Council archive · source document
Approved Plans 3 of 4 Stormwater OPW20-0145 · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
D
JOINS PLAN 1856-SW10 OA
GR
DN TIN
DN750
FOR STRUCTURE 1/19 OUTLET
DN900 45
0 EXIS
DETAIL REFER TO PLAN 1856-SW30
DN
E
75
HAY DRIV
0
WALTER
DN
75
0
0
75 CONSTRUCT 1:2 1m WIDE TABLE DRAIN &
DN
GRADE INLET OF STORMWATER STRUCTURE
DN750 5/20 (REFER TO LONGITUDINAL SECTION FOR
INLET INVERT LEVEL
ROAD C
FOR ROAD B TREE PIT DETAIL PROVIDE CHILD PROOF SAFTEY
PLAN REFER TO PLAN 1856-SW26 GRILL WITH HORIZONTAL SPACING
NOT EXCEEDING 150mm
-
NOOSA COUNCIL
APPROVED PLAN
OPW20/0145 17 DEC 2020
LOT 3
4.004 Ha
JOINS PLAN 1856-SW05
ATTENTION: STORMWATER PIPES
ALL STORMWATER PIPES ARE TO BE
REINFORCED CONCRETE PIPES (RCP)
WITH RRJ JOINTS UP TO DN750 THERE
AFTER TO BE FLUSH JOINT (FJ)
LOT 7
ATTENTION:
IT IS THE CONTRACTORS RESPONSIBILITY 2.963 Ha
TO NOTIFY THE ADJACENT PROPERTY
OWNERS PRIOR TO ANY WORKS
COMMENCING ONSITE
CAUTION:
EXISTING SERVICES THE CONTRACTOR IS
TO DETERMINE THE EXACT LOCATION OF
E
HAY DRIV
ALL EXISTING SERVICES IN THE VICINITY
OF THE PROPOSED WORKS PRIOR TO THE
START OF ANY CONSTRUCTION. THE COST
C
OF ANY RECTIFICATION WORKS DUE TO
AD
DAMAGE TO EXISTING SERVICES SHALL BE
WALTER
BORNE BY THE CONTRACTOR.
RO
JOINS PLAN 1856-SW05
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED 1856
A 19-02-20 FOR APPROVAL MM CL
B 24-08-20 REVISED STORMWATER ALIGNMENT MM CL DATUM AHD SHEET: 9 OF 30
0 10 20 30 40 50m
C
D
21-09-20
16/10/20
REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
REVISED AS PER COUNCIL RFI [29/09/20]
MM
MM
CL
CL
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
E 26-11-20 REVISED AS PER COUNCIL RFI MM CL SCALE 1:1000 A3 p 07 5443 8285 ABN 89 215 591 077
F 10-12-2020 AMENDED LINE 24 BIO BASIN MINOR CHANGES DTB DTB DESIGN CHECK CL (RPEQ 19358) e [email protected] w www.barlowshelley.com.au SW09 F
This drawing is not to be copied or amended without written permission from a PO Box 899, Maroochydore,4558
DATE 13-09-19 Barlow Shelley Consulting Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans 3 of 4 Stormwater OPW20-0145.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.