6.6.1.2 Relevant Codes
Earthworks Code
Attached within Appendix 3 Cardno have undertaken a detailed Engineering Assessment of the bulk
earthworks, road works, stormwater drainage and servicing for the proposed Noosa on Weyba
Preliminary Approval Development, with extensive consideration given to environmental protection.
The following conclusions were derived with regard to earthworks.
. Earthworks areas have been minimised to limit the impact on the existing vegetation
. Excavation is generally confined to existing road reserves, proposed roads and the
development footprint.
. Preliminary bulk earthworks modelling indicates that a balance cut to fill can be
achieved, which could potential reduce impact on the surrounding community and
Council roads;
In addition to ensuring compliance with Council’s Earthworks Code an assessment against the
Queensland Coastal Plan was required establish if earthworks could occur in areas outlined within
the Noosa on Weyba Locality Plan.
Further to meetings and correspondence provided to the Department of Environment and Heritage
protection it was accepted that the highest astronomical tide
(HAT) within Lake Weyba is
approximately O.23mAHD and that the use of this level of HAT can be supported, hence there is a nil
impact outcome from the proposed earthworks for the project.
Erosion & Sediment Control Code
Attached within Appendix 3 Cardno have undertaken a detailed Engineering Assessment of the bulk
earthworks, road works, stormwater drainage and servicing for the proposed Noosa on Weyba
Preliminary Approval Development, with extensive consideration given to environmental protection.
The report made the following conclusions in regard to the sites suitability for the proposed
development in regard to erosion and sediment control:
. The development footprint is generally located within the existing cleared areas and
therefore minimal additional clearing will be required.
. Due to the ecologically sensitive location of the site, appropriate stormwater quality
treatment is of the upmost importance. The proposed WSUD strategy for the site
includes community education, large rainwater tanks, bio-retention basins,
vegetated swales and litter baskets;
. The flood study indicates there are no adverse impacts on flood levels and flows for
surrounding properties for local and regional flood events. Flood attenuation is
proposed through controlled culverts and detention basins at various locations. All
development areas have sufficient flood immunity in accordance with SCRC
requirements;
. Earthworks areas have been minimised to limit the impact on the existing vegetation
. Excavation is generally confined to existing road reserves, proposed roads and the
development footprint.
. Preliminary bulk earthworks modelling indicates that a balance cut to fill can be
achieved, which could potential reduce impact on the surrounding community and
Council roads;
52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.