Council archive · source document
Approved Plans 3 of 4 Stormwater OPW20-0145 · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
NEW ROAD A 1.08m 0.69m 2.77m 0.69m 1.08m NEW ROAD A
RO
0.25m EXTENDED DETENTION
AD B1 KERB WITH 400mm CUT OUTS
A
BATTER RL7.784
BATTER RL7.784
LIP RL7.934
LIP RL7.934
RO
A
AD
19
SW
A
1%> EXTENDED DETENTION WSL 7.86m (AHD) <1%
1:11.25> <1:11.25
2x DN100 SLOTTED PVC SUBSOIL NE 1:4>
PIPE AT MAX 2.5m CENTRES W
DN BIO BASIN RL7.612 <1:4
I L6 37
.71 5R
2 CP 100mm SUB SOIL DRAINAGE
SW
I L6
A
0.9m
19
.64
SW
300mm WIDE
BACKING STRIP
B1 TYPE KERB WITH 300mm WIDE TAPER
(MIN) BACKING STRIP.
OUTLET PIPE DN375 IL6.72
DATUM RL 6.0 B1 TYPE KERB WITH 300mm WIDE
TAPER (MIN) BACKING STRIP.
300mm WIDE
BACKING STRIP INTO GRATED PIT. GRADE AT 0.5%
BIO-RETENTION BASIN 1 - SECTION A
FOR ROAD A BIORETENTION SCALE 1:50 (A3)
BASIN AREA=20m2
-
BIO-RETENTION BASIN 1 - DETAIL PLAN NOOSA COUNCIL
SCALE 1:500 (A3)
900x900 RC PRECAST
APPROVED PLAN
STORMWATER INLET PIT
WITH RAISED GRATE; OPW20/0145 17 DEC 2020 PLACED LAYER/ROW OF 150MINUS ROCK ON
150mm THICK GROUTED
STONE PITCHING
PLACED LAYER/ROW OF 150MINUS ROCK ON
BIDUM A14 GEOFABRIC AT BASE OF CHUTE.
0.25m REFER TO DETAIL BIDUM A14 GEOFABRIC AT BASE OF CHUTE.
0.25m
EXTENDED WRAP GEOFAB UNDER CONCRETE SPILLWAY.
BATTER OUT WRAP GEOFAB UNDER CONCRETE SPILLWAY. PLACED ROCK TO SIT ABOVE SPILLWAY FSL
DETENTION PLACED ROCK TO SIT ABOVE SPILLWAY FSL
FILTER MEDIA SL7.612
150mm THICK CONCRETE SL62 BIORETENTION BASIN
REINFORCING, 50mm TOP COVER
0.6m DEEP FILTER PROVIDE RAISED STONES
DEPTH: 0.9m
MEDIA LAYER FOR ENERGY DISSIPATION
0.1m DEEP TRANSITION LAYER
0.2m DEEP DRAINAGE LAYER 1.0m CLEAR
0.5% (MIN) PROVIDE LOCKING C.I. CAP TO EXTEND 1:11.25>
DRAINAGE PIPES BASE SLOPE APPROX. 150mm ABOVE
FUNCTION OR SECURE 1:4>
(TYP) CAP WITH SCREWS BASIN SURFACE
R0.3 FLARE
OUTLET PIPE DN375
IL6.712
BIO-RETENTION BASIN 1 - INLET
NOT TO SCALE
SUBSOIL DRAIN CLEANOUT - PVC PIPE
TEMPORARY TURF (NON SLOTTED) AND CONNECTOR 150mm THICK GROUTED BACK KERB
CLEANOUTS AT HEAD OF SUBSOIL STONE PITCHING
BELOW.
DRAIN
150mm THICK CONCRETE SL62
50mm TOP SOIL BIDUM A14 REINFORCING, 50mm TOP COVER
GOETEXTILE FABRIC INVERT B1 BARRIER KERB & CHANNEL
WRAPPED OVER COMPLETE
FILTER MEDIA 1.0m
CLEANOUT POINT DETAILS
BIORETENTION BASIN NOT TO SCALE
REFER TO TYPICAL UNDER-DRAIN: SLOTTED RIGID PIPE TO AS2439.1 OR KERB LIP
CROSS SECTION. APPROVED EQUIVALENT, 0.5% MIN. GRADE. DIA TYPICALLY
SECTION PLAN
PIPE JOINTS SHALL BE GLUED USING PLUMBING CEMENT.
FILTER SOCKS NOT TO BE USED. UNDER-DRAINAGE PIPES KERB OPENING DETAIL KERB OPENING DETAIL
SHALL BE SEALED INTO PITS USING GROUT OR APPROVED NTS
TEMPORARY COVER DETAIL WATERTIGHT SEAL.
NTS
NOT TO SCALE
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED 1856
A 13-09-19 FOR APPROVAL MM CL
B 24-08-20 REVISED STORMWATER ALIGNMENT MM CL DATUM AHD SHEET: 19 OF 30
0 5.0 10 15 20 25m
C
D
21-09-20
16/10/20
REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
REVISED AS PER COUNCIL RFI [29/09/20]
MM
MM
CL
CL
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
E 26-11-20 REVISED AS PER COUNCIL RFI [5-11-20] MM CL SCALE 1:500 A3 p 07 5443 8285 ABN 89 215 591 077
F 10-12-2020 AMENDED LINE 24 BIO BASIN MINOR CHANGES DTB DTB DESIGN CHECK CL (RPEQ 19358) e [email protected] w www.barlowshelley.com.au SW19 F
This drawing is not to be copied or amended without written permission from a PO Box 899, Maroochydore,4558
DATE 13-09-19 Barlow Shelley Consulting Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans 3 of 4 Stormwater OPW20-0145.pdfRelated documentApplication case desk ↗