human health and property in the event of a bushfire. Some currently degraded areas will also be

revegetated as part of the Noosa on Weyba         Environmental Impact Offsets Program and these

revegetated areas will also represent potentially hazardous vegetation from a bushfire perspective.
A detailed bushfire assessment and concept management plan has been          provided and is included
with Appendix 12.


4.4.4   Flooding

In October 2012 Cardno conducted a Flood Study Investigation for the proposed Noosa on Weyba

development. The overall conclusions of the Flood Study are detailed below:

The proposed Noosa on Weyba development has been shown through TUFLOW modelling to:
   .    have no adverse impacts on flood levels and flows for surrounding properties for local and

        regionalflood events;
   .    reduce the 100 year ARI event the peak flood level around Lake Entrance Boulevard due to

        flow attenuation being proposed within the site;
   .    provide 100 year ARI trafficability for all proposed and upgraded roads;
   .    provide PMF evacuation routes for all areas of the site; and
   .
        improve flood access for neighbouring properties.
The flood levels used to set the development levels for the site do include the potential impact of
climate change. The proposed filling within the site will reduce available flood storage, although

compared to the available storage in Lake Weyba and the surrounding floodplain the reduction is
minimal. Flood modelling has shown that the impact of the reduced flood storage is contained within
the site. Dense revegetation of the western drainage channel is considered to be achievable


The entirety of the Flood Study by Cardno has been included in Appendix 6.


4.4.5   Acid Sulfate Soils


The following is a summary of the conclusions and recommendations made by Cardno (Old)following
their June 2012 Geotechnical Investigations for the proposed development Noosa on Weyba.
However, the report in its entirety should be read for a full description of the conclusions and
recommendations (Appendix 4).
   .    The subsurface conditions at the site generally consisted of a layer of either loose sands or

        soft to firm clay underlain by stiff or better clays. Weathered rock was encountered in some
        of the boreholes.
   .    The site preparation work should generally be carried out in accordance with AS3798-2007
        ’Guidelines on Earthworks for Commercial and Residential         Developments’. A      indicative

        stripping depth of O.lm was obtained from the fieldwork results.
   .    Based on the existing natural soil profile, the site may be classified Class ’P’ in accordance
        with
   .    AS2870-2011 ’ResidentialSlabs and Footings’ due to soft/loose soils across the site.

   .    It is recommended that either high or deep level footings may be appropriate depending on

        the type of structure. Recommended bearing capacity parameters to allow the proportioning

        offootings, depending on the applied load, are included in Section 5.2.
   .    Effluent disposal characteristics are provided in Section 5.3.
   .    The relevant action criteria level has been exceeded and therefore indicates that a detailed
        acid sulfate management plan will be required. Once the nature and area of disturbance is

        finalised, the requirement for further sampling and testing can be determined and an acid
        sulphate management plan completed including liming rates needed to neutralise the
        disturbed material.



                                                                                                      16

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12_0208.pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.