5.0       Technical Review
5.1       Stormwater Management
The proposed development is required to be accompanied by a Stormwater Management Plan.
However, the proposed extension site is considered to have already been incorporated in the existing
Stormwater Management Plan for 19 Trading Post Road.

The approved Stormwater Management Plan for the larger Multiple Housing development on
adjoining land appears to include provisions for the development of the subject site for the following
reasons:

         The subject site is categorised as D3 on approved Stormwater Management Plans;
         Music Modelling of the larger site include D3 modellings for Ground, Roof and Road that are
          all included within the receiving node;
         Plan Reference B14158.W-SK102 ‘Music Catchment Plan’ Revision E identifies Biopod D3
          future development to have own stormwater quality treatment controls – filter area 75m2,
          filter depth 0.4m and temp. ponding depth 0.2m.

A copy of the Stormwater management Plan has been provided as Appendix E of this report. Further
to this please refer to the Civil Engineering Report (Appendix D) prepared by Pinnacle Engineering for
proposal plans regarding the location of the stormwater bio retention basin.

5.2       Electricity and Telecommunications
The proposed development will be connected to all infrastructure services including electricity,
telecommunications, water, sewer and road.

The existing development in connected to electricity (operated by Energex) and telecommunications
(operated by Telstra) via underground infrastructure located within the Trading Post Road reserve
south of the subject extension. It is proposed that the extension site will connect to these existing
services within the adjacent road reserve. The connections to electrical and telecommunication
networks will be finalised during the detailed design phase on the development.

5.3       Sewer Reticulation
The subject site features a DN160mm PE sewer main along the eastern boundary of the site. This
infrastructure is protected under an existing sewer easement. The sewer grades to the north and
joins the existing sewerage reticulation network to the east of the subject site.

It is expected the proposed extension will demand 0.328L/sec during PWWF on the downstream
sewerage network. Please refer to the Civil Engineering Report prepared by Pinnacle Engineering for
further information.




15 November 2017                                Planning Report                         Page 14 of 30
Log in to download the original file

Planning Report - 10 independent living units.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.