Original source · versioned page text
Planning Report - 10 independent living units
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
Please refer to Appendix C for a copy of the Proposal Plans prepared by Palm Lake Works. The extension occupies an area of 5,796m2 where the use proposed remains consistent with that approved in the current resort. As mentioned in Section 4.0, the intention is to transition and preserve the existing use and development rights established by the existing approval. The below Figures (3 & 4) demonstrate the current approved layout and the proposed layout inclusive of the extension. Figure 3: Existing Approved Plan MCU15/0111 Figure 4: Proposed Site Plan with extension Changes to the site as a result of the extension include: Changes to the overall development site and staging plans; Result in the development comprising 230 independent dwelling units; and The development will now incorporate Stage 6 for the purpose of construction. The site will feature an additional 10 independent living units to be located to the north of Lots 217- 220. These units will be serviced by the internal road network with the addition of a new one way circuit resulting in the overall development being comprised of 230 independent dwelling units. All remaining components of the existing development will stay unchanged. Please refer to Appendix C for a copy of the Proposal Plans prepared by Palm Lake Works dated November 2017. 15 November 2017 Planning Report Page 12 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.