.710.
EFER DRG. 16-001014-400 FOR
2.5m WIDE KERB ,/
BREAKOUT FOR
OVERLAND FLOW
RL 101.70
7
Z
STORM EVENT (RL 102.3mAHD)
\ YY \\> 7S
\
\ ( ;
RL 103.65 '
RL 102.875 Hy
CUSTOM CONCRETE q
<j HEADWALL EXACT LOCATION & /
e TO BE CONFIRMED ON SITE —
Ore.
*
1
1
1
\
7
“
uv
HUMEGARD GPT
_-REFER TO DRG |
<< NO, 16-001014-115 |
FOR DETAILS \
A
XN 1
\ !
se!
SPLITTER MANHOLE TO
DIRECT 3 MONTH ARI PEAK
, FLOWS INTO GPT AND
7 LARGER EVENTS DIRECTLY
INTO SOUTHERN BASIN
| 3.0m WIDE BASIN
| ACCESS TRACK.
t
\
(
'
\
l
l
1
MAINTENANCE ACCESS GATE
TO BE IN ACCORDANCE WITH
POOL SAFETY GUIDELINES
TOW
BOW
RL 103.65
RL 102.20
PAD RL 103.65m AHD
! Ms
POINT No, | EASTING | NORTHING [RL
805.831 872.253 703.000
802.533 876.855 101.710
799.483 8B1.112 102.000
797.575 880.316 101.700
794.697 887.000 102.000
793.148 885.735 101.700
781.694 887.842 102.000
783.067 886.388 101.700
778.817 882.375 101.700
T1424 878.146 102.550
778.613 875,306 101.700
ZY 782.073 871.642 101.700
. 789.155 868.824 101.700
PROVIDE 0.5m WIDE MIN. ROCK SCOUR th 789.149 B6B.344 101.750
Pe STON OF MALE TERGENCY 792.109 867.858 101.750
Dep = 200mm 16 788.792 866.168 101.900
THICKNESS = 300mm 7 791.752 865.683 101.870
8 785.565 859.057 103.117
9 788.469 857.904 103.102
20 784.287 857.690 103.254
a 786.346 855.509 103.299
2 783.900 857.325 103.262
2B 785.959 855.143 103,307
EXISTING 900% PIPE TO
CONVEY MINOR DESIGN
STORM (Q10) FROM FUTURE
1
\
1
{ | /
1
1
I
: /
STORMWATER DRAINAGE SIZED
FOR 63% AEP STORM EVENT ~~
/
HUMEGARD GPT
REFER TO DRG
NO. 16-001014-116
FOR DETAILS
SPLITTER MANHOLE TO DIRECT 1
YEAR ARI PEAK FLOWS INTO
SOUTHERN BASIN AND LARGER
EVENTS NORTH
\
BNE v7
NOOSA COUNCIL
APPROVED PLAN
OPW16/0203 5 DEC 2016
N.S.C. REF NO. MCU15/0111 & REC15/0031
wer Tae verALe pesian creck GONE CMETHES T menor" | surVEYOR: ML_SURVEYS “ rn aoe SOUTHERN BIORETENTION
a | SCO ae ee Hoo We ND 2 rreyOmisureyseonoy |__PALM LAKE WORKS PTY LTD C- se BASIN LAYOUT PLAN
ie Soave oncon} 1200 pnoveey Ha TROD Ho PALM LAKE RESORT il Cale Consulting (QLD) Py Ltd ‘oat
: D 7 ANDREW MCPHAIL RPEQ 6921 COOROY Cal | re Gren Fo, 545 Quen Sr ror, CLD Asis 000 ESOS) FSR Rwana UMBER Te80E
HE cM ‘600101 wal, : Oe au nv STAGE 2 CONSULTING stent Sent" 16-001014-401 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.