Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2018-08-13 General Committee Agenda

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 28 of 48

Noosa Shire Council                                                                                               ATTACHMENT 3
        2018/19 Capital Budget Review 1
        For the period ending 30 June
         aa)                                                                          Grants External  Loans    Levy   Other    General     Total
                                                                                              Funds          1 aL)               EL)
        Capital Works                                                              re Sa)          CALI)                    $19,171,776 $25,866,592
       Bn
      Gooren OW Noosa Readeidge Renewal                                        «LS erm@mo TTS ear mee | ¥ Tsar
      Goorey Many River Road Bdge Renewal                                       |S   ama]                                          06 |S TT. 288
       Revea Heads Wie Oro Badge Rerew@ TTS OS
       Tewantn DeonetaBrageRenewal TTS R00 | ST,
       (Orealla Crescent Overpass Refurbishment SOSCSC~SOSOSOOOTTTCTCCCSNS~—~SSSSC~—~SSSTSC—~dSCS—~SS~*S 2 S18
        BidgesTotals—“—SsSsS™SSOSC“CsCsSsSSSSSCC“‘CS;™*SCCCBWAZT |                                                CdSSSCSCdCS «8,209,793 | $2,748,222
Cn
       FTewantin- Read Park Carpark Surfacing SOSC—~—SOSSSOOOCTCCCSYSSSS™~S~SSCS~Sd SSCS SSS*d                       (150,000 | $150,000
       CarParksTotl sC—“—s~s~s~s~SSSC“Cs*~‘“‘“‘“‘“‘(‘(‘;tsS 8 150,000) $                                                                 150,000
       Cemeteries —sSSC“Cs~‘“‘“‘“‘SSTCTCTCUCdrTTTTTrTTTCOSrT TS Td
       Pomona Cemetery TimberFenceRenewal               SOS™S~—SSSOTTTTTTCSdSS         = CSSSCidSSSC~dSSSS~id             «dS 2000 $27,000
       Cemeteries Total                                                                                                    $27,000) $27,000
       Coastal Canals andWatewaysS—“—~sSsSSSCSC“C~i‘*RSC“‘($SNSC‘SNNNN NNN ||
       PPeregian Beach Boardwalk Renewal North ofTowertoaccessSSCSC~—~sSCSC~sSCS|STSTCYSCSSC*dSCSCSSSC*dSS ‘940,000 § 140,000
       Noosavile Gympie Terrace Revetment Wall Renewal(O-Boats)—SCSC~—YSSCdYS Td SC*dCS«*dS 228028 |S 228,028
       Coastal CanalsandWaterways Total sisi‘“‘CS™SCS™*™*™*™*™~™~™~sSSTCé‘éS]CSCSY(‘C(NS’NSN:CLHNNNN’. ||                $868,024 $ 369,028
       Commercialland&Property s—“‘—~‘“‘“‘“‘“‘“‘;*™*™S™SSSCC*dCOC*C‘“(NOCOCdCCOCC(‘#NNNCOCdSCOT OUT
       Peregian DigitalHub-Fitout SS SSCS—C—CSCSCSC|SSSSC~SSSCSC~C~iYTSTSC~dYCSC*dSCSSC*diS «| S18
       Rufous Street Stage 3PlanningandDesign——OSC—OOCCCC | Sd                                                   i        | $100,000 | $100,000 |
       Commercial Land & Property Total                                                                                    $224,182 | $224,182
       CommunityFaciities —S—SSSSSC“CsSsSSSSCSYSSC NCCCSCOC‘C~sSYSSC“‘“(SSS*SNOC“(NS*“CNCNNNNSNNN CL
       Noosa Heads Demolition of Lifeguard Service/ SLSQ operations storage faciity SSS SSSdYSSSC*dTSSSSC~dYSCC~‘TSSC~C*~‘dCS~C~« STAYS AO
       Noosa Heads The JRenewal ofAVeystemYearsof3 SS          SSSC~“~S*~*S*SSSSYSSSCSCSC~*iSSC“‘(SCYWC..C ‘|_| 880,000 $                 30,000,
       [Sunshine Beach NAC - Replace Automated PoolCieaner SS SSSSC~—“—~sS*SsSSYSSSSCSC~iSC“‘(‘#S’C‘L.. |_|               | $15,000 $15,000,
       TewantinSES Termite Damage SSSCS~“—~—S~CSsSSSSTTCST~—~dSSCSC*dSCTSCdSSSSCSdSCSSSC*dS TTS                                             OTT
        NAC & NLC Roof Restoration (to Support SolarPanels)SSSCS~—SCSsYSSCdTSTCdYCSCdYSCSSCSCSC~*dSCSCSC*dCS S~«C72,SO'|'S 72,50 |
       Pomona Community House Airconditioning Renewal SSSSCSC~—“—~SCS*~S~~SCSSSSSCSSSCSC*dSSCSSSCdSSSTSSC*dSCSCSCSC*dSCSS «YS 80,000 $30,000,
       TTinbeerwah Main Hall Flooring Renewal SSSCSC~C~—CSYSCSdSCTCdYCTTTTCdCS*dY +S 80,000 | $50,000 |
       Pomona Kindergarten -RoofReplacement  SS                  SSSCSCS~—CSCSCSSCYSSCdCC*dYCSC*dSC «dS 80,000 $50,000 |
       [Sunshine Beach NAC -25m AMP PoolRenewalProgram           SSCSC~“~*~*~*~*s***sséiSCSCSCSC*SSSC‘“‘(C*LWNNCC#dOONC#dCOWC#CSS’ ~_=«C‘N4,O00 | $14,000.
       Sunshine Beach NAC-50m AMP PoolRenewal Program                      SSSC*dSTSCdCdYCSCdS CS                         C*dS 199,000 [$199,000 |
       [Sunshine Beach NAC -LTS AMP PoolRenewalProgram —SSCS~—CSCSYSSSSSSSCdSSCCdSCCSC~*dSCSCSCSC~*dSCSCS*~*dCSCSC«4,0D'| 14,000 |
       [Sunshine Beach NAC - Other AMP Infrastructure Renewal Program SSSSC~—~iSC*‘“‘“‘dRTSC#“C‘CN’W‘YNWWNWY..._ | |      | $906,000 | $ 306,000 |
       [Sunshine Beach NAC-RoofReplacement—SCSC~—“—~S*SsSYYSCCSSCdSCCCC*dSSC‘“CTCdSSC*dS SS 100,000 | $100,000"
                                                                                                                                   Page 28 of 48
Log in to download the original file

2018-08-13 General Committee Agenda(PDF, 7MB).pdf · 7.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.