NOOSA COUNCIL
APPROVED PLAN
OPW20/0145 17 DEC 2020
CHASE OUTLET TO IL2.4 IN EXISTING
GULLY & PROVIDE ROCK & PRESS
ROCK INTO INVERT OF DRAIN WITH
EXCAVATOR BUCKET. PLACE PROVIDE FILL OVER NEW NATURAL SURFACE
GEOTEXTILE OVER THE ROCK & PIN AS DN900 SW PIPE AS
DIRECTED BY SUPERINTENDENT REQUIRED
PROVIDE DN900 HEADWALL
SINGLE CELL
CE
RFA
H SU
FINIS
PROVIDE FILL OVER NEW
DN900 SW PIPE AS
REQUIRED
NATURAL SURFACE FLOW
IL2.5
D50=200mm NEW DN900 RCP SW AT 0.12%
2.7mm
DATUM RL5.0
PROVIDE CHILD PROOF
SAFTEY GRILL WITH
HORIZONTAL SPACING
NOT EXCEEDING 150mm
STORMWATER SYSTEM 19 - SECTION M
SCALE 1:10 (A3)
SW M
00 RCP SW30
DN9
NEW
ENERGY DISSIPATER CALCULATION
M
SW30 OUTLET VELOCITY = 1.0m/s
PIPE SIZE = DN900 RCP
L = 3D [D50 = 200mm]
2.7m ENERGY DISSIPATOR LENGTH = 3D x 0.900 = 2.7m
CHASE OUTLET TO IL2.4 IN EXISTING
GULLY & PROVIDE ROCK & PRESS
ROCK INTO INVERT OF DRAIN WITH 5
EXCAVATOR BUCKET. PLACE 1
GEOTEXTILE OVER THE ROCK & PIN AS
DIRECTED BY SUPERINTENDENT
2.85m
NEW DN900 RCP SW AT 0.12%
STORMWATER SYSTEM 19 - ENERGY DISSIPATER DETAIL
STORMWATER SYSTEM 19 - DETAIL PLAN SCALE 1:10 (A3)
SCALE 1:250 (A3)
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED 1856
A 13-09-19 FOR APPROVAL MM CL
B 24-08-20 REVISED STORMWATER ALIGNMENT MM CL DATUM AHD SHEET: 30 OF 30
0 2.5 5 7.5 10 12.5m
C
D
21-09-20
16/10/20
REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
REVISED AS PER COUNCIL RFI [29/09/20]
MM
MM
CL
CL
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
E 26-11-20 REVISED AS PER COUNCIL RFI [5-11-20] MM CL SCALE 1:250 A3 p 07 5443 8285 ABN 89 215 591 077
DESIGN CHECK CL (RPEQ 19358) e [email protected] w www.barlowshelley.com.au SW30 E
This drawing is not to be copied or amended without written permission from a PO Box 899, Maroochydore,4558
DATE 13-09-19 Barlow Shelley Consulting Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans 3 of 4 Stormwater OPW20-0145.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.