Council archive · source document
Approved Plans 3 of 4 Stormwater OPW20-0145 · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
Original PDF page 20, section 1. The text section number identifies this passage in the reader.
NEW
P
RC
DN
0
N
- 75
E
DN
W
NOOSA COUNCIL
75
N
W
FP
NE
0R
E
W
R
L7
CP
FP
APPROVED PLAN
.9
C.I. CAP TO EXTEND
R
PROVIDE LOCKING
5
SW
L7
FUNCTION OR SECURE APPROX. 150mm ABOVE
.
95
OPW20/0145 17 DEC 2020
SW
CAP WITH SCREWS BASIN SURFACE NEW DN750 RCP
FOR ROAD C BIORETENTION
BASIN AREA=9.0m2
SUBSOIL DRAIN CLEANOUT - PVC PIPE FOR ROAD C BIORETENTION
(NON SLOTTED) AND CONNECTOR BASIN AREA=9.0m2 NEW ROAD C
CLEANOUTS AT HEAD OF SUBSOIL PROVIDE SCOUR PROTECTION TO KERB BREAK
BELOW. OUTS & AS PER DETAIL ON PLAN 1856-SW19
DRAIN
PROVIDE SCOUR PROTECTION TO KERB BREAK PROVIDE BARRIER KERB (B1 TYPE) WITH
OUTS & AS PER DETAIL ON PLAN 1856-SW19 CUT-OUT AS SHOWN ON PLAN
1856-SW19
H
SW26
CLEANOUT POINT DETAILS H
NOT TO SCALE SW26
UNDER-DRAIN: SLOTTED RIGID PIPE TO AS2439.1 OR
05
APPROVED EQUIVALENT, 0.5% MIN. GRADE. DIA TYPICALLY
.
L8
5
R
.0
FP
L8
PIPE JOINTS SHALL BE GLUED USING PLUMBING CEMENT.
R
W
FILTER SOCKS NOT TO BE USED. UNDER-DRAINAGE PIPES
FP
E
N
SHALL BE SEALED INTO PITS USING GROUT OR APPROVED
W
E
WATERTIGHT SEAL.
N
TEMPORARY TURF
50mm TOP SOIL
GOETEXTILE FABRIC
WRAPPED OVER COMPLETE STORMWATER BIORETENTION BASIN - DETAIL PLAN
FILTER MEDIA
SCALE 1:250 (A3)
BIORETENTION BASIN
REFER TO TYPICAL
CROSS SECTION.
TEMPORARY COVER DETAIL
NOT TO SCALE
0.35m 7.5m 7.5m 0.35m
0.3m REFER TO KERB OPENING
0.3m DETAIL ON PLAN 1856-SW19
REFER TO KERB OPENING
DETAIL ON PLAN 1856-SW19
2.5% -3% -3% 2.5% 1:-4
1:-4 BIO BASIN RL7.59
NEW ELECTRICAL BIO BASIN RL7.59 NEW WATERMAIN (OD180)
1.0m
1.0m
0.18m EXTENDED DETENTION
0.18m EXTENDED DETENTION
IL6.59 IL6.59
SW
SW
SW
SW
1m
1m
Datum 4
Centreline R.L.8.406
STORMWATER BIORETENTION BASIN - SECTION H
SCALE 1:10 (A3)
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED 1856
A 13-09-19 FOR APPROVAL MM CL
B 24-08-20 REVISED STORMWATER ALIGNMENT MM CL DATUM AHD SHEET: 26 OF 30
0 2.5 5 7.5 10 12.5m
C
D
21-09-20
16/10/20
REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
REVISED AS PER COUNCIL RFI [29/09/20]
MM
MM
CL
CL
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
E 26-11-20 REVISED AS PER COUNCIL RFI [5-11-20] MM CL SCALE 1:250 A3 p 07 5443 8285 ABN 89 215 591 077
F 10-12-2020 AMENDED LINE 24 BIO BASIN MINOR CHANGES DTB DTB DESIGN CHECK CL (RPEQ 19358) e [email protected] w www.barlowshelley.com.au SW26 F
This drawing is not to be copied or amended without written permission from a PO Box 899, Maroochydore,4558
DATE 13-09-19 Barlow Shelley Consulting Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans 3 of 4 Stormwater OPW20-0145.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.