Council archive · source document
080620 BCR02_EcoAssess_20071109_Final_MT.pdf [As Published] · 132008.1128
column 1 column 2 column 3
Specific Outcomes Probable solutions (if code assessable) Development Outcomes
c) maintaining wildlife corridors along watercourses and OR
drainage lines for native fauna movement; S5.2 Where Detached house and located on an
d) avoiding edge effects and incompatible uses in riparian allotment situated wholly within the Riparian Buffer,
zones; the following minimum building setbacks measured
e) maintaining bank stability by minimising bank erosion and from mean high water mark are complied with-
slumping; a) if within the Coastal Protection Precinct as
f) maintaining water quality by filtering sediments, nutrients and identified on the Natural Resources Overlay Maps-in
other pollutants; and accordance with Schedule 1 Minimum Boundary
g) removing undesirable plant species and replacing them with Setbacks; or
vegetation of local origin; b) Otherwise-40m;
OR
AND S5.3 For Animal husbandry on premises in the
Rural Zone-
a) stock proof fencing is installed along
watercourses at a distance of no less than 10m
from the top of the bank;
b) stock watering points are located no less than
15m away from the top of the bank of
watercourses; and
c) stock crossing points across watercourses are
defined and controlled with stock proof fencing,
to prevent stock from damaging riparian vegetation
or banks to watercourses;
OR
S5.4 Recreational facilities (including playgrounds,
pergolas, barbeques etc) are setback a minimum of
30m from the top of the bank of a watercourse and
10m from the top of the bank of a drainage line;
OR
S5.5 and S6.1 For Forestry uses the cultivated area
is separated from watercourses and wetlands by a
distance not less than the distances identified
below, measured from high water mark or the top
of the bank, whichever is the greater distance, or
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080620 BCR02_EcoAssess_20071109_Final_MT.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.