Appendix3-EngineeringReport · MCU18/0135
Attached to the e-mail Detached House (Report, Slope Stability, Proposal Plans, Landscaping, Engineering, DA Form) - MCU18/0135.
Table 6.3a -State Planning Policy Trigger Questions
SPP Trigger Response
MCU with Land Area >2500m² No
- That results in >25% Imp Area N/A
- That results in ≥6 Lots N/A
REC with Land Area >2500m² and >6 Lots No
OPW with Disturbed Area >2500m² No
The above Table 6.3a demonstrates that compliance with SPP water quality objectives is
not required for the proposed development.
A rainwater tank will be installed with harvested roof area runoff to be used as a source
of water for non-potable reuse (pool top up) and landscape irrigation. This will provide
some measure of pollutant load reduction of typical nutrients (Total Suspended Solids,
Nitrogen and Phosphorous) by promoting infiltration and biological uptake of stormwater
runoff. The total volume of stormwater runoff discharging to the existing Rapid Infiltration
Pit will also be reduced.
It is proposed to direct hardstand areas to landscaped areas for water quality buffering
and gross pollutant removal wherever possible prior to discharge at the existing Rapid
Infiltration Pit within the Marcus Dunes Court road reserve.
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix3-EngineeringReport.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.