Council archive · source document
Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12/0208
Very large file (35.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
. Bio-retention basins.
. Bio-retention gardens within the road reserve.
. Bio-retention tree pits within the road reserve.
. Bio-retention swales.
. Vegetated swales.
. Litter baskets.
. Buffer areas.
. Revegetation and rehabilitation of Lake Weyba buffer area.
. Rehabilitation of Keyser Creek waterway corridor.
. Reticulated water and sewerage, which will minimise the risk of contaminants
from effluent being discharged into Lake Weyba.
(e)
Based upon the constraints mapping undertaken as part of the Noosa on Weyba Locality Plan it is
concluded that no reduction in size or loss of hydrological values of identified wetlands will occur. All
environmentally sensitive areas have been identified and environmental management strategies
established which will be administered through the body corporate structure to ensure no adverse
impacts will result.
(I)
The proposed Noosa on Weyba Preliminary Approval Development does not propose any loss of
marine or aquatic vegetation. No development activity will occur within Lake Weyba.
(g)
The proposed Noosa on Weyba Preliminary Approval Development will protect all threatened fauna
and flora species located within the site through the following proposed measures:
. Provision of multiple corridors of wildlife habitat to facilitate the movement of
native wildlife species within and through the Noosa on Weyba site.
. Provisions of buffers to Lake Weyba, Eenie Creek and Keyser Creek that would,
through a combination of their size and character, preserve the functional
ecological values of these wetland and waterway environments.
. Maintenance of appropriate building setbacks between future building sites and
adjacent areas of bush land vegetation located within or external to the Noosa
on Weyba site to ensure that the ecological values and functions of retained
areas of bushland are not compromised by bushfire hazard management
measures and concerns.
. A road network to service the Noosa on Weyba project that (a) minimises the
clearance of vegetation and fauna habitat; (b)maintains low vehicular speeds (<
SO kph) and enhanced driver awareness of surrounding fauna
. Awareness Roadside Signage which will add to drivers awareness of the
potential presence of fauna on local roads
(h)
As the proposed environmentally sensitive aspects of the site have been identified and proposed to
be managed through a body corporate structure, the ongoing maintenance and management of
these areas into the future is confirmed. It is considered that the base line data established as part of
the application will allow for suitable management strategies and recommendations to be
implemented to guide future development over the land.
62
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.