Original source · versioned page text
Plans for Minor change approval
Plans and drawings: the text below has words only, no drawings.
Very large file (71.9 MB): may take a few minutes to open.
BHA Report for17-19 Hofmann Drive, Noosaville
Performance Outcomes Acceptable Outcomes Compliance
PO3 AO3.1 Reticulated water provided to meet
Development provides an adequate Premises are connected to the statutory requirements.
water supply for fire fighting purpose reticulated water supply.
which is reliable, safely located and OR
freely accessible. AO3.2
Where there is no available reticulated
water supply, the premises has:
1. an accessible dam, swimming
pool or water tank available for
fire fighting purposes with an
onsite water volume of not less
than 5,000 litres; and
2. a water supply outlet pipe 50
millimetres in diameter fitted
with a standard fire brigade
fitting connected to the water
supply (other than where the
water supply is in a swimming
pool or dam).
PO4 AO4.1 N/A
Essential community infrastructure is Development involving essential
able to function effectively during and community infrastructure is not located
immediately after bushfire events. within a medium or high bushfire
hazard area.
OR
AO4.2
Where located in a medium or high
bushfire hazard area, development
involving essential community
infrastructure is designed to function
effectively during and after a bushfire
event in accordance with a Bushfire
Hazard Management Plan.
+ Bushfire assessments
+ Property vegetation assessments
+ Site planning for bushfire
+ Property management for bushfire Bushfire Planning Specalists - qldbushfireplanning.com.au
Document Set ID: 21969697
+ Bushfire management plans
Version: 1, Version Date: 20/06/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.