Skip to the record
Search everything, all in one place.

Original source · versioned page text

Plans for Minor change approval

of 81

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (71.9 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                  BHA Report for17-19 Hofmann Drive, Noosaville




       Site Access and Egress

       The intent of design requirements for roads is to provide safe egress for residents and access for attending firefighting vehicles.
       A road system that is compliant with guideline measures provides fire services with easier access to buildings, a safe retreat for
       firefighters and residents, and can provide a fire control line where hazard reduction and back burning can take place. In
       determining safe access to a site, consideration is given to the fire brigade vehicles which are required to access public and
       private roads. Given the size of these vehicles and the poor visibility in which they often operate, roads need to be designed to
       specific requirements, including road width, grade, cross-fall, weight capacity, passing bays and turnaround areas, all of which
       may vary depending on whether it is a perimeter, access, cul-de-sac or battle-axe road type. Suitable safe access and egress for
       residents and emergency services will be provided via Hoffman Drive.



       Fencing

       Fencing materials have the capacity to contribute to fire spread and intensity. It is recommended that non-combustible fencing
       materials should be used if required.



       Water Supply

       Providing a sufficient water supply provides firefighters and residents with the appropriate levels of water to undertake
       building defense. There are two options in which a house site can be supplied with a sufficient water supply; from either
       reticulated water accessible via a hydrant, or a dedicated static water supply. Reticulated water will be supplied to the
       development meeting the required statutory standards. Reticulated water will be provided to site to meet statutory
       requirements.




       + Bushfire assessments
       + Property vegetation assessments
       + Site planning for bushfire
       + Property management for bushfire                                                 Bushfire Planning Specalists - qldbushfireplanning.com.au
Document Set ID: 21969697
       + Bushfire management plans
Version: 1, Version Date: 20/06/2022
Log in to download the original file

Plans for Minor change approval.pdf · 71.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.