Planning Report
significant number of sites needing to be upgraded to provide the capacity to meet this demand. This
capacity is provided by increasing the number of antennas which are installed on the facilities. As shown on
the proposed elevation plans for the facility it is proposed to install three (3) antennas initially, with
reservation being made for a further nine (9)antennas if/when required. It is not practically possible to install
more than six (6) antennas using a turret mount and therefore a headframe is required to ensure future
capacity needs are met.
It is noted that Telstra has an exemption from obtaining planning content for the upgrades to their facilities
under the Telecommunications Act 1997 (Cwth). However Telstra wish to be transparent with Council
regarding their potential future expansion plans and therefore have provided details of the potential scale of
the ultimate facility, showing all potential upgrades.
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 , Planning report/Plans MCU12/0036Related documentApplication case desk ↗
About this file
- File size
- 28.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.