Council archive · source document
Approved Plans 3 of 4 Stormwater OPW20-0145 · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
Original PDF page 22, section 1. The text section number identifies this passage in the reader.
H -
O
FM
A
NOOSA COUNCIL
N
N
D
APPROVED PLAN
R CHASE OUTLET TO IL2.4 IN EXISTING
IV
E
GULLY & PROVIDE ROCK & PRESS OPW20/0145 17 DEC 2020
BOUNDARY
ROCK INTO INVERT OF DRAIN WITH
EXCAVATOR BUCKET. PLACE
GEOTEXTILE OVER THE ROCK & PIN AS
DIRECTED BY SUPERINTENDENT
PROVIDE DN900 HEADWALL
SINGLE CELL
PROPOSED BIORETENTION BASIN
FINISH SURFACE
REFER TO PLAN 1856-SW22 FOR
DETAILS
NATURAL SURFACE FLOW
IL2.5
D50=200mm NEW DN900 RCP SW AT 0.12%
2.7mm
DATUM RL2.0
EXISTING BOX
STORMWATER SYSTEM 5 - SECTION K
CULVERT & GULLY SW SCALE 1:10 (A3)
5 RCP
N 37
NE WD
W
PROVIDE CHILD PROOF SAFTEY PS
RC
GRILL WITH HORIZONTAL SPACING
N 900 K
NOT EXCEEDING 150mm WD
NE SW28
ENERGY DISSIPATER CALCULATION
K FH
OUTLET VELOCITY = 1.0m/s
SW28
PIPE SIZE = DN900 RCP
N
EW
L = 3D [D50 = 200mm]
D
2.7m
N
ENERGY DISSIPATOR LENGTH = 3D x 0.900 = 2.7m
75
0
RC
P
SW
5
1
CHASE OUTLET TO IL2.4 IN EXISTING
GULLY & PROVIDE ROCK & PRESS
ROCK INTO INVERT OF DRAIN WITH
EXCAVATOR BUCKET. PLACE
2.85m
GEOTEXTILE OVER THE ROCK & PIN AS SHIFT EXISTING
DIRECTED BY SUPERINTENDENT FH WHEN DOING
LIVE WORKS
NEW DN900 RCP SW AT 0.12%
CONNECTION
PROVIDE 300x225 RCBC
P SW
7 5 RC
DN3
N EW
E
N
R
EW
FI
H
D
HO
N
S
75
U
FM
B S
0
RC
W ES
AN
P
E
N CC
SW
N
A STORMWATER SYSTEM 5 - ENERGY DISSIPATER DETAIL
STORMWATER SYSTEM 5 - DETAIL PLAN
DR
SCALE 1:10 (A3)
SCALE 1:250 (A3)
IV
E
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED 1856
A 13-09-19 FOR APPROVAL MM CL
B 24-08-20 REVISED STORMWATER ALIGNMENT MM CL DATUM AHD SHEET: 28 OF 30
0 2.5 5 7.5 10 12.5m
C
D
21-09-20
16/10/20
REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
REVISED AS PER COUNCIL RFI [29/09/20]
MM
MM
CL
CL
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
E 26-11-20 REVISED AS PER COUNCIL RFI [5-11-20] MM CL SCALE 1:250 A3 p 07 5443 8285 ABN 89 215 591 077
F 10-12-2020 AMENDED LINE 24 BIO BASIN MINOR CHANGES DTB DTB DESIGN CHECK CL (RPEQ 19358) e [email protected] w www.barlowshelley.com.au SW28 F
This drawing is not to be copied or amended without written permission from a PO Box 899, Maroochydore,4558
DATE 13-09-19 Barlow Shelley Consulting Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans 3 of 4 Stormwater OPW20-0145.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.