Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17

Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

CONSULT AUSTRALIA



   Member Firm


[OCR of page images]
CAD FILE->N\8500dr\853I\ACAD\PLANNING\853)-E.dwg

PLOT DATE-> 28 Jun, 2017-2:34pm

 

START OF CONSTRUCTION CH 0.000

IP CH.5.634 RL.21.123

=I
A

A

 

 

IP CH.25.908 RL.17.831

   

DESIGN SURFACE

      

EXISTING SURFACE

IP CH.62.534 RL.17.350

IP CH.86.784 RL.15.850

END OF CONSTRUCTION CH 99.588

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

3.0m
DRIVEWAY
CONSTRUCTION DETAIL ens aN
VE 3.000m VC 10.000m VC10.000m VE 10,000m
VERT. CURVE DETAILS rin ean inte rise
GRADING DETAILS -3,000;-16.237% -133% (6.186%) _-13,411%
DATUM R.L.3.000
CUT DEPTH (-ve) °
FILL DEPTH (+ve) =| S(S\S\B\S|S|_ 2/E/8| S/Z/8|5
LIP LEVELS RHS $) RiSlels/3\5| 8/8/8] Sais
LIP LEVELS LHS 8) Bale 8/se|  S/5]8] R/R|2/ 8
DESIGN SURFACE sg} slglgisjs/3|sisis} sale|s
NATURAL SURFACE a} seissjg/s) B/S/2] g
PEGGED CHAINAGE g| ala/S/s/S/2) B/E/R| 8|8|8| 8
=| SFisislals| sisis| alslsl#
CONTROL LINE DETAILS ima : wet aati

 

 

 

 

 

 

 

 

LONGITUDINAL SECTION

2 3 4 Sm 1:100 VERTICAL (A1)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

SCALES
0 10 20 30 40 50m 1:1000 HORIZONTAL (A1)

SURVEYOR CLIENT PROJECT: ; DRAWING NOMBER:
© conrncit Sones As sw Sasa PLANNING
THE FORMATION CONTAINED IV : Pr
ee rane KENLYNN PTY LID 2 DAVID LOW WAY, cc, | concurs austeauin PARTNERS 8531-E
CoPyiNG oF THs DOCUMENT

I: FULL SIZE A1

WaITTENPexetsion OF SHEEHY CASTAWAYS BEACH DRAWN _S® vw” STRUCTURAL AND GME DRIVEWAY LONGITUDINAL SECTION
‘Socernent canto CHECKED. Firm ; mae [TT ITI
INFRINGEMENT OF COPYIGHT AMENDMENTS DATE TNTIALS| DATE: JUNE "17 A.C.N.0OS 899 905 No. OF DRAWINGS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17.pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.