Council archive · source document
13142-C02-A0-Signed · OPW13/0962
¢
=
=
oO
a
2
>
<t
a
a
TBM
NAIL IN KERB
AHD RL 13.37
BE PLACED OVER NEW FIELD
INLET FOLLOWING CONSTRUCTION
AND UNTIL SUCH TIME AS THE
SITE IS STABILISED.
|
fof |
(4 |
SANDBAGS OVERLAP
ONTO KERB
OPTIONAL FILTER CLOTH
FIXED TO GRATE
RUNOFF
600 (NOM) GAP BYPASS FLOW TO INLET
BETWEEN BAGS
ACT AS SPILLWAY
THREE LAYERS OF
SANDBAGS WITH ENDS
OVERLAPPED
ON-GRADE GULLY
BERM (0.3m
MIN HEIGHT)
CONSTRUCTION SITE
GEOTEXTILE
FABRIC
PROPERTY
ALIGNMENT:
RUNOFF FROM PAD CRUSHED ROCK
DIRECTED TO SEDIMENT TRAP
EXISTING OR NEW ROADWAY
TEMPORARY CONSTRUCTION EXIT/ENTRANCE
“4
bee J a
86
M11112
|
| pf CONTRACTOR TO CONFIRM
LOCATION OF SHAKE
| DOWN GRID ON SITE
t
tL: (
/FFL12'500 |} EEL 11.975
¥ }
t
v2
}
SSS SE 2.0
t
IES: 4 |
\ \ if Sere \
\ ‘ F A aye ON
VIE Piper YN VN
7 Y el \ | x I
“| of | & | y \ iF
774
4 82
4 RP222726
ROLL OF NETTING FILLED
WITH 50 TO 75mm GRAVEL
CRIMPED AT BOTH ENDS
10mm GRAVEL FILLED HESSIAN
BAGS PACKED TIGHTLY
PERMEABLE MATERIAL TO
BE USED TO INTERCEPT
SEDIMENT LADEN RUNOFF
SUITABLY FIXED TO GRATE
SAG GULLY
DRAINAGE STRUCTURE PROTECTION
DRAINAGE INLET SEDIMENT TRAP. NTS
WEIR TO BE 600mm —+*—————+}
WIDE UNO. ON
LAYOUT PLAN 4
>] _ nT
z =F]
ao 6 |
S|
5 i |
H
CZZIZ5Z
CONSTRUCT WEIR " —- WEIR HEIGHT TO BE
SIMILAR TO Vv ¥ 500mm UNO. ON
SEDIMENT FENCE LAYOUT PLAN
SEDIMENT FENCE WEIR
AROUND GRATED INLET
<e Ee
J
SECTION ca)
QS
FIELD INLET
DISTURBED AREA
FENCING WIRE
Re,
Cc
0 7
a 10,
w ON o
ee
any v
STAR PICKET
POSTS DRIVEN
500mm - 700mm
DETAIL OF OVERLAR,
500_MIN
v v
UNDISTURBED AREA
v v v
SEDIMENT FENCE
PROPOSED
LLLLLLL LLL BUILDING EXTENT
LOT BOUNDARY
CONTOUR MAJOR (1.000
INTERVAL)
CONTOUR MINOR (0.250
INTERVAL)
KERB EXTENT. REFER TO
DRG 13143/C10 FOR DETAILS
EARTHWORKS PAD
SEDIMENT FENCE. REFER
DETAIL
SEDIMENT FENCE WEIR.
REFER DETAIL
DRAINAGE STRUCTURE
PROTECTION. REFER DRG
DETAIL
SHAKE DOWN GRID. REFER
BOSE DETAIL
EXISTING
LLLLLLLLL LZ. BUILDING EXTENT
KERB AND CHANNEL
LOT BOUNDARY
CONTOUR MAJOR (1.000m
INTERVAL
~ ___ CONTOUR MINOR (0.250m
INTERVAL
——-—-—sw— STORMWATER
—-———~s——__ SEWER
—-———W—— WATER
——-——T——___ TELSTRA
-——~0/H-E— OVERHEAD ELECTRICITY
EROSION AND SEDIMENT CONTROL NOTES
1. EROSION & SEDIMENT CONTROL (ESC) NOTES ARE TO BE READ IN CONJUNCTION WITH
THE GENERAL AND COORDINATION NOTES ON DRAWING 13142/C00
2. ALL ESC MEASURES SHALL BE IN ACCORDANCE CURRENT COUNCIL STANDARDS,
DRAWINGS AND SPECIFICATIONS U.N.O
3. CONSTRUCTION OF ALL SEDIMENT CONTROL MANAGEMENT DEVICES SHALL BE TO THE
SATISFACTION OF THE SUPERINTENDENT. THE CONTRACTOR IS TO FOLLOW THE
CONSTRUCTION PHASE AS OUTLINED:
3.4. CONSTRUCTION OF EROSION AND SEDIMENT DEVICES;
3.B. STRIPPING TOPSOIL;
3.C, BULK EARTHWORKS;
3.D. SERVICES, BUILDING, PAVEMENT AND ROAD CONSTRUCTION;
3.E. LANDSCAPED AREAS TO BE TOPSOILED, TURFED, MULCHED OR PLANTED.
4. BOTH TEMPORARY AND PERMANENT ESC MEASURES SHALL BE MAINTAINED AT A
SUITABLE LEVEL/CONDITION THROUGHOUT CONSTRUCTION TO THE SATISFACTION OF THE
SUPERINTENDENT.
5. ALL TEMPORARY ESC MEASURES SHALL BE MAINTAINED AND FULLY OPERATIONAL
DURING THE CONSTRUCTION AND MAINTENANCE PERIOD, AND ARE TO BE REMOVED AFTER
THE SATISFACTORY COMPLETION OF AN ‘OFF MAINTENANCE’ INSPECTION BY THE
SUPERINTENDENT
6. ALL ESC DEVICES ARE TO BE INSPECTED AT LEAST DAILY, PRIOR TO EXPECTED
RAINFALL AND AFTER RAINFALL. ANY DAMAGE OR EXCESS EROSION/SEDIMENT IS TO BE
REPAIRED/MANAGED AS REQUIRED TO MAINTAIN CONTROL DEVICES.
7. THE CONTRACTOR IS TO PROVIDE WATER TRUCKS AS REQUIRED TO MINIMISE OR
ELIMINATE THE DUST PROBLEMS CAUSED BY ONSITE TRAFFIC MOVEMENT.
8. THE CONTRACTORS VEHICLES & PLANT SHALL NOT OPERATE OUTSIDE THE LIMITS OF
THE IMMEDIATE CONSTRUCTION AREA AND ARE RESTRICTED FROM CROSSING OR
DISTURBING AREAS NOT SUBJECT TO CONSTRUCTION
9. ALL VEHICLES EXITING THE SITE SHALL BE CLEANED AND TREATED SO AS TO
PREVENT MATERIAL BEING TRACKED OR DEPOSITED ON PUBLIC ROADS.
10. ALL DISTURBED GROUND IS TO BE GRASS SEEDED TO PREVENT EROSION IF THE
DISTURBED GROUND IS TO BE LEFT “OPEN” FOR A PERIOD OF GREATER THEN ONE (1)
MONTH
SHAKE DOWN DEVICE 26 0 2 6 8 10
ad ws SCALE 1:200 (A1 SIZE}
Trent P: (07) 3369 8411. [Seams tr av Frome Draeha te
ALTUM CONSTRUCTIONS F: (07) 3369 1893, ESEsuOwy PROPOSED UNIT DEVELOPMENT |/EROSION AND SEDIMENT
Et [email protected]. au a eee
EORSUEING PRCINGERS | sammmeneceypemey L—@ [4 _|/AT CONTROL PLAN
EEO TICnNO Tanne: iiawinctocsmmemce, L&%.p Nov 2 [20 & 22 TRISTANIA DRIVE,
AO | FOR APPROVAL 28.1113 | HM 1 GreatG Str - a ee 2 MARCUS BEACH Drawing No Revision Code
CODE REVISION pate | BY ||CODE REVISION Pavoin - ° a “Quo 40 64 ©) c Z |weo__ il 40 13142/C02
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
13142-C02-A0-SignedRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.