Original source · versioned page text
Information Response
c. demonstrate that the runoff from the site is suitably controlled to ensure that the
downstream environment is not adversely affected or destabilised.
Please note that the stormwater drainage system must be a gravity system and pumps are
not acceptable.
Response: Please refer to the attached Stormwater Management Report prepared by Westera Partners.
We thank Council on behalf of the applicant for assessing the attached additional application material.
Based on the information provided in this application we respectfully request that Council proceed to
issue an approval.
Should you have any questions with respect to the above, please do not hesitate to contact me directly.
Yours faithfully,
Adapt Town Planning + Development Management
Tiani Boulton
Director
E: [email protected]
M: 0404 924 160
A: PO Box 7618 Sippy Downs QLD 455
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.