Original PDF page 17, section 1. The text section number identifies this passage in the reader.
PROVIDE LOCKING C.I. CAP TO EXTEND
FUNCTION OR SECURE APPROX. 150mm ABOVE
CAP WITH SCREWS BASIN SURFACE
USE SLOTTED COLLECTOR
PIPE DUE TO BASIN SHAPE
SUBSOIL DRAIN CLEANOUT - PVC PIPE
(NON SLOTTED) AND CONNECTOR
NE 900x900 RC PRECAST CLEANOUTS AT HEAD OF SUBSOIL
BELOW.
W 0.3m STORMWATER INLET PIT DRAIN
DN
0.3m
4 EXTENDED WITH RAISED GRATE;
50
RC DETENTION REFER TO DETAIL
PS
W
FILTER MEDIA SL7.65
FOR EXISTING ROAD
IL 6 BIORETENTION BASIN AREA=40m2
.15
DEPTH: 0.9m
0.6m DEEP FILTER MEDIA LAYER
CLEANOUT POINT DETAILS
E E 0.1m DEEP TRANSITION LAYER NOT TO SCALE
SW23 SW23 UNDER-DRAIN: SLOTTED RIGID PIPE TO AS2439.1 OR
0.2m DEEP DRAINAGE LAYER
APPROVED EQUIVALENT, 0.5% MIN. GRADE. DIA TYPICALLY
0.5% (MIN)
DRAINAGE PIPES BASE SLOPE PIPE JOINTS SHALL BE GLUED USING PLUMBING CEMENT.
OUTLET PIPE DN450 FILTER SOCKS NOT TO BE USED. UNDER-DRAINAGE PIPES
(TYP)
IL6.15 SHALL BE SEALED INTO PITS USING GROUT OR APPROVED
WATERTIGHT SEAL.
DN100 SLOTTED PVC BIO-RETENTION BASIN 5 - INLET
SUBSOIL PIPE
NOT TO SCALE
PROVIDE MOUNTABLE (SM4 TYPE) WITH
400mm CUT OUT'S TO CHANNEL ROAD C TEMPORARY TURF
RUN-OFF INTO BIO-RETENTION BASIN
PROVIDE 600mm WIDE 600mm
WIDE VEE DRAINS
50mm TOP SOIL
BIO-RETENTION BASIN 5 - DETAIL PLAN GOETEXTILE FABRIC
SCALE 1:250 (A3) WRAPPED OVER COMPLETE
FILTER MEDIA
BIORETENTION BASIN
REFER TO TYPICAL
CROSS SECTION.
12.43m 7.14m 12.43m TEMPORARY COVER DETAIL
NOT TO SCALE
EXTENDED DETENTION
WSL 7.95m (AHD)
LIP RL8.65
LIP RL8.65
1:14> <1:8
BIO BASIN RL7.65
0.9m
0.3m EXTENDED DETENTION
-
NOOSA COUNCIL
PROVIDE 600mm WIDE VEE DRAIN
TO PERIMETER OF FILTER MEDIA
APPROVED PLAN
OPW20/0145 17 DEC 2020
INTO GRATED PIT. GRADE AT 0.5%
MIN 30mm DEEP.
BIO-RETENTION BASIN 5 - SECTION E
SCALE 1:10 (A3)
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED 1856
A 13-09-19 FOR APPROVAL MM CL
B 24-08-20 REVISED STORMWATER ALIGNMENT MM CL DATUM AHD SHEET: 23 OF 30
0 2.5 5 7.5 10 12.5m
C
D
21-09-20
16/10/20
REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
REVISED AS PER COUNCIL RFI [29/09/20]
MM
MM
CL
CL
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
E 26-11-20 REVISED AS PER COUNCIL RFI [5-11-20] MM CL SCALE 1:250 A3 p 07 5443 8285 ABN 89 215 591 077
F 10-12-2020 AMENDED LINE 24 BIO BASIN MINOR CHANGES DTB DTB DESIGN CHECK CL (RPEQ 19358) e [email protected] w www.barlowshelley.com.au SW23 G
G 14-12-2020 RADIUS OF ROUNDABOUT AMENDED DTB DTB This drawing is not to be copied or amended without written permission from a PO Box 899, Maroochydore,4558
DATE 13-09-19 Barlow Shelley Consulting Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans 3 of 4 Stormwater OPW20-0145.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.