Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12/0208

of 104

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (35.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

not the    proposed    variations to the local     planning   instrument identified   in the   development
application.

After deciding whether or not approve the proposed development, the assessment manager must
then make a decision about the proposed variations. The decision rules for deciding whether or not
to approve the proposed variations are set out in sections 327 to 329 of the SPA. The assessment

manager’s decision about the proposed variations must not conflict with any relevant state planning
instruments or the planning scheme, other than in limited circumstances, such as where there are
sufficient grounds to justify the decision despite the conflict.


An assessment of sections 327 to 329 of SPA have been undertaken within Section 7 of this report.
This assessment is provided to assist the assessment manager to determine whether there are
sufficient grounds to decide an application in a way which may conflict with a relevant instrument.


6.1.3     Other Approvals


The  following outlines the subsequent planning approvals that will be required to enable the
construction of the proposed development of the Urban Centre:

      .   Reconfiguration of a Lot application to Community Title Management Lots;
      .   Operational Works (Change to Ground Level) for the bulk earthworks and stormwater
          management;
      .   Operational Works (Tree Removal) to remove any trees necessary to construct the proposed
          development; and
      .   A series of Material Change of Use (MCU),Reconfiguration of a Lot (ROL)applications to be

          assessed against the proposed Noosa on Weyba Development Codes for the establishment
          of uses as identified in the proposed Noosa on Weyba Tables of Development.



6.2     REFERRAL AGENCICES

The   following table   outlines the     applicable   referrals in accordance with    Schedule 7     on   the
Sustainable Planning Regulations 2009.


                                     Trigger                                     Referral Agency
1       Works on or other development in or adjoining a fish            The Chief Executive (Fisheries)
        habitat area                                                    (Departmentof Agriculture,
        SPA Regulations, Sch. 7, Table 2, Item 27                       Fisheries and Forestry) Advice
                                                                                                 -




                                                                        Agency
2       Removal, destruction or damage of marine plants                 The Chief Executive (Fisheries)
        SPA Regulations, Sch. 7, Table 2, Item 32                       (Departmentof Agriculture,
                                                                        Fisheries and Forestry)  -




                                                                        Concurrence Agency
3       Development impacting on a State controlled road                The Chief Executive administering
        SPA Regulations, Sch. 7, Table 3, Item 2                        the Transport Infrastructure Act

                                                                        (Departmentof Transport and
                                                                        Main Roads) Concurrence
                                                                                      -




                                                                        Agency
4       Coastal management district                                     The Chief Executive under the
        SPA Regulations, Sch. 7, Table 3, Item 5                        Coastal Protection and

                                                                        Management Act (Department of
                                                                        Environment and Heritage

                                                                        Protection)   Concurrence Agency
                                                                                      -




5       Electricity infrastructure                                      The Chief Executive of the entity

                                                                                                           27

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12_0208.pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.