Skip to the record
The gold standard in government transparency.

Council archive · source document

080620 BCR02_EcoAssess_20071109_Final_MT.pdf [As Published] · 132008.1128

of 114

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                          column 1                                                   column 2                                    column 3
                      Specific Outcomes                                Probable solutions (if code assessable)             Development Outcomes

c) maintaining wildlife corridors along watercourses and           OR
drainage lines for native fauna movement;                          S5.2 Where Detached house and located on an
d) avoiding edge effects and incompatible uses in riparian         allotment situated wholly within the Riparian Buffer,
zones;                                                             the following minimum building setbacks measured
e) maintaining bank stability by minimising bank erosion and       from mean high water mark are complied with-
slumping;                                                          a) if within the Coastal Protection Precinct as
f) maintaining water quality by filtering sediments, nutrients and identified on the Natural Resources Overlay Maps-in
other pollutants; and                                              accordance with Schedule 1 Minimum Boundary
g) removing undesirable plant species and replacing them with Setbacks; or
vegetation of local origin;                                        b) Otherwise-40m;
                                                                  OR
AND                                                               S5.3 For Animal husbandry on premises in the
                                                                  Rural Zone-
                                                                  a) stock proof fencing is installed along
                                                                  watercourses at a distance of no less than 10m
                                                                  from the top of the bank;
                                                                  b) stock watering points are located no less than
                                                                  15m away from the top of the bank of
                                                                  watercourses; and
                                                                  c) stock crossing points across watercourses are
                                                                  defined and controlled with stock proof fencing,
                                                                  to prevent stock from damaging riparian vegetation
                                                                  or banks to watercourses;
                                                                  OR
                                                                  S5.4 Recreational facilities (including playgrounds,
                                                                  pergolas, barbeques etc) are setback a minimum of
                                                                  30m from the top of the bank of a watercourse and
                                                                  10m from the top of the bank of a drainage line;
                                                                  OR
                                                                  S5.5 and S6.1 For Forestry uses the cultivated area
                                                                  is separated from watercourses and wetlands by a
                                                                  distance not less than the distances identified
                                                                  below, measured from high water mark or the top
                                                                  of the bank, whichever is the greater distance, or

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

080620 BCR02_EcoAssess_20071109_Final_MT.pdf [As Published].pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.