Skip to the record
For the highest quality transcripts.

Council archive · source document

PC19-1405_ICN.N1512_9 Dwyer St SUNSHINE BEACH · PC19/1405

of 7

Text shows just the words. Original shows the document exactly as it was published.

INFRASTRUCTURE CHARGE CALCULATION DETAILS:
The infrastructure charge is calculated in accordance with Council’s Infrastructure Charges Resolution incorporating the charge apportionment (break-up) agreement with Unitywater in
compliance with the planning legislation and regulations applying at the time of issuing the notice.

                                                       NOOSA SHIRE COUNCIL CHARGES RESOLUTION (No.4) 2019 (Effective 23 September 2019)
                                                                                                                                                                                                                         1/07/2019
                                                                                                                                                                                                                       Calculation at
                                                                                                                                                                                                   IC Resolution
INFRASTRUCTURE CHARGE CALCULATION                                                                                                                                   PC19/1405                                       Planning Regulation
                                                                                                                                                                                                    Base Date =
                                                                                                                                                                                                                         2019-2020
                                                                                                                                                                                                                       Financial Year
                                                                                                                               Colum n 6
                       Colum n 1
                Use under The Noosa Plan
                                                                                                                                COUNCIL                                Council Charge Calculation
                                                                                                                                CHARGE
                                                    Colum n 2                       Colum n 3
                                                                                                                              Per Table 10.1                                  EXISTING                  NET
                                                Developm ent class               Unit of m easure                                                       APPROVED                                                    CHARGE AMOUNT
                                                                                                                      (Charges breakup) of Adopted
                         Defined use                                                                                                                                             (QTY)            CHARGEABLE
                                                                                                                           Charge in Column 4              (QTY)                                                             $
                                                                                                                         ($ per unit of measure)                                (Credit)               (QTY)
                                                                                          Lot
Residential - Reconfiguration of a Lot              Residential                                                               $17,603.73                                            1.0                   -1                  -$17,603.73
                                                                       (equivalent to 3 or more bedroom dwelling)

• Detached house                                                           3 or more bedroom dw elling                        $17,603.73                                                                  0                          $0.00
• Community Residence
• Ancillary dw elling unit
                                                                                2 bedroom dw elling                           $12,574.08                      1                                           1                      $12,574.08
&
                                                    Residential
Multiple housing
                                                                                1 bedroom dw elling                            $8,560.00                                                                  0                          $0.00
• Type 2 Duplex
• Type 4 Conventional                                                          Secondary dw elling to
• Type 5 Relocatable                                                                                                           $6,249.00                      1                                           1                       $6,249.00
                                                                                 a detached house

                                                                                                                                                                        Sub-Total, Residential =                                 $1,219.35


                                                                                                                                                                                                                       Calculation at
                                                                                                                                                                                                                    Planning Regulation
                                                                                                                                                                                                                         2019-2020
                                                                                                                                                                                                                       Financial Year


                                                                                                                                           CALCULATED INFRASTRUCTURE CHARGE =                                              $1,219.00

                                                                                                                     Other                                                                                                           $0.00
                                                                                                                                                     Council Policy “Infrastructure Charges Rebates For Community
                                                                                 REDUCTIONS                          Rebate                                                                                                          $0.00
                                                                                                                                                     Organisations”

                                                                                                                     Trunk Infrastructure Offset                                                                                     $0.00


                                                                                                                                      *NET INFRASTRUCTURE CHARGE PAYABLE =                                                 $1,219.00




                                                                      PO Box 141                                    P. (07) 5329 6500        [email protected]
                                                                      TEWANTIN QLD 4565                             F. (07) 5329 6501        www.noosa.qld.gov.au                  ICN - Page 3

Used in these records

About this file

File size
518 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PC19-1405_ICN.N1512_9 Dwyer St SUNSHINE BEACH.pdf · 518 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.