Acid sulfate soils overlay code
Overall outcomes
(2) The purpose of the Acid sulfate soils overlay code will be achieved through the following
overall outcomes:-
(a) development ensures that the release of acid and associated metal contaminants from ASS
does not have significant adverse effects on the natural environment, built environment,
infrastructure or human health.
Following a detailed geotechnical investigation undertaken by Carndo and included within Appendix
4, the following is a summary of the conclusions and recommendations in regard to the geotechnical
investigation for the proposed development Noosa on Weyba.
1. The subsurface conditions at the site generally consisted of a layer of either loose
sands or soft to firm clay underlain by stiff or better clays. Weathered rock was
encountered in some of the boreholes.
2. The site preparation work should generally be carried out in accordance with
AS3798-2007 ’Guidelines on Earthworks for Commercial and Residential
Developments’. A indicative stripping depth of O.lm was obtained from the
fieldwork results.
3. Based on profile, the site may be classified Class ’P’ in
the existing natural soil
accordance with AS2870-2011 ’Residential Slabs and Footings’ due to soft/loose soils
across the site.
4. It is recommended that either high or deep level footings may be appropriate
depending on the type of structure. Recommended bearing capacity parameters to
allow the proportioning of footings, depending on the applied load, are included in
Section 5.2.
5. Effluent disposal characteristics are provided in Section 5.3.
6. The relevant action criteria level has been exceeded and therefore indicates that a
detailed acid sulphate management plan will be required. Once the nature and area
of disturbance is finalised, the requirement for further sampling and testing can be
determined and an acid sulphate management plan completed including liming
rates needed to neutralise the disturbed material.
It would be anticipated that these recommendation would be conditioned as part of any Preliminary
Approval issued over the land.
89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.