Original source · versioned page text
DA Form 1.pdf
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
☐ Subdivision (complete 10) ☐ Dividing land into parts by agreement (complete 11)
☐ Boundary realignment (complete 12) ☐ Creating or changing an easement giving access to a lot
from a constructed road (complete 13)
10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those lots:
Intended use of lots created Residential Commercial Industrial Other, please specify:
Number of lots created
10.2) Will the subdivision be staged?
☐ Yes – provide additional details below
☐ No
How many stages will the works include?
What stage(s) will this development application
apply to?
11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
parts?
Intended use of parts created Residential Commercial Industrial Other, please specify:
Number of parts created
12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot
2
Lot on plan description Area (m ) Lot on plan description Area (m2)
12.2) What is the reason for the boundary realignment?
13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)
Existing or Width (m) Length (m) Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?
☐ Road work ☐ Stormwater ☐ Water infrastructure
☐ Drainage work ☐ Earthworks ☐ Sewage infrastructure
☐ Landscaping ☐ Signage ☐ Clearing vegetation
Page 5
DA Form 1 – Development application details
Version 1.6— 2 August 2024
[OCR of page images]
Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?
U1 Road work U1 Stormwater UO Water infrastructure
UO Drainage work UO Earthworks UO Sewage infrastructure
U1 Landscaping UO Signage U1 Clearing vegetation
Page 5
DA Form 1 — Development application details
Version 1.6— 2 August 2024
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (DA Form 1.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.