                  .    Rehabilitation of Keyser Creek waterway corridor.
                  .    Reticulated water and sewerage, which will minimise the risk of contaminants from

                       effluent being discharged into Lake Weyba.

The proposed development will maximise the use of alternative sources of water. The proposed
rainwater tanks will be able to provide around 82 percent of the non-potable water demand and
around 53percent of the total water demand of the site.


MUSIC modelling has shown that the water quality objectives and frequent flow objectives for the

site   can   be met. The reduction in      pollutant loads being achieved by the proposed stormwater
treatment train is significantly greater than the reduction typically provided by standard residential

developments. The resultant pollutant loads from developed areas of the site are less than those
resulting from the existing rural use of these areas. Other areas of the site will be converted from
rural uses to park areas and densely vegetated areas will become designated conservation areas, and
rehabilitated as required. Therefore the overall storm water quality being discharged from the site
will likely be improved, and there will not be an impact on the water quality of Lake Weyba.



Regular water quality monitoring will be used to ensure that stormwater being discharged from site
is of suitable quality.



(m)
The proposed Noosa on Weyba            Preliminary Development and its future use will not decrease the
water quality of Lake Weyba nor any other water catchment.



Included within Appendix 18 Gilbert & Sutherland Pty Ltd have established a proposed Integrated
Water Cycle Management Plan. The plan conclusions the following to ensure compliance with the

Water Sensitive Design Code.

       .   Three main factors taken into consideration: The high rainfall; Limited opportunities for open

           space irrigation due to soil, groundwater and space limitations; and Access to both the
           potable water supply network and the Noosaville STP.
       .   Sustainable supply through      rainfall harvesting, (but being problematic for the sustained
           irrigation or domestic re-use from the effluent streams)
       .
           Comprising rainwater harvesting, both to maximize the off-set of potable demands from the
           municipal supply network and to improve the quality of stormwater runoff
       .     The provisional clarification that the augmentation to the Noosaville STP might proceed on a
           schedule allowing for receipt of sewage from Noosa on Weyba, and the results of the soil and

           groundwater investigations all-but precluding sustained open space irrigation meant the
           focus of the IWCM investigations was primarily on the IWCM Option 4, comprising rainwater
           harvesting, both to maximize the off-set of potable demands from the municipal supply
           network and to improve the quality of storm water runoff.
       .   The analysis of the rainfall data available for the Tewantin RSL Park, Eumundi-Crescent Road
           and Noosaville sites indicated      mean   annual rainfall in the range from    1500mmja to
           1700mmja. A rainwater balance for a typically sized residence with a net contributing roof
           area   of 100m2, indicated substantial demand off-set potential for rain       tanks   of 10kL
           capacity, and this tank size was then selected for the assessment of the overall precinct scale
           demand off-set.
       .   It   was   determined from the precinct analyses that a 10kL rain tank configuration could

           supply approximately 96% of the standard residential household demands for toilet cisterns,
           garden irrigation and laundry use. This in turn represents approximately 25-30% of the total
           household demand, representing a significant sustained offset from the bulk water supply

           system serving the Noosa area.

                                                                                                       64

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12_0208.pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.