Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

13142-C02-A0-Signed · OPW13/0962

of 1

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

¢
=
=
oO
a
2
>
<t
a

a

TBM

NAIL IN KERB

AHD RL 13.37

BE PLACED OVER NEW FIELD
INLET FOLLOWING CONSTRUCTION
AND UNTIL SUCH TIME AS THE
SITE IS STABILISED.

|
fof |

(4 |

SANDBAGS OVERLAP
ONTO KERB

OPTIONAL FILTER CLOTH
FIXED TO GRATE

 
  
 
 
  
   

RUNOFF

600 (NOM) GAP BYPASS FLOW TO INLET
BETWEEN BAGS

ACT AS SPILLWAY
THREE LAYERS OF

SANDBAGS WITH ENDS
OVERLAPPED

ON-GRADE GULLY

BERM (0.3m
MIN HEIGHT)

 
 
    

CONSTRUCTION SITE

GEOTEXTILE

FABRIC
PROPERTY
ALIGNMENT:

RUNOFF FROM PAD CRUSHED ROCK
DIRECTED TO SEDIMENT TRAP

EXISTING OR NEW ROADWAY

TEMPORARY CONSTRUCTION EXIT/ENTRANCE

 

“4
bee J a
86
M11112

|
| pf CONTRACTOR TO CONFIRM
LOCATION OF SHAKE
| DOWN GRID ON SITE

 

 

 

 

 

 
  

    

 

  

 

 

 

 

  

 

 

 

 

 

 

t

tL: (

   

/FFL12'500 |} EEL 11.975
¥ }

 

 

 

 

 

t
v2
}

 

 

 

SSS SE 2.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

t
IES: 4 |
\ \ if Sere \
\ ‘ F A aye ON
VIE Piper YN VN
7 Y el \ | x I
“| of | & | y \ iF
774
4 82

4 RP222726

ROLL OF NETTING FILLED
WITH 50 TO 75mm GRAVEL
CRIMPED AT BOTH ENDS

 

 

 

 

 

10mm GRAVEL FILLED HESSIAN
BAGS PACKED TIGHTLY

 

PERMEABLE MATERIAL TO
BE USED TO INTERCEPT
SEDIMENT LADEN RUNOFF
SUITABLY FIXED TO GRATE

SAG GULLY

DRAINAGE STRUCTURE PROTECTION

DRAINAGE INLET SEDIMENT TRAP. NTS

WEIR TO BE 600mm —+*—————+}
WIDE UNO. ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LAYOUT PLAN 4
>] _ nT
z =F]
ao 6 |
S|
5 i |
H
CZZIZ5Z

CONSTRUCT WEIR " —- WEIR HEIGHT TO BE

SIMILAR TO Vv ¥ 500mm UNO. ON

SEDIMENT FENCE LAYOUT PLAN

SEDIMENT FENCE WEIR

 

AROUND GRATED INLET

<e Ee

J

SECTION ca)
QS

FIELD INLET

 

 

 

 

 

 

 

 

 
 
 
 
 

DISTURBED AREA

FENCING WIRE
Re,
Cc
0 7

a 10,
w ON o
ee

 
     

any v
STAR PICKET
POSTS DRIVEN
500mm - 700mm
DETAIL OF OVERLAR,

 
 
  
 

500_MIN

v v
UNDISTURBED AREA

v v v

SEDIMENT FENCE

PROPOSED

LLLLLLL LLL BUILDING EXTENT

LOT BOUNDARY

CONTOUR MAJOR (1.000
INTERVAL)

CONTOUR MINOR (0.250
INTERVAL)

KERB EXTENT. REFER TO
DRG 13143/C10 FOR DETAILS
EARTHWORKS PAD
SEDIMENT FENCE. REFER
DETAIL

SEDIMENT FENCE WEIR.
REFER DETAIL

DRAINAGE STRUCTURE
PROTECTION. REFER DRG

DETAIL
SHAKE DOWN GRID. REFER

BOSE DETAIL

EXISTING

LLLLLLLLL LZ. BUILDING EXTENT

KERB AND CHANNEL

 

LOT BOUNDARY
CONTOUR MAJOR (1.000m

INTERVAL
~ ___ CONTOUR MINOR (0.250m
INTERVAL
——-—-—sw— STORMWATER
—-———~s——__ SEWER
—-———W—— WATER
——-——T——___ TELSTRA
-——~0/H-E— OVERHEAD ELECTRICITY

EROSION AND SEDIMENT CONTROL NOTES

1. EROSION & SEDIMENT CONTROL (ESC) NOTES ARE TO BE READ IN CONJUNCTION WITH
THE GENERAL AND COORDINATION NOTES ON DRAWING 13142/C00
2. ALL ESC MEASURES SHALL BE IN ACCORDANCE CURRENT COUNCIL STANDARDS,
DRAWINGS AND SPECIFICATIONS U.N.O
3. CONSTRUCTION OF ALL SEDIMENT CONTROL MANAGEMENT DEVICES SHALL BE TO THE
SATISFACTION OF THE SUPERINTENDENT. THE CONTRACTOR IS TO FOLLOW THE
CONSTRUCTION PHASE AS OUTLINED:

3.4. CONSTRUCTION OF EROSION AND SEDIMENT DEVICES;

3.B. STRIPPING TOPSOIL;

3.C, BULK EARTHWORKS;

3.D. SERVICES, BUILDING, PAVEMENT AND ROAD CONSTRUCTION;

3.E. LANDSCAPED AREAS TO BE TOPSOILED, TURFED, MULCHED OR PLANTED.
4. BOTH TEMPORARY AND PERMANENT ESC MEASURES SHALL BE MAINTAINED AT A
SUITABLE LEVEL/CONDITION THROUGHOUT CONSTRUCTION TO THE SATISFACTION OF THE
SUPERINTENDENT.
5. ALL TEMPORARY ESC MEASURES SHALL BE MAINTAINED AND FULLY OPERATIONAL
DURING THE CONSTRUCTION AND MAINTENANCE PERIOD, AND ARE TO BE REMOVED AFTER
THE SATISFACTORY COMPLETION OF AN ‘OFF MAINTENANCE’ INSPECTION BY THE
SUPERINTENDENT
6. ALL ESC DEVICES ARE TO BE INSPECTED AT LEAST DAILY, PRIOR TO EXPECTED
RAINFALL AND AFTER RAINFALL. ANY DAMAGE OR EXCESS EROSION/SEDIMENT IS TO BE
REPAIRED/MANAGED AS REQUIRED TO MAINTAIN CONTROL DEVICES.
7. THE CONTRACTOR IS TO PROVIDE WATER TRUCKS AS REQUIRED TO MINIMISE OR
ELIMINATE THE DUST PROBLEMS CAUSED BY ONSITE TRAFFIC MOVEMENT.
8. THE CONTRACTORS VEHICLES & PLANT SHALL NOT OPERATE OUTSIDE THE LIMITS OF
THE IMMEDIATE CONSTRUCTION AREA AND ARE RESTRICTED FROM CROSSING OR
DISTURBING AREAS NOT SUBJECT TO CONSTRUCTION
9. ALL VEHICLES EXITING THE SITE SHALL BE CLEANED AND TREATED SO AS TO
PREVENT MATERIAL BEING TRACKED OR DEPOSITED ON PUBLIC ROADS.
10. ALL DISTURBED GROUND IS TO BE GRASS SEEDED TO PREVENT EROSION IF THE
DISTURBED GROUND IS TO BE LEFT “OPEN” FOR A PERIOD OF GREATER THEN ONE (1)
MONTH

 

 

SHAKE DOWN DEVICE 26 0 2 6 8 10
ad ws SCALE 1:200 (A1 SIZE}
Trent P: (07) 3369 8411. [Seams tr av Frome Draeha te
ALTUM CONSTRUCTIONS F: (07) 3369 1893, ESEsuOwy PROPOSED UNIT DEVELOPMENT |/EROSION AND SEDIMENT
Et [email protected]. au a eee
EORSUEING PRCINGERS | sammmeneceypemey L—@ [4 _|/AT CONTROL PLAN
EEO TICnNO Tanne: iiawinctocsmmemce, L&%.p Nov 2 [20 & 22 TRISTANIA DRIVE,
AO | FOR APPROVAL 28.1113 | HM 1 GreatG Str - a ee 2 MARCUS BEACH Drawing No Revision Code
CODE REVISION pate | BY ||CODE REVISION Pavoin - ° a “Quo 40 64 ©) c Z |weo__ il 40 13142/C02

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

13142-C02-A0-Signed.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.