1909-13367 SRA RA6-N Response with conditions

Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

RA6-N




SARA reference:        1909-13367 SRA
Council reference:     MCU19/0114 RAL19/0027
Applicant reference:   462

14 February 2020

Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin QLD 4565
[email protected]

Attention:       Mr Patrick Murphy

Dear Mr Murphy


SARA response—30-144 Myall Street, Cooroy
(Referral agency response given under section 56 of the Planning Act 2016)

The development application described below was confirmed as properly referred by the Department
of State Development, Manufacturing, Infrastructure and Planning on 30 September 2019.


Response
Outcome:                           Referral agency response – with conditions.
Date of response:                  14 February 2020
Conditions:                        The conditions in Attachment 1 must be attached to any
                                   development approval.
Advice:                            Advice to the applicant is in Attachment 2.
Reasons:                           The reasons for the referral agency response are in Attachment 3.


Development details
Description:                      Development permit          Material change of use for Multiple
                                                              housing – Type 5 (seniors living
                                                              community 232 independent living units)
                                                              and Entertainment and dining business
                                                              – Type 2 (Cooroy Golf Club house)
                                  Development permit          Reconfiguration of a lot (boundary
                                                              realignment and access easement)

SARA role:                        Referral Agency.
SARA trigger:                     Schedule 10, part 9, division 4, subdivision 1, table 1, item 1
                                  (Planning Regulation 2017)


                                                                       South East Queensland (North) regional office
                                                                       Mike Ahern Building, Level 3, 12 First Avenue,
                                                                       Maroochydore
Page 1 of 15                                                           PO Box 1129, Maroochydore QLD 4558
Log in to download the original file

1909-13367 SRA RA6-N Response with conditions.pdf · 440 KB (small file)

Full text of the other 14 pages

Page 2

                                                                                                    1909-13367 SRA




                                      Development application for a material change of use stated in
                                      schedule 20 of the Planning Regulation 2017

                                      Schedule 10, part 9, division 4, subdivision 2, table 1, item 1
                                      (Planning Regulation 2017)

                                      Development application for reconfiguring a lot within 25m of a
                                      state-controlled road

                                      Schedule 10, part 9, division 4, subdivision 1, table 1, item 1
                                      (Planning Regulation 2017)

                                      Development application for a material change of use within 25m of
                                      a state-controlled road and a railway
SARA reference:                       1909-13367 SRA
Assessment Manager:                   Noosa Shire Council
Street address:                       30-144 Myall Street, Cooroy
Real property description:            Lot 33 on MCH2281 and Lot 1-3 on SP115864
Applicant name:                       GTH Projects No. 4 Pty Ltd
Applicant contact details             c/- Innovative Planning Solutions, PO Box 1043, Maroochydore
                                      QLD 4558
State-controlled road                 This referral included an application for a road access location,
access permit:                        under section 62A(2) of Transport Infrastructure Act 1994.
                                      Below are the details of the decision:
                                       Approved.
                                       Reference: TMR19-028418.
                                       Date: 10 February 2020.

                                      If you are seeking further information on the road access permit,
                                      please contact the Department of Transport and Main Roads at
                                      [email protected]
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (section 30 of the Development
Assessment Rules). Copies of the relevant provisions are in Attachment 4.

A copy of this response has been sent to the applicant for their information.

For further information please contact Kieran Hanna, Principal Planning Officer, on 3432 2404 or via
email [email protected] who will be pleased to assist.

Yours sincerely




Garth Nolan
Manager (Planning)



Department of State Development, Manufacturing, Infrastructure and Planning                             Page 2 of 15

Page 3

                                                                                               1909-13367 SRA



enc      Attachment 1 - Referral agency conditions
         Attachment 2 - Advice to the applicant
         Attachment 3 - Reasons for referral agency response
         Attachment 4 - Representations provisions
         Attachment 5 - Approved plans and specifications

cc       GTH Projects No. 4 Pty Ltd c/- Innovative Planning Solutions, [email protected]




Department of State Development, Manufacturing, Infrastructure and Planning                      Page 3 of 15

Page 4

                                                                                                    1909-13367 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application). (Copies of the plans and specifications referenced below are found at
Attachment 5).


No.        Conditions                                                                 Condition timing
Development permit for a material change of use for Multiple housing – Type 5 (seniors
living community of 232 independent living units) and Entertainment and dining business –
Type 2 (Cooroy Golf Club house)
Schedule 10, part 9, division 4, subdivision 1, table 1, item 1 of the Planning Regulation 2017—
State transport infrastructure and schedule 10, part 9, division 4, subdivision 2, table 4, item 1 of
the Planning Regulation 2017—State-transport corridor —The chief executive administering the
Planning Act 2016 nominates the Director-General of the Department of Transport and Main Roads
to be the enforcement authority for the development to which this development approval relates for
the administration and enforcement of any matter relating to the following conditions:
Railway corridor
1.         The setback of the development from the railway corridor must be           Prior to the
           carried out generally in accordance with the following plans:              commencement of
                   Site Context Study, prepared by Jared Poole Design,               use and to be
                    dated 1 August 2019, drawing number DP1074/SK4.01,                maintained at all
                    revision A; and                                                   times
                   Preliminary Earthworks Plan, prepared by Westera
                    Partners, dated 16 August 2019, S19/007 P, revision A.
Stormwater and drainage
2.         (a) The development must be carried out generally in accordance            (a) At all times
               with the following:
                   Sections 3.1.2, 3.1.10, 4 and 5 of the Flood Study,
                                                                                      (b) Prior to the
                    prepared by Westera Partners, dated 11 December 2019,
                                                                                      commencement of
                    reference S19-007, revision 1; and
                                                                                      use
                   Sections 2.2 – 2.3, 3.4 – 3.6 and 6.3 Appendix AC –
                    Engineering Drawings of the Stormwater Management
                    Report, prepared by Westera Partners, dated 18
                    December 2019, reference S19-007, revision 1.


           (b) RPEQ certification with supporting documentation must be
               provided to North Coast District
               ([email protected]) within the Department of
               Transport and Main Roads, confirming that the development
               has been constructed in accordance with part (a) of this
               condition.
Pedestrian access to public passenger transport
3.         (a) Pedestrian crossing works across Myall Street and paved                (a) & (b) Prior to the
               pedestrian footpaths to each bus stop must be provided                 commencement of
               generally in accordance with the Functional Layout – Left &            use for Stage 1
               Right Turn Treatment, prepared by TTM Consulting Pty Ltd,
               dated 28 November 2019, drawing number 19BRT0357-05,
               revision A.


           (b) The pedestrian footpath must be designed and constructed in
               accordance with the Department of Transport and Main
               Roads' Road Planning and Design Manual and Road Safety



Department of State Development, Manufacturing, Infrastructure and Planning                              Page 4 of 15

Page 5

                                                                                                1909-13367 SRA




No.        Conditions                                                            Condition timing
                Policy.
4.         The internal pedestrian network (verges) and pedestrian pathway       Prior to the
           connection to Myall Street must be provided generally in              commencement of
           accordance with the Master Plan, prepared by Jared Poole              use for the relevant
           Design, dated 3 December 2019, drawing number                         stage, and to be
           BP1074/SK2.01, issue R; as amended in red.                            maintained at all
                                                                                 times
Public passenger transport
5.         (a) The applicant must provide a pair of bus stops on Myall           (a) - (c) Prior to the
               Street at the locations shown on the Functional Layout –          commencement of
               Left & Right Turn Treatment, prepared by TTM Consulting           use for Stage 1
               Pty Ltd, dated 28 November 2019, drawing number
               19BRT0357-05, revision A.


           (b) Each bus stop must be in accordance with the Disability
               Standards for Accessible Public Transport 2002 made
               under subsection 31(1) of the Disability Discrimination Act
               1992 and include the following components in accordance
               with the Department of Transport and Main Roads’
               TransLink Public Transport Infrastructure Manual 2015:
                   (i) all mandatory bus stop components for an
                         ‘Intermediate Stop’ detailed in Section 5.7 - ‘Bus
                         stop components’ (pages 30-41) of Chapter 5 -
                         ‘Bus stop infrastructure’;
                   (ii) a J-pole sign with timetable case in accordance
                         with Figure 5.11 – ‘Bus stop identification markers’
                         (page 50) and Table 5.9 - ‘Stop signage/stop
                         marker’ (page 35) of Chapter 5 - ‘Bus stop
                         infrastructure’, and Sign Type IS-10b ‘Bus Stop – J
                         Pole Sign (TransLink)’ (sections 4.26.1 – 4.27,
                         page 63-65) of the Signage Manual – Bus Network
                         Infrastructure, TransLink Division, Department of
                         Transport and Main Roads, December 2016;
                   (iii) a disability compliant shelter and seat must be
                         provided in accordance with Noosa Council
                         requirements and Table 5.9 – ‘TransLink
                         requirements for bus stop components – bus stop
                         furniture – shelters and seating’ (page 38) of
                         Chapter 5 – ‘Bus Stop Infrastructure’;
                   (iv) an indented bus zone to accommodate the set
                         down of a single unit rigid bus of 12.5m in length in
                         accordance with Section 5.6.3.1 – ‘Bus stop length
                         requirements’, ‘Table 5.7: Minimum bus stop
                         length requirements’ (pages 28-29) of Chapter 5 –
                         ‘Bus stop infrastructure’ and Table 5-4: ‘Bus stop
                         arrangements’ (bus bay width a minimum of 3m
                         excluding cycle lanes and tapers for the speed
                         environment) of Chapter 5 – ‘Bus stop
                         infrastructure’; and
                   (v) hardstand and access in accordance with DRG5 –
                         0022 – ‘Intermediate Stop – Site Layout – With
                         Indented Bus Bay’.


           (c) RPEQ certification must be provided to the North Coast


Department of State Development, Manufacturing, Infrastructure and Planning                        Page 5 of 15

Page 6

                                                                                              1909-13367 SRA




No.        Conditions                                                          Condition timing
                Region ([email protected]) within the
                Department of Transport and Main Roads confirming that the
                development has been constructed in accordance with parts
                (a) and (b) of this condition.
6.         Roadworks to Myall Street must be designed and constructed to       Prior to the
           be in accordance with the following to accommodate a single unit    commencement of
           rigid bus of 12.5m in length:                                       use for Stage 1

                   Department of Transport and Main Roads Road Planning
                    and Design Manual, 2nd Edition, Volume 3 – Guide to
                    Road Design (March 2016);
                   Department of Transport and Main Roads Supplement to
                    Austroads Guide to Road Design (Parts 3, 4-4C and 6);
                   Austroads Guide to Road Design (Parts 3, 4-4C and 6);
                   Austroads Design Vehicles and Turning Path Templates;
                   Department of Transport and Main Roads Queensland
                    Manual of Uniform Traffic Control Devices, Part 13 Local
                    Area Traffic Management (March 2018); and
                   Chapter 2 - Planning and Design, Section 2.3.2 Bus
                    Route Infrastructure (page 6) of the Department of
                    Transport and Main Roads Public Transport Infrastructure
                    Manual 2015.
7.         Roadworks to Myall Street must be designed and constructed in       Prior to the
           accordance with the following to accommodate cyclists:              commencement of
                                                                               use for Stage 1
                   Department of Transport and Main Roads Road Planning
                    and Design Manual.
                   Department of Transport and Main Roads Cycle
                    Infrastructure Policy.
Vehicular access to state-controlled road
8.         (a) The road access locations are to be located generally in        (a) At all times
               accordance with Master Plan, prepared by Jared Poole
               Design, dated 3 December 2010, reference BP1074/SK2.01,
               issue R; as amended in red                                      (b) - (d) Prior to the
                                                                               commencement of
                                                                               use and to be
           (b) Road access works comprising the Main Access must be
               provided generally in accordance with:                          maintained at all
                                                                               times
                    (i) Institute of Public Works Engineering Australasia
                         (IPWEA) Standard Drawing RS-051 Rev H, General
                         Wide Flared, Driveways Heavy Duty Vehicle
                         Crossing; and
                    (ii) Channelised Right Turn and Auxiliary Left Turn
                         Treatment (CHR and AUL) turn treatments from Myall
                         St into Lot 2 on SP115864;
               at the road access location.


           (c) Road access work comprising the Emergency Access must
               be provided Generally in accordance with Institute of Public
               Works Engineering Australasia (IPWEA) Standard Drawing
               RS-056 Rev F, Driveways Rural Driveway, at the road access
               location.




Department of State Development, Manufacturing, Infrastructure and Planning                       Page 6 of 15

Page 7

                                                                                                  1909-13367 SRA




No.        Conditions                                                              Condition timing
           (d) The road access works must be designed and constructed in
               accordance with the Department of Transport and Main
               Roads' Road Planning and Design Manual.
9.         The emergency access is for use by emergency vehicles only as           At all times
           defined by Transport Operations (Road Use Management – Road
           Rules) Regulation 2009 and must be gated and remain locked at
           all other times.
10.        (a) All redundant existing vehicular property access located            Prior to the
               between the proposed development and Cooroy Connection              commencement of
               Road must be permanently closed and removed.                        use

           (b) The verge, including, but not limited to, local government
               footpath, between the pavement edge and the property
               boundary must be reinstated in accordance with the
               Department of Transport and Main Roads' Road Planning and
               Design Manual, standard drawings and specifications at no
               cost to the Department of Transport and Main Roads'.
Managing noise impacts
11.        (a) Noise attenuation measures to achieve the following noise           (a) - (c) Prior to the
               criteria must be provided:                                          commencement of
                    (i) A noise barrier to meet the following external noise       use and to be
                        criteria for the state-controlled road:                    maintained at all
                        For all facades of accommodation activities:               times
                             ≤60 dB(A) L10 (18 hour) façade corrected
                              (measured L90 (8 hour) free field between 10pm
                              and 6am ≤40 dB(A)).
                            ≤63 dB(A) L10 (18 hour) façade corrected
                             (measured L90 (8 hour) free field between 10pm
                             and 6am >40 dB(A)).
                         For all outdoor spaces for passive recreation (private,
                         communal and public):
                             ≤57 dB(A) L10 (18 hour) free field (measured L90
                              (18 hour) free field between 6am and 12 midnight
                              ≤45 dB(A)).
                             ≤60 dB(A) L10 (18 hour) free field (measured L90
                              (18 hour) free field between 6am and 12 midnight
                              >45 dB(A)).


           (b) The noise barrier required in part (a) of this condition, must be
               designed and constructed in accordance with:
                        Department of Transport and Main Roads' Road
                         Traffic Noise Management Code of Practice Chapter
                         7 integrated noise barrier design, Specifications
                         MRS15 and MRTS15; and
                        Standard Drawings Road Manual, Part 13.


           (c) RPEQ certification with supporting documentation, including a
               revised Acoustic Report, must be provided to the North Coast
               District ([email protected]), within the
               Department of Transport and Main Roads, confirming that the


Department of State Development, Manufacturing, Infrastructure and Planning                          Page 7 of 15

Page 8

                                                                                             1909-13367 SRA




No.        Conditions                                                          Condition timing
               development has been designed in accordance with parts (a)
               and (b) of this condition.
Filling and excavation
12.        (a) Any excavation, filling/backfilling/compaction, retaining       (a) At all times
               structures, stormwater management measures, services,
               batters and other works involving ground disturbance must not
               encroach or de-stabilise the state-controlled road.             (b) Prior to the
                                                                               commencement of
                                                                               use
           (b) RPEQ certification with supporting documentation must be
               provided to North Coast District at
               ([email protected]) within the Department of
               Transport and Main Roads', confirming that the development
               has been constructed in accordance with part (a) of this
               condition.
Development permit for reconfiguring a lot (boundary realignment and access easement)
Schedule 10, part 9, division 4, subdivision 2, table 1, item 1 of the Planning Regulation 2017—
State transport corridor—The chief executive administering the Planning Act 2016 nominates the
Director-General of the Department of Transport and Main Roads to be the enforcement authority
for the development to which this development approval relates for the administration and
enforcement of any matter relating to the following conditions:
13.        (a) The road access locations are to be located generally in        (a) At all times
               accordance with Proposed Reconfiguration Lots 1, 2 & 3
               SP1159864, prepared by DSQ Land Surveyors, dated 7
               August 2019, reference 13422-PRO-01, revision C.                (b) – (c) Prior to
                                                                               submitting the Plan of
                                                                               Survey to the local
           (b) Road access works comprising the Main Access must be
               provided generally in accordance with:                          government for
                                                                               approval and to be
                    (i) Institute of Public Works Engineering Australasia
                         (IPWEA) Standard Drawing RS-051 Rev H, General        maintained at all
                         Wide Flared, Driveways Heavy Duty Vehicle             times
                         Crossing; and
                    (ii) Channelised Right Turn and Auxiliary Left Turn
                         Treatment (CHR and AUL) turn treatments from Myall
                         St into Lot 2 on SP115864;
               at the road access location.


           (c) The road access works must be designed and constructed in
               accordance with the Department of Transport and Main
               Roads' Road Planning and Design Manual.
14.        (a) Any redundant existing vehicular property access located        (a) & (b) Prior to
               between the proposed development and Myall Street/Cooroy        submitting the Plan of
               Connection Road must be permanently closed and removed.         Survey to the local
                                                                               government for
           (b) The verge, including, but not limited to, local government      approval
               footpath, between the pavement edge and the property
               boundary, must be reinstated in accordance with the
               Department of Transport and Main Roads' Road Planning and
               Design Manual, standard drawings and specifications at no
               cost to the Department of Transport and Main Roads.



Department of State Development, Manufacturing, Infrastructure and Planning                       Page 8 of 15

Page 9

                                                                              1909-13367 SRA




Department of State Development, Manufacturing, Infrastructure and Planning     Page 9 of 15

Page 10

                                                                                               1909-13367 SRA




Attachment 2—Advice to the applicant

General advice
1.        Terms and phrases used in this document are defined in the Planning Act 2016, its
          regulation or the State Development Assessment Provisions v2.5 (SDAP). If a word
          remains undefined it has its ordinary meaning.
2.        Transport noise corridor: Mandatory Part (MP) 4.4 of the Queensland Development
          Code (QDC) commenced on 1 September 2010 and applies to building work for the
          construction or renovation of a residential building in a designated transport noise
          corridor. MP4.4 seeks to ensure that the habitable rooms of Class 1, 2, 3 and 4 buildings
          located in a transport noise corridor are designed and constructed to reduce transport
          noise. Transport noise corridor means land designated under Chapter 8B of the Building
          Act 1975 as a transport noise corridor. A free online search tool can be used to find out
          whether a property is located in a designated transport noise corridor. This tool is
          available online at:
          https://spp.dsdip.esriaustraliaonline.com.au/geoviewer/map/planmaking This tool allows
          searches on a registered lot number and/or property address to determine whether and
          how the QDC applies to the land.
3.        Landscaping: Any proposed landscaping, including establishment and full maturity, must
          not compromise safety on the state-controlled road. The applicant is advised that all non-
          frangible plant species are to be located outside of the clear zone on the state-controlled
          road and must be appropriately setback from any overhead electrical and lighting
          infrastructure. The provision of landscaping within the state-controlled road reserve requires
          an approval under section 33 of the Transport Infrastructure Act 1994 and must be in
          accordance with the requirements of the Department of Transport and Main Roads’ Road
          Planning and Design Manual and the Road Landscape Manual.
4.        Advertising Devices: Advertising devices have the potential to cause unsafe distraction,
          glare or other nuisance to drivers, which affects safety on the sate-controlled road. Any
          proposed advertising devices are to be in accordance with the Department of Transport and
          Main Roads’ Roadside Advertising Manual 2017. Any advertising device at this location:
               Must not exceed a maximum luminance of 300cd/m2.
               Must be placed within the subject site, clear of the state-controlled road reserve
                   (without overhang).
               Must not contain a variable message component.

          Further information on the Department of Transport and Main Roads’ Roadside
          Advertising Manual 2017 can be found at the following link:
          https://www.tmr.qld.gov.au/business-industry/Technical-standards-
          publications/Roadside-advertising-manual.
5.        Design of urban bus stops: The detailed design of the proposed bus stops should be
          submitted to the Department of Transport and Main Roads' TransLink Division for
          endorsement prior to construction or any works commencing. Please contact the TransLink
          Division on telephone number 07 3851 8700 or at [email protected] Department of Transport and Main Roads, TransLink Public Transport Infrastructure
          Manual May (PTIM) 2015 and Signage Manual Bus Network Transport Infrastructure
          December 2016 are available at: http://translink.com.au/about-translink/what-we-
          do/public-transport-planning.




Department of State Development, Manufacturing, Infrastructure and Planning                     Page 10 of 15

Page 11

                                                                                                 1909-13367 SRA




6.        Bus route interference: The existing urban bus route 631 extending along Myall Street
          must be able to function during the construction of the development and any associated
          roadworks. Accordingly, if any temporary arrangements are required, the applicant must
          reach agreement on suitable arrangements with the Department of Transport and Mains’
          TransLink Division ([email protected]) prior to any construction or
          works commencing.
7.        Road works approval: Under section 33 of the Transport Infrastructure Act 1994, written
          approval is required from the Department of Transport and Main Roads to carry out road
          works on a state-controlled road. Please contact the Department of Transport and Main
          Roads’ on [email protected] to make an application for road works
          approval. This approval must be obtained prior to commencing any works on the state-
          controlled road reserve. The approval process may require the approval of engineering
          designs of the proposed works, certified by a Registered Professional Engineer of
          Queensland (RPEQ). Please contact the Department of Transport and Main Roads’ as soon
          as possible to ensure that gaining approval does not delay construction.
8.        Public utility works and connection approval: The applicant is advised that if any
          works and/or connections are required to public utility services within a State-controlled
          road reserve, approval must be given by the Department of Transport and Main Roads
          under the relevant public utility legislation (electricity, water/sewer, telecommunication),
          and in accordance with TMR technical standards (TN163). Approvals must be obtained
          prior to commencing any utility works within the state-controlled road reserve. Please
          contact the public utility team via [email protected] for further information on
          the application and approval process.
9.        Ancillary works and encroachments: In accordance with section 50(2) and schedule 6 of
          the Transport Infrastructure Act 1994 (TIA) and part 5 and schedule 1 of the Transport
          Infrastructure (State-Controlled Roads) Regulation 2006, written approval is required to
          carry out ancillary works and encroachments on a state-controlled road. These development
          conditions do not constitute such an approval. You will need to contact the Department of
          Transport and Main Roads on 5451 7055 or at [email protected] to make
          an application for a Road Corridor Permit under section 50(2) of the TIA to carry out
          ancillary works and encroachments. Ancillary works and encroachments include but are not
          limited to advertising signs or other advertising devices, paths or bikeways,
          buildings/shelters, vegetation clearing, landscaping and planting.

          Further information is available online at:
          www.tmr.qld.gov.au/Community-and-environment/Planning-and-development/Other-
          matters-requiring-approval/Road-Corridor-Permit.aspx
10.       Compliance: The Department of Transport and Main Roads has been nominated by the
          Chief Executive of the Department of State Development, Manufacturing, Infrastructure and
          Planning as the entity responsible for the administration and enforcement of concurrence
          agency conditions within Department of Transport and Main Roads’ area of interest.

          The development must obtain a letter from Department of Transport and Main Roads
          detailing satisfaction of compliance prior to the commencement of use and / or sealing of
          survey plan. An application for compliance assessment can be made to Department of
          Transport and Main Roads via [email protected] (please quote TMR19-
          028418).




Department of State Development, Manufacturing, Infrastructure and Planning                        Page 11 of 15

Page 12

                                                                                            1909-13367 SRA




11.       Noise Compliance: To ensure compliance with Condition 11, you should provide RPEQ
          certification with detailed noise barrier design for review and endorsement (prior to noise
          barrier construction) to ensure that the development has been designed and constructed in
          accordance with part (a) of the condition and the Department of Transport and Main Roads’
          Transport Noise Management Code of Practice and technical standards MRS15 and
          MRTS15.

          The review and endorsement of the noise barrier design, will ensure that the noise
          barrier complies with the requirements of conditions and the Department of Transport
          and Main Roads’ Road Traffic Noise Management Code of Practice and Technical
          Standards MRS15 and MRTS15.




Department of State Development, Manufacturing, Infrastructure and Planning                   Page 12 of 15

Page 13

                                                                                              1909-13367 SRA




Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

The reasons for the department’s decision are:
 The proposal does not create a safety hazard for users of a state-controlled road if conditioned to
   ensure the development occurs in accordance with the site plan and stormwater management
   reports and road access works are constructed in accordance with Department of Transport and
   Main Roads standards.
 The proposal does not compromise the structural integrity of state-controlled roads, road transport
   infrastructure or road works if conditioned to ensure the impacts of filling and excavation works
   and stormwater events are minimised and managed.
 The proposal does not result in a worsening of the physical condition or operating performance of
   state-controlled roads and the surrounding road network if conditioned to ensure the impacts of
   filling and excavation works and stormwater events are minimised and managed and site access
   occurs in accordance with the site plan and Department of Transport and Main Roads standards.
 The proposal does not compromise the state’s ability to construct, or significantly increase the cost
   to construct state-controlled roads and future state-controlled roads.
 The proposal does not compromise the state’s ability to maintain and operate state-controlled
   roads, or significantly increase the cost to maintain and operate state-controlled roads.
 The proposal does not create a safety hazard for users of a railway; does not compromise the
   structural integrity of railways; does not result in a worsening of the physical condition or operating
   performance of railways; does not compromise the state’s ability to construct, or significantly
   increase the cost to construct railways; and does not compromise the state’s ability to maintain
   and operate railways, or significantly increase the cost to maintain and operate railways if
   conditioned to ensure the development footprint and filling and excavation works occurs in
   accordance with the site plans and stormwater events are minimised and managed.
 The proposal maintains the operational performance of the transport network and provides public
   passenger transport infrastructure to enable development to be serviced by public passenger
   transport and provides safe and direct access to public passenger transport infrastructure,
   including access by cycling and walking.
 With conditions, the proposal complies with the purpose and outcomes of State code 1:
   Development in a state-controlled road environment, State code 2: Development in a railway
   environment and State code 6: Protection of state transport networks of the State Development
   Assessment Provisions.

Material used in the assessment of the application:
 The development application material and submitted plans.
 Planning Act 2016.
 Planning Regulation 2017.
 The State Development Assessment Provisions (version 2.5), as published by the department.
 The Development Assessment Rules.




Department of State Development, Manufacturing, Infrastructure and Planning                     Page 13 of 15

Page 14

                                                                              1909-13367 SRA




Attachment 4—Change representation provisions
(page left intentionally blank)




Department of State Development, Manufacturing, Infrastructure and Planning    Page 14 of 15

Page 15

                                                                              1909-13367 SRA




Attachment 5—Approved plans and specifications
(page left intentionally blank)




Department of State Development, Manufacturing, Infrastructure and Planning    Page 15 of 15

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.