Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2018-06-12 Planning & Environment Committee Agenda

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                           AGENDA


   Planning & Environment
     Committee Meeting


                 Tuesday, 12 June 2018


                     commencing at 9.30am
            Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Brian Stockwell (Chair), Jess Glasgow, Ingrid Jackson, Tony Wellington




                       “Noosa Shire – different by nature”
Log in to download the original file

2018-06-12 Planning & Environment Committee Agenda(PDF, 11MB).pdf · 11.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 84 (of 97)

Section 2

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                   12 JUNE 2018


TABLE OF CONTENTS

ITEM                                                                        PAGE

ATTENDANCE & APOLOGIES                                                         -

PRESENTATIONS                                                                  -

REPORTS FOR CONSIDERATION OF THE COMMITTEE                                     3

1      NOOSA BIOSPHERE RESERVE FOUNDATION - PROPOSED FUNDING DEED              3

2      MCU18/0040 - DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF USE
       FOR ENTERTAINMENT AND DINING BUSINESS TYPE 1 FOOD AND
       BEVERAGE AT THE BEACH CHALETS 11/1 TINGIRA CRES, SUNRISE BEACH         31

3      MCU17/0551 - APPLICATION FOR MATERIAL CHANGE OF USE FOR MULTIPLE
       HOUSING TYPE 3 - RETIREMENT OR SPECIAL NEEDS (PALM LAKE RESORT -
       STAGE 6) LOCATED AT 20 TRADING POST ROAD, COOROY                       39

4      MCU18/0004 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF
       USE FOR ENTERTAINMENT & DINING BUSINESS - TYPE 1 (FOOD &
       BEVERAGE) AT 56 MAIN STREET, KIN KIN                                   57

5      132003.221152.7 PRE-REQUEST TO CHANGE AN EXISTING APPROVAL FOR
       MATERIAL CHANGE OF USE FOR A DWELLING AT 12 PARK ROAD, NOOSA
       HEADS                                                                  72

6      MCU16/0144 - REPRESENTATIONS TO CONDITIONS - DEVELOPMENT PERMIT
       FOR MATERIAL CHANGE OF USE OF PREMISES RETAIL BUSINESS TYPE 2
       SHOP AND SALON AT 1 KINGSGATE DRIVE, TINBEERWAH                        84

7      RAL17/0504 PLANNING & ENVIRONMENT COURT APPEAL NO D61 OF 2018
       REFUSAL OF APPLICATION TO RECONFIGURE A LOT (1 INTO 4 LOTS) AT 135
       LAKE WEBYA DRIVE, NOOSAVILLE                                           89

8      PLANNING & ENVIRONMENT APPEAL NO. 1302 OF 2018 REGARDING
       ENFORCEMENT NOTICE - 105 RESORT DRIVE, NOOSA HEADS                     92

CLOSED SESSION                                                           -




                                                                    Page 2 of 97

Section 3

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                         12 JUNE 2018



REPORTS FOR CONSIDERATION OF THE COMMITTEE
1                        NOOSA BIOSPHERE RESERVE FOUNDATION - PROPOSED FUNDING DEED
DOCUMENT INFORM AT ION




Author                               Chief Executive Officer, Brett de Chastel
                                     CEO’s Office

Index                                ECM/ Subject / Noosa Biosphere Reserve Foundation Management;
                                     Subject/ Council Buildings & Leases / Application/Lease Ref # Cle15/0001
                                     Property / 145676

Attachments                          1.    Draft Funding Deed
                                     2.    Summary of NBRF Projects



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the Planning & Environment
Committee Meeting dated 12 June 2018 and:
A.                       Agree to enter into a 3-year Funding Deed with the Noosa Biosphere Reserve Foundation
                         (the Foundation) as set out in Attachment 1 to the report;
B.                       Authorise the Chief Executive Officer to make any minor alterations to the Funding Deed,
                         as may be necessary, and enter into the Funding Deed with the Foundation;
C.                       Offer the Foundation the remaining 3-year lease option to continue the use of the Council
                         premises at 52 Doonella Street, Tewantin subject to the existing lease conditions and
                         continuation of the informal arrangements for use of the premises by other community
                         groups.


REPORT
The purpose of this report is to:
1.                       Propose a new three (3) year funding deed with the Noosa Biosphere Reserve Foundation
                         (the Foundation); and
2.                       Offer the Foundation the option for continuation of the lease for a further three (3) years for
                         use of Council premises at 52 Doonella Street, Tewantin.
The proposed new funding deed is provided as Attachment 1.

Background
Following a review of the existing governance model and a series of public consultations during
2014, Council established the Noosa Biosphere Reserve Foundation (the Foundation) and the
Noosa Biosphere Reserve Trust (the Trust) with the arrangements registered in February 2015.
The Foundation is managed by an independent board of volunteers with Council entitled to one
representative on the Board. Councillor Wilkie is our current Council representative on the
Board.


                                                                                                          Page 3 of 97

Section 4

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        12 JUNE 2018


The Foundation is a registered charity with the Australian Charities and Not-for-profits
Commission and is endorsed by the Australian Tax Office for tax concessions including GST,
income tax and fringe benefit tax rebate.

The Trust and its public fund were entered onto the Commonwealth Register of Environmental
Organisations as of 27 April 2016 which was necessary to achieve Deductible Gift Recipient
(DGR) status. DGR status provides a tax deduction for donors who donate to registered
charitable organisations.

It was considered by the Council that a model independent from the direct control of Council and
with DGR status would be able to better attract funding partners such as educational
establishments, philanthropic organisations and individuals to contribute to relevant projects. It
could also attract direct donations.

As part of the establishment of the Trust and Foundation in 2015, Council agreed to provide
funding support to the Foundation over a three (3) year period from 1 July 2015 with the Funding
Deed specifying that Council would consider future funding arrangements at the end of the initial
3-year term. The original Funding Deed expires on 30 June 2018.

The intent was that the Foundation should, in time, become less reliant on Council funding by
attracting tax deductible donations in addition to attracting funding contributors for projects.
However, fund raising in the not for profit sector is notoriously difficult even with tax deductibility
and the Foundation has not been able to undertake a high level of focus on this aspect due to a
range of factors including the significant task of establishing a new organisation (organisational
structure, policies, strategies etc). Their main priorities have been to establish a grants program,
have oversight of the many worthwhile projects that they have been able to foster, and to assist
in the drafting of the periodic review report to UNESCO.

1.    Funding Deed 2015-2018
The current Funding Deed provides specific funding for operational expenses and project funding
during year 1 of the deed with funding over the remaining years subject to negotiation. Each year
the Foundation has submitted a budget request for consideration as part of Council’s annual
budget deliberations.

A summary of the budget provision and total payments made to the Foundation over the 3-year
term of the deed is provided below together with explanatory notes. The contribution for
operational expenses and a one-off grant for economic purposes (in 2015/16) have been funded
from general rates and grant program funds have been funded through the Environment Levy.

FY          Original Budget    Actuals paid to    Actuals paid to         Additional     Total paid to
                  Allocation            NBRF               NBRF      funding paid to            NBRF
                           $    (Operational)    (Grant Program)    NBRF (multi-year                 $
                                             $                  $          projects)
                                                                                   $

2014/15             40,000            40,000                  0                   0           40,000
2015/16            470,000           140,000            330,000             360,000          830,000
2016/17            390,000            70,000            250,000                   0          320,000
2017/18            390,000           140,000            250,000                   0          390,000
Totals:                              390,000            830,000             360,000       $1,580,000

Notes:
1. Amounts exclude GST where applicable. Where funds are contributed for a specific purpose the
   payments attract GST whereas any untied contribution towards the grants program is GST exempt.
2. The 2014/15 funding was an initial payment for start-up operational expenses. In practice, although
   budgeted in 2014/15 this was carried over and paid in July 2015 as Doonella House was not ready for
   occupation.

                                                                                        Page 4 of 97

Section 5

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         12 JUNE 2018


3. The additional multi-year project funding of $360,000 in 2015/16 was approved by Council at its
   meeting on 17 December 2015. This amount attracted GST as it was a grant tied to specific purposes.
4. In 2016/17 NBRF indicated that they did not require the full $140,000 budget for operational expenses
   and provided invoices requesting $70,000 only.
5. In the CEO’s report to Council dated 6 February 2018, it was indicated that the Foundation did not
   intend to request payment of $250,000 in project funding for the 2017/18 financial year as they were
   committed to their current round of grant projects. However, this amount has now been drawn down at
   NBRF’s request in accordance with the terms of the current funding agreement and Council’s 2017/18
   adopted budget.

2.    Funding outcomes
Attachment 2 provides a short summary of funded projects, the proponents, total value including
and status of each project.

This Foundation has approved a total of 13 projects at a total value of $2,775,016 with an
investment by Council of Environment Levy funds totalling $919,916. The model of using a
public Trust has been successful in attracting a variety of project partners with Council grant
funding leveraged by a factor of 3:1 (total project value compared to value of Council’s grant
program funding).

3.    Performance
Aside from the Funding Deed, the Foundation has faced challenges associated with turnover in
its board composition, community perceptions about the governance model and the need for
transparency of its operations given the level of ratepayer funding being provided to the
Foundation.

Communications between the Foundation and Council include regular informal updates provided
to Councillors in addition to the formal reports required under the current Funding Deed.

It is also important to note that NBRF is required to meet the purposes of the trust that was
established by the Council. In doing so, this enables them to retain DGR status.

4.    Proposed funding deed 2018-2021
It is proposed that Council enter into a further three-year Funding Deed based on continued
funding of operational expenses up of $140,000 for year 1 of the deed with consideration of any
future operational funding being conditional on their response to a Noosa Council request to
undertake governance reform (see reference to Clause 6 below) and subject to annual
negotiation (as is the case with the current Funding Deed).

Key changes proposed in the proposed draft deed compared to the 2015 – 2018 funding deed
include:
a)    Project funding is identified during Year 1 of the deed only with an amount of $125,000
      quarantined from the Environment Levy for applications for project funding put forward by
      the Foundation. The Foundation may apply for a greater amount but it is up to Council as to
      whether it approves that funding based on the suitability of proposed projects, alignment
      with the Trust purposes and Council’s strategic aims for the Noosa Shire environment.
b)    Council will have the final decision in relation to Council grant funding as it will determine
      whether to approve projects and associated Council grant funding as opposed to the
      current model of grant funding being provided direct to the Foundation who currently
      determine which projects receive funding from that Council grant.
c)    Funding for projects over the remaining 2 years of the deed is subject to Council’s grants
      process (i.e. no guarantee of any project grants for NBRF with funding being allocated by
      Council based on the merits of projects put forward). NBRF is being encouraged to focus
      more on their fundraising role.

                                                                                         Page 5 of 97

Section 6

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       12 JUNE 2018


d)    Clause 6 – Funding Conditions proposed:
         More detailed requirements in terms of the Foundation providing a Strategic Plan and
           Operational Plan;
          The Foundation is to provide details of changes they are instituting to improve its
            governance model, transparency around its operations, reporting to the community
            as well as fund-raising effectiveness. Future operational funding is dependent on this
            element; and
          The NBRF Annual Report and audited financial statements be bought forward to no
            later than 30 November or 30 days after their Annual General Meeting (whichever is
            the sooner). This is to overcome the current situation where the Annual Report &
            Audited Financial Statements are not received until 6 months or more after financial
            year end.
e)    Performance indicators are incorporated into the deed – refer Schedule 1.

5.    Council’s role in the Noosa Biosphere Reserve
While this report is primarily focused on the next funding deed, it is also important to note that the
intent behind the changes to the funding deed is that the Council will take a more primary role in
the overall direction of the Noosa Biosphere Reserve.

The reason for this is quite simple. It is the Council as the local authority that has the most
significant impact on the range of issues that affect Noosa Biosphere Reserve (examples include
Council’s planning scheme, environmental policies, social strategy etc). Our Council can
incorporate the Man in the Biosphere goals into its own policies and actions. Our Council will
also work in collaboration with the Foundation and other stakeholders to meet our Biosphere
obligations (such as the 10-year renewal) and planning for future management of the Biosphere.
The role of NBRF will focus on raising funds, proposing projects that will advance the objectives
of the Biosphere and acting as an expert panel on Biosphere issues.

6.    Lease of 52 Doonella Street, Tewantin
By resolution dated 12 March 2015, Council agreed to enter into a lease by the Foundation of
Council owned premises at 52 Doonella Street, Tewantin. The lease term is for 3 years with a 1
x 3-year option. The first term of 3 years concludes on 30 June 2018.

It is proposed to offer the Foundation the option to extend the lease for a further 3 years under
the existing terms and on the basis that they may continue any existing informal arrangements
for use of the premises by other community groups (e.g. Noosa Integrated Catchment
Association currently use part of the building).

Previous Council Consideration
Ordinary Meeting, 7 May 2015, Page 12, Item 4
That Council note the report by the Executive Officer to the Planning & Organisation Committee
Meeting dated 28 April 2015 and:
A.    Agree to the revisions made to the draft funding deed between Council and the Noosa
      Biosphere Foundation Ltd as detailed in Attachment 1 to the report; and
B.    Authorise the Chief Executive Officer to amend Clause 4 – Payments to provide for the
      project funding under Clauses 4.1 B ii) and iii) to be paid after 30 June 2015 and to finalise
      the arrangements.




                                                                                        Page 6 of 97

Section 7

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     12 JUNE 2018


Ordinary Meeting, 12 March 2015, Page 10, Item 3
That Council note the report by the Executive Officer to the Planning & Organisation Committee
Meeting dated 3 March 2015 and the further report to the General Committee Meeting dated 9
March 2015 and:
A.   Agree to enter into a funding deed with the Noosa Biosphere Reserve Foundation Ltd as
     provided in Attachment 1 to the report to Planning & Organisation Committee dated 3
     March 2015 with the following changes:
     1.    Clause 4.1 Payments
           Amend clause 4.1 b) ii) to read “$250,000 (excluding GST) – payable to the NBRF
           Public Trust from the Environment Levy for projects that conserve and/or improve
           biodiversity in the Noosa Shire and have tangible and measurable outcomes”.
           Amend clause 4.1 b) iii) to read “$80,000 (excluding GST) – payable to the NBRF
           Public Trust for economic projects consistent with the purposes of the Trust.
     2.    Clause 6.2 Repayment of Funding
     Amend as outlined in the further report to General Committee dated 9 March 2015.
B.   Authorise the Chief Executive Officer to make minor alterations to the Deed, as may be
     necessary, and enter into a formal agreement with the Foundation;
C.   Agree in principle to a one-off contribution of $10,000 being for the establishment and initial
     operating costs of a community based incorporated association that is aligned with the
     purposes of the Noosa Biosphere Reserve Trust, subject to no membership fees being
     charged until after the second annual general meeting;
D.   Apply the exception to the requirement for tendering under Section 236(1)(b)(ii) of the Local
     Government Regulation 2012 for the occupancy of part of Council owned premises located
     on Lot 1, RP96529 at 52 Doonella Street, Tewantin as the proposed lease is to a not for
     profit community organisation; and
E.   Authorise the Chief Executive Officer to enter into negotiations with the Noosa Biosphere
     Reserve Foundation Ltd and finalise a lease for part of Council owned premises located on
     Lot 1, RP96529 at 52 Doonella Street, Tewantin, for a period of 3 years, with a 3 year
     option.

Finance
Since the Noosa Biosphere Reserve designation in 2007, both Sunshine Coast and Noosa
Council have provided funding to support activities aligned with the purposes of the UNESCO
Man and the Biosphere program. Sunshine Coast Council allocated specific program funding as
well as providing a full time project support officer, technical management (60-70% of a role),
provided the Company Secretary role for the former company, paid for audit costs and some
additional administrative assistance as required. Noosa Council moved to the NBR Public Trust
arrangement in 2015 and continued to fund the program.

In the first year of funding under the new arrangement, provision is made for $140,000 for
operational expenses which is the same level as the previous deed, and a reduced amount for
project funding from $250,000 to $125,000 funded from the Environment Levy. Operational
expenses in years 2 & 3 of the deed will be subject to negotiation and having regard to Council’s
overall budgetary position and of course, subject to Council being satisfied in relation to NBRF
governance reform. Savings from reduced project grant funding from the Environment Levy will
be reinvested into initiatives aligned with Council’s Environment Levy Policy.

The draft 2018/19 budget includes the funding proposed under the new arrangement.



                                                                                      Page 7 of 97

Section 8

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   12 JUNE 2018


Risks & Opportunities
The proposed new funding arrangement ensures that any funded projects are approved by
Council and thereby removes the risk of the NBRF undertaking any projects that may not be
aligned with Council’s overall strategic direction.

Consultation
External Consultation - Community & Stakeholder
Noosa Biosphere Reserve Foundation Chairperson and Deputy Chairperson. While the general
principles of the proposed funding deed have been discussed with NBRF, until the final format of
the proposed deed is adopted by Council, no negotiations have been undertaken with NBRF
regarding the detailed wording, hence recommendation B in the report.

Internal Consultation
A series of workshops have been held with Councillors regarding the proposed funding deed.
Feedback was also sought from key staff regarding the benefit of projects undertaken to date
with funding provided to NBRF by Council via the existing funding deed. Details of that feedback
are below.
Environmental Services advise that the NBRF grants program funded projects related to koalas,
Bring Back the Fish and Keep It in Kin Kin are providing useful scientific data towards Council’s
strategic objectives in these areas.

The data collected from the research by USC into the distribution and health of Noosa’s koalas,
through scat detection and DNA analysis, has been used to develop Koala Habitat Maps for the
new Noosa Plan and to help inform Council’s operational works programs. It is anticipated that
further research being funded from the current round of NBRF grants will target specific areas
such as Yurol-Ringtail State Forest. The gathering of data and information in this area will
provide a baseline on current koala populations and help to determine the effectiveness of this
significant koala habitat recovery project.

The partnerships formed and research undertaken which led to the NBRF grant funded Bring
Back the Fish project provided relevant science-based research about the Noosa River fisheries
and options for the restoration of lost oyster reef habitats to improve fisheries.

The NBRF grant funded Keep it in Kin Kin project enabled Noosa and District Landcare to
undertake a LIDAR study to identify the degree of soil loss in the Kin Kin sub-catchment. This
research, combined with a Council commissioned ‘condition assessment’ of all waterways in
Noosa, provided relevant, science-based research about landslips, erosion hotspots and where
to target investment to repair degraded waterways and wetlands.

Both Bring Back the Fish and Keep it in Kin Kin are highlighted as key partner projects in the
draft Noosa River Plan. The project outcomes will assist Council to continue to advocate as a
key stakeholder in the State’s sustainable fisheries management reforms for the Noosa region
and help reduce sediment inputs to Lake Cootharaba, improve water quality, habitat and health
throughout the river system.




                                                                                   Page 8 of 97

Section 9

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                           12 JUNE 2018


Departments/Sections Consulted:

X   Chief Executive Officer       Community Services                      X   Corporate Services
X   Executive Officer             Director                                x   Director
    Executive Support             Community Development                       Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                              x   Property
                                  Waste & Environmental Health                Revenue Services

    Executive Services        X   Environment & Sustainable Development       Infrastructure Services
    Director                  X   Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture        x   Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                            Page 9 of 97

Section 10

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 10 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JUNE 2018

   : wR                Aid

   Funding Deed

   NOOSA SHIRE CQUNCIL

   NOOSA‘BIOSPHERBE,RESERVE
   FOUNDATION LTDias trustees for the
   NOOSA BIOSPHERE RESERVE TRUST

                                       Page 10 of 97

Section 11

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




               T
            AF
 R
D



                                                  Page 11 of 97

00                                                                                                                              N
 rr                                                                                                                             o
 =)                                                                                                                             =
 N                                                                                                                              °
 Ww                                                                                                                             -
 za                                                                                                                             r
 =>          rr Oo WO WHO  MO O OO Oo onrererRe DW DWH HD ODO DO ODO TT TT TFT TT TNNNNNN          DO OM ODO YM OY              oO
              PoP ob  bE   EE dE    Ebb     be    bE ob   EE    EO EO EO ub ub uEOUdEOU ub UE UE UE UdEOUuEOU UE EUG ob:        ©
 =            a                                                                                                                 Oo.

 <            a
 Q            a                                       ES
 =                                   ly SS          = \OY =
Lu                                        RE
 oO           Poo  bb    EOE  EOP   Pb EON  SE      gb       PE      PEE     EE    EE    EOP  bo dE ob ob ob ob:
 <                                                      A
 9            a                                                                        a
 z=           a
 KE           a           DT
Lu            PoP ob     EOE  bE    bo EOE   bE UE UE     BEN                   EE       EO   EZ    EE   EE:
 Lu           Po obo ior bo Eo?  bod   boi  fo to:piiwl   Me    | SMP      cps  5  ft    tf   EOE     i  bE
 =            Po obo Po PoP   bob ob   boi ot  fo i op 2  Me    quer    :  Me   fib      PE   PR    fob  bob:
ud             EQ:       bob ob  bob obo:   io:   bop S/R              ft                te   BEG:
 -            PEDO    GF EY BoP     Eb   bo bob   Pb PENSE Bb         Eee       bik      iB   PD    bb   Eo:
 Ee           Pot Zo oto ot @ F&F i bobo bobo bobo otse   FO G@   ft    ft ot   to ut Be EY SP ot obo:
 =            Poi WM  fo: BB     :  bo bo:  to ft botO    iuaii      £ oe  gt:  ti: ge E B          ee
 =            = Ao
 =                i   bbe EP        i  rif:       i> BiB kw             ES        wees     ge Pe       ig
                4     4
5	1	1	3	1	3	931	1518	30	3	43	OD
5	1	1	3	1	4	1026	1511	4	4	23	5
5	1	1	3	1	5	1207	1512	29	4	68	—
5	1	1	3	1	6	1302	1499	9	24	42	«=
5	1	1	3	1	7	1363	1499	6	24	22	«=
5	1	1	3	1	8	1578	1511	3	4	56	.
5	1	1	3	1	9	1853	1512	3	5	41	:
5	1	1	3	1	10	1922	1512	3	4	67	«
5	1	1	3	1	11	1991	1511	72	5	18	“a=
5	1	1	3	1	12	2090	1499	39	25	6	 -:
5	1	1	3	1	13	2397	1499	9	29	1	Oo
5	1	1	3	1	14	2680	1511	3	4	0	»
5	1	1	3	1	15	2749	1512	4	4	43	+
5	1	1	3	1	16	2792	1512	98	14	58	OW:
4	1	1	3	2	0	163	1501	2727	73	-1	
5	1	1	3	2	1	163	1501	19	73	25	oO
5	1	1	3	2	2	475	1517	142	49	10	Pie
5	1	1	3	2	3	681	1522	4	28	0	§
5	1	1	3	2	4	750	1499	172	74	21	oF
5	1	1	3	2	5	931	1522	168	36	61	Bio
5	1	1	3	2	6	1145	1518	91	40	41	PG
5	1	1	3	2	7	1302	1499	279	74	32	isres,
5	1	1	3	2	8	1620	1505	99	55	47	cS
5	1	1	3	2	9	1766	1519	22	20	47	8
5	1	1	3	2	10	1853	1503	1037	65	6	 FeoywesteEas
5	1	1	3	2	11	2518	1499	149	74	39	ese
5	1	1	3	2	12	2697	1499	198	74	42	if:
3	1	1	4	0	0	155	1546	2735	366	-1	
4	1	1	4	1	0	475	1546	2415	56	-1	
5	1	1	4	1	1	475	1546	71	56	28	io}
5	1	1	4	1	2	681	1544	142	57	58	Pope
5	1	1	4	1	3	870	1544	366	57	0	OFSMOFTEZ
5	1	1	4	1	4	1302	1558	4	27	24	:
5	1	1	4	1	5	1344	1551	99	23	73	FU
5	1	1	4	1	6	1491	1564	90	26	53	DY
5	1	1	4	1	7	1628	1561	91	23	26	Do
5	1	1	4	1	8	1759	1544	97	57	26	Zw:
5	1	1	4	1	9	1922	1557	3	27	13	§
5	1	1	4	1	10	1991	1544	12	57	19	Gg
5	1	1	4	1	11	2040	1557	92	27	48	OE
5	1	1	4	1	12	2172	1548	98	31	55	Fo
5	1	1	4	1	13	2320	1544	433	57	4	lLFsxXYoun:
5	1	1	4	1	14	2790	1544	30	57	35	BS
5	1	1	4	1	15	2833	1544	48	57	63	:
4	1	1	4	2	0	155	1568	2735	50	-1	
5	1	1	4	2	1	155	1573	34	27	41	E
5	1	1	4	2	2	543	1564	35	67	7	i
5	1	1	4	2	3	587	1564	99	67	0	6wn
5	1	1	4	2	4	755	1583	137	35	0	Oe
5	1	1	4	2	5	931	1572	236	44	0	F225
5	1	1	4	2	6	1207	1580	30	24	0	5
5	1	1	4	2	7	1308	1578	135	29	4	BG
5	1	1	4	2	8	1492	1564	89	67	0	SPR
5	1	1	4	2	9	1626	1564	102	67	0	SCHR
5	1	1	4	2	10	1759	1575	97	33	0	SY
5	1	1	4	2	11	1904	1573	159	42	0	SBE
5	1	1	4	2	12	2103	1568	787	50	0	srnsaeerOERZH
5	1	1	4	2	13	2709	1564	186	67	25	iB:
4	1	1	4	3	0	129	1596	2761	92	-1	
5	1	1	4	3	1	129	1600	59	88	45	ii
5	1	1	4	3	2	497	1596	188	47	43	FER
5	1	1	4	3	3	750	1603	73	40	18	Pe
5	1	1	4	3	4	863	1608	168	39	0	SRO
5	1	1	4	3	5	1077	1606	22	29	0	F
5	1	1	4	3	6	1145	1608	91	29	52	Be
5	1	1	4	3	7	1353	1592	435	79	4	SEQORAZRTS
5	1	1	4	3	8	1853	1610	349	41	50	NESSES
5	1	1	4	3	9	2241	1592	236	79	0	cpomes
5	1	1	4	3	10	2531	1592	21	79	20	72
5	1	1	4	3	11	2584	1602	31	36	5	e
5	1	1	4	3	12	2661	1612	22	39	66	8
5	1	1	4	3	13	2749	1609	141	35	54	is.
4	1	1	4	4	0	161	1632	2729	63	-1	
5	1	1	4	4	1	161	1632	16	61	44	Ww
5	1	1	4	4	2	475	1639	142	39	0	PPR
5	1	1	4	4	3	655	1642	168	36	0	Oia
5	1	1	4	4	4	870	1633	361	62	17	SHEELLUH
5	1	1	4	4	5	1283	1637	160	43	62	FEF
5	1	1	4	4	6	1490	1633	98	62	21	Cec
5	1	1	4	4	7	1628	1633	160	62	0	ocER
5	1	1	4	4	8	1824	1633	17	62	55	SY
5	1	1	4	4	9	1972	1634	91	60	8	o40
5	1	1	4	4	10	2111	1639	21	18	71	5
5	1	1	4	4	11	2172	1634	98	60	13	L@E
5	1	1	4	4	12	2316	1634	87	60	31	S83
5	1	1	4	4	13	2418	1634	59	60	33	ic
5	1	1	4	4	14	2585	1639	29	28	19	2
5	1	1	4	4	15	2666	1632	15	60	19	Oo
5	1	1	4	4	16	2749	1649	141	28	47	ig
5	1	1	4	4	17	2841	1632	50	60	34	:
4	1	1	4	5	0	155	1652	2735	68	-1	
5	1	1	4	5	1	155	1667	34	33	92	=
5	1	1	4	5	2	475	1662	210	54	20	PSM
5	1	1	4	5	3	750	1671	73	32	23	ie
5	1	1	4	5	4	870	1673	22	41	23	a
5	1	1	4	5	5	938	1661	161	51	0	BRS
5	1	1	4	5	6	1151	1652	578	68	0	GZ,OLfS™ESEEEL
5	1	1	4	5	7	1774	1652	18	68	57	OS
5	1	1	4	5	8	1853	1656	210	56	0	PKC
5	1	1	4	5	9	2103	1661	29	39	0	S
5	1	1	4	5	10	2172	1680	98	35	0	me
5	1	1	4	5	11	2317	1652	366	68	0	>FOHGSoCs
5	1	1	4	5	12	2749	1684	4	4	60	'
5	1	1	4	5	13	2792	1681	98	27	19	2:
4	1	1	4	6	0	158	1693	2732	45	-1	
5	1	1	4	6	1	158	1695	22	43	37	z2
5	1	1	4	6	2	475	1707	71	28	21	Dt
5	1	1	4	6	3	661	1695	23	43	0	RR
5	1	1	4	6	4	750	1707	4	27	89	:
5	1	1	4	6	5	801	1695	30	43	26	oo
5	1	1	4	6	6	869	1719	23	4	40	£&
5	1	1	4	6	7	1090	1695	12	43	26	ZT
5	1	1	4	6	8	1145	1709	22	19	83	6
5	1	1	4	6	9	1286	1694	22	43	36	So
5	1	1	4	6	10	1350	1694	23	43	57	we
5	1	1	4	6	11	1414	1704	29	20	0	4
5	1	1	4	6	12	1620	1701	99	31	51	fg
5	1	1	4	6	13	1853	1708	3	26	70	:
5	1	1	4	6	14	1912	1693	12	45	7	go
5	1	1	4	6	15	1965	1693	23	45	49	Oo
5	1	1	4	6	16	2103	1702	9	4	0	Q
5	1	1	4	6	17	2242	1695	32	43	19	~~
5	1	1	4	6	18	2316	1695	12	43	0	oF
5	1	1	4	6	19	2448	1698	29	19	48	=
5	1	1	4	6	20	2585	1693	169	45	1	Yoe®
5	1	1	4	6	21	2799	1693	86	45	41	ei:
4	1	1	4	7	0	155	1711	2735	72	-1	
5	1	1	4	7	1	155	1738	35	32	0	°
5	1	1	4	7	2	402	1707	21	80	36	go
5	1	1	4	7	3	475	1707	211	80	0	 :#Peo
5	1	1	4	7	4	801	1724	91	57	13	ee
5	1	1	4	7	5	938	1717	93	57	0	aG
5	1	1	4	7	6	1077	1707	33	80	35	et
5	1	1	4	7	7	1145	1711	1745	72	0	gzeeszregst2
5	1	1	4	7	8	1862	1707	355	80	0	Besse
5	1	1	4	7	9	2249	1707	581	80	0	cocsegswmrcges
5	1	1	4	7	10	2836	1707	54	80	0	-
4	1	1	4	8	0	155	1766	2735	57	-1	
5	1	1	4	8	1	155	1774	34	41	81	o
5	1	1	4	8	2	410	1762	17	65	18	PF
5	1	1	4	8	3	475	1766	2415	57	0	isOtonweSQooOpPELEErF
5	1	1	4	8	4	1471	1762	147	65	26	Se
5	1	1	4	8	5	1618	1762	244	65	15	EoOE>~
5	1	1	4	8	6	1899	1762	126	65	0	BPE
5	1	1	4	8	7	2024	1762	55	65	0	e
5	1	1	4	8	8	2089	1762	147	65	6	FE
5	1	1	4	8	9	2240	1762	462	65	0	e=SESCSwuRee
5	1	1	4	8	10	2701	1762	190	65	58	FHS
4	1	1	4	9	0	155	1803	2735	58	-1	
5	1	1	4	9	1	155	1819	34	28	66	5
5	1	1	4	9	2	380	1810	98	48	37	2:
5	1	1	4	9	3	524	1799	230	66	5	¢g@ooF
5	1	1	4	9	4	801	1803	2089	58	0	&F$FSzerogsTFFevOX
5	1	1	4	9	5	1536	1799	138	66	0	HH
5	1	1	4	9	6	1690	1799	402	66	0	FERZEGCSS
5	1	1	4	9	7	2092	1799	138	66	76	EZ
5	1	1	4	9	8	2229	1799	177	66	58	D556
5	1	1	4	9	9	2449	1799	188	66	46	WEY
5	1	1	4	9	10	2636	1799	193	66	54	Fae
5	1	1	4	9	11	2840	1799	33	66	60	Ss
4	1	1	4	10	0	155	1839	2735	73	-1	
5	1	1	4	10	1	155	1851	34	57	46	2
5	1	1	4	10	2	411	1832	21	84	48	Ss
5	1	1	4	10	3	475	1850	279	62	0	e220
5	1	1	4	10	4	801	1839	22	51	0	s
5	1	1	4	10	5	894	1841	205	52	1	S25
5	1	1	4	10	6	1138	1844	168	68	17	50S
5	1	1	4	10	7	1352	1832	504	84	0	SLPeee5ss
5	1	1	4	10	8	1903	1845	160	45	33	ERS
5	1	1	4	10	9	2110	1839	780	73	0	RSrOoOme,UcEas
3	1	1	5	0	0	379	1881	2235	67	-1	
4	1	1	5	1	0	379	1881	2235	52	-1	
5	1	1	5	1	1	379	1888	99	30	68	Os
5	1	1	5	1	2	587	1881	555	52	36	qqg=ztrwuraondn
5	1	1	5	1	3	1276	1887	167	31	25	Det
5	1	1	5	1	4	1483	1882	649	51	10	fofkaogeras
5	1	1	5	1	5	2519	1882	26	51	77	oO
5	1	1	5	1	6	2585	1903	29	23	41	i
4	1	1	5	2	0	380	1906	2165	52	-1	
5	1	1	5	2	1	380	1926	29	15	11	-
5	1	1	5	2	2	449	1906	289	51	17	YO2ZZS>
5	1	1	5	2	3	1000	1907	26	51	76	Zz
5	1	1	5	2	4	1211	1907	14	51	51	Zz
5	1	1	5	2	5	1414	1906	31	52	45	Ly
5	1	1	5	2	6	2168	1906	26	51	46	WW
5	1	1	5	2	7	2516	1924	29	4	55	A
3	1	1	6	0	0	155	1926	2735	281	-1	
4	1	1	6	1	0	387	1931	2503	70	-1	
5	1	1	6	1	1	387	1938	367	63	0	,uwrfops
5	1	1	6	1	2	1000	1951	31	23	59	2
5	1	1	6	1	3	1207	1941	29	27	26	7
5	1	1	6	1	4	1414	1937	29	51	44	=
5	1	1	6	1	5	1827	1934	29	54	0	o
5	1	1	6	1	6	2172	1931	718	51	30	Hud
5	1	1	6	1	7	2452	1927	36	71	34	te
5	1	1	6	1	8	2499	1927	143	71	73	OP
5	1	1	6	1	9	2665	1927	36	71	0	HP
5	1	1	6	1	10	2706	1927	125	71	22	Na
4	1	1	6	2	0	167	1968	2723	51	-1	
5	1	1	6	2	1	167	1969	13	49	29	oO
5	1	1	6	2	2	396	1968	711	49	0	@®rFaoOoOtvtOorNMHLHE
5	1	1	6	2	3	1138	1968	174	49	0	NZETC
5	1	1	6	2	4	1344	1983	168	21	0	NSH
5	1	1	6	2	5	1552	1968	236	49	11	NmM+tTH
5	1	1	6	2	6	1827	1989	98	11	54	Sr
5	1	1	6	2	7	1965	1983	167	22	0	nme
5	1	1	6	2	8	2312	1969	95	50	39	Mae
5	1	1	6	2	9	2453	1969	14	50	43	GS
5	1	1	6	2	10	2654	1985	236	30	73	AAW
5	1	1	6	2	11	2841	1969	51	50	49	A
4	1	1	6	3	0	155	1995	2735	64	-1	
5	1	1	6	3	1	155	2010	34	39	90	z
5	1	1	6	3	2	380	2013	29	44	94	2
5	1	1	6	3	3	794	1995	29	56	35	ib
5	1	1	6	3	4	869	1995	15	56	53	Wo
5	1	1	6	3	5	934	1995	15	56	38	Wo
5	1	1	6	3	6	1070	1995	29	56	35	CS
5	1	1	6	3	7	1138	2008	29	29	58	©
5	1	1	6	3	8	1276	1995	98	56	55	Non
5	1	1	6	3	9	1483	2008	29	29	75	0
5	1	1	6	3	10	1552	2008	29	29	70	0
5	1	1	6	3	11	1620	2008	30	29	50	0
5	1	1	6	3	12	1689	2008	30	29	60	O
5	1	1	6	3	13	1754	1995	29	56	44	WO
5	1	1	6	3	14	1896	2008	236	29	36	BOAO
5	1	1	6	3	15	2172	2022	362	37	66	“Bere
5	1	1	6	3	16	2591	1993	299	70	0	lorrrs
4	1	1	6	4	0	161	2051	2453	43	-1	
5	1	1	6	4	1	161	2051	12	43	73	=a
5	1	1	6	4	2	380	2057	98	24	75	Fr
5	1	1	6	4	3	517	2061	100	21	70	NO
5	1	1	6	4	4	662	2051	23	43	70	tT
5	1	1	6	4	5	720	2051	22	43	56	WY
5	1	1	6	4	6	1000	2061	30	20	79	o
5	1	1	6	4	7	1207	2061	29	20	0	N
5	1	1	6	4	8	1403	2051	40	42	65	©0
5	1	1	6	4	9	1827	2061	29	20	28	o
5	1	1	6	4	10	2172	2067	29	11	36	-
5	1	1	6	4	11	2516	2067	29	11	70	-
5	1	1	6	4	12	2562	2050	52	43	24	oT
4	1	1	6	5	0	155	2089	34	27	-1	
5	1	1	6	5	1	155	2089	34	27	91	z
4	1	1	6	6	0	155	2119	34	31	-1	
5	1	1	6	6	1	155	2119	34	31	41	<
4	1	1	6	7	0	155	2152	34	23	-1	
5	1	1	6	7	1	155	2152	34	23	16	—_l
4	1	1	6	8	0	155	2181	34	26	-1	
5	1	1	6	8	1	155	2181	34	26	34	oO

Section 12

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 12 of 97

NR
 2                                                                                                                        o
 ©
 a                                                                                                                        6
 Ww                                                                                                                       N
 2                                                                                                                        s
 =                                                                                                                         5)
                                                                                                                          ®
 =                                                                                                          ©             3
 N         oo +t tO O OD                                                                                    .             a
 Tt                   a                                                                                     g
            moo                                                                                             ©
            PoP  Eo Go bob E                                                                                a

 a          PoP  Pb Gob Gd                                                                                  =
            a                                                                                               3
 O          PoP oP bob  bE                                                                                  Q
 <          PoP  Go ob ob bo                                                                                B
 oO         PoP  Eo bob EG                                                                                  8
 =          PoP  PoP  EE                                                                                    z
 -                   es                                                                                     =
ud          PoP oP Pb bo Et                                                                                 z
ul          PoP oP Go be                                                                                    5
 =          PPP obo Si                                                                                      8
 Ww         PoP op op PQ   :                                                                                z
            Poor Pl lc Gt                                                                                   2
 =          6    : bop wo:                                                                                  x
 =          PB     i  igi                                                                                   ¢
 =          Po of   Ff ig:                                                                                  5
 o          PB   opis                                                                                       s
Oo          re                                                                                              5
 E          Poo:   i                                                                                        2
 Zz         PS   5 of ig   :                                                                                £
Lu               Pot  Pou
 =          °§   ig   ia:                                                                                   &
 5         Bo    fy) 3                                                                                      2
 &         ER t seus                                                                                        g
 =         esF$ 2Boi0                                                                                       2
 >         Bae SERE                                                                                          :
 =         ”o5 E592                                                                                         S
 Ww        ttH tf Z2W0
                     Lr w                                                                                   a
 rs                  WO x
 oO                  Qo” wW                                                                                 ©
           Mm Oh ©                                                                                          2
 z2        A aA a A                                                                                         S
 za                  cor ST
 <q
 ol
 a

Section 13

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




               T
            AF
 R
D



                                                  Page 13 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        12 JUNE 2018

     Funding Deed
     BETWEEN
     Noosa Shire Council (Council)
     AND
     Noosa Biosphere Reserve Foundation Ltd (NBRF)

     1    TERM
     a)   The term of this Deed commences on 1 July 2018 and continuesguntil 30th June
          2021, or at such time as either party resolves to terminate the Deeds
     b)   Onor about 1 July 2021, Council may consider entering into@ newfunding deed to
          extend the period of funding, subject to its annual budget considerations and
           performance outcomes relative to this Deed.

     2     PROGRAM
     NBRF must carry out activities to achieve the objectstof the NBRF Gompany and the
     purposes of the Noosa Biosphere Reserve Trust (the Trust) which are for the public
     charitable purposes of protecting and enhancing the natural.environment and for contributing
     to the realisation of the aims of UNESCO’s Man and the Biosphere Program.
     a)   “The principal purposes of the Trustare:
          i)   Advancing the conservation ‘and enhancement of a significant aspect of the
               natural environment, being the natural ecosystems and biodiversity of the Noosa
               Biosphere Reserve; and
          li)  Advancing environmental research, education and information about a significant
               aspect of the natural environment, being the Noosa Biosphere Reserve.
     b)    In seeking to achieve the principal purposes of the Public Trust, the Trust may, without
          limitation:
            i)  Foster economic and human development that is environmentally and socially
                sustainable and,culturally appropriate;
            i) @Develop. and implement a management plan for the Noosa Biosphere Reserve
                that Is aligned with the UNESCO Man and the Biosphere Program and Australian
                Biosphere Réserve Management Principles’.
            iii) Monitor performance of the Noosa Biosphere Reserve and its reporting to
                UNESCO and the Noosa community.
     Note:
     In respect to the Trust purposes clauses b) ii) and iii) the development of an NBR Plan of
     Management andeporting obligations to UNESCO will be managed by Council in
     collaboration with the Foundation and other stakeholders.

      Australian Biosphere Reserve Management Principles only apply to reserves managed by the
     Federal Government and do not apply to the Noosa Biosphere Reserve.

                                                                                       Page 13 of 97

Section 14

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 14 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                             12 JUNE 2018

        3    FUNDING OPERATIONAL EXPENSES
        a)   Council will provide $140,000 (exclusive of GST) as a contribution towards operational
             expenses for the first year of this Deed (2018/19 financial year).
        b)   |The amount of funding for operational expenses for the following financial years is
             subject to negotiation for each remaining financial year of this Deed and subject to
             Clause 6 — Funding Conditions.
        c)   NBRF will provide Council with details of its funding requirements for operational
             expenses for each following year by no later than 30th March. NBRF are to provide
             such information as may be reasonably required by Council to assess the request
             including but not limited to the current NBRF strategic plan, proposed annual
             operational plan, detailed draft budget and current financialbalance sheet.
        d)   Negotiations for funding will take into account any ongoing commitments as provided
             for in clause 5.2 of this Deed and Council’s annual budget process and overall funding
             constraints.
        e)   Payments are subject to GST where applicable*having regard to: the,type of
             transaction under Australian Taxation legislation.

        4    FUNDING PROJECTS
        a)   Inthe first year of this Deed, Council will quarantine up to $125,000 of its Environment
             Levy funds for contribution to ‘NBR, projects that align with the principal purposes of
             the Trust , Council’s Environment Levy»Policy and ‘Council’s strategic direction for the
             Noosa Shire environment.
        b)   The NBRF may submit.applications for Council's Consideration for funding from the
             Environment Levys
        c)   The NBRF will(provide Council with reasonable notice of project funding requirements
             and provide<sufficient information about the projects to allow Council to assess the
             application for funding.
        d)   The NBRE.shall not proceed with any project requiring Environment Levy funding until
             Council formally. notifies NBRF in writing of the outcome of Council's consideration of
             project funding applications,
        e)   “For the remaining financial years under this Deed, the NBRF will need to lodge
             applications with Council for projects to be funded from the Environment Levy. Such
             applications will be assessed against other applications received and in consideration
             of the totalamount allocated towards grants projects from the Environment Levy.
       f)    NBRF may also choose to apply for relevant grants under Council's range of grant
             programs. Again, these will be assessed against other applications received and the
             total amount allocated to the relevant grants program.

        5    PAYMENTS
        5.1   How payments are to be made
        a)   Council shall pay the funding to NBRF by electronic transfer to a bank account (or
             accounts) as notified in writing to Council by NBRF, with such bank account/s being in
             the name of NBRF and such account/s being solely under the control of NBRF.

        Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council               Page 5

                                                                                            Page 14 of 97

Section 15

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 15 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                               12 JUNE 2018

      b)   Payments for contribution to operational      expenses will   be made in quarterly
           instalments in advance upon a receipt of a valid tax invoice from NBRF dated on or
           after the first day of the quarter.
      c)   Payments for any project funding will be made upon receipt of a valid tax invoice from
           NBRF after notification by Council that the funding has been approved.
      5.2   Extended financial commitments
      Before NBRF commits to any purchase, contract, undertaking or activity that has financial
      commitments beyond the period of approved funding and for which purchase, contract,
      undertaking or activity NBRF will require Council funding, NBRF must apply for and obtain
      approval from Council prior to NBRF making the commitment.
      5.3   Right to suspend funding
      Without limiting the Council’s rights, if Council is satisfied:
      a)   |NBRF does not have the capacity to manage thedunding; or
      b)   |NBRF does not have the capacity to performethe programs in lineywith the objects of
           the Trust; or
      c)   Council is unable to provide the funding due to any legal impediment,
      then the Council may at its sole discretion:
      d)   Suspend payment of the funding or an instalment of the funding (whether in whole or
           in part) of the NBRF program; and/or
      e)   Direct NBFR to cease spending the Funding.

      6    FUNDING CONDITIONS.
      In return for receiving Funding from,the Council, NBRF must'undertake appropriate planning,
      maintain appropriaté processes\ and procedures and undertake performance reporting
      including:
      6.1  General requirements
      a)   Develop and regularly review a 3-5 year strategic plan outlining the goals and
           objectives for the Foundation to achieve the purposes of the Trust.
      b)   “Develop an annual Operational Plan setting out the priority actions for the next
           financial year in order to achieve the goals and objectives of the strategic plan.
      c)   Before 30" March 2019, NBRF is to provide details of changes instituted by the
           Foundation, to improve its governance model, transparency around its operations,
           reporting to the community and fund-raising effectiveness. In the event that Council is
           satisfied that reasonable    steps  have   been  taken   to address   these  matters,
           consideration will be given to further funding for operational expenses for the
           remaining financial years under this Deed.
      d)   Establish, review and maintain suitable criteria, guidelines, assessment rationale and
           processes for disbursement and acquittal of funds for eligible entities to undertake
           projects that meet the purposes of the Trust.
      e)   Ensure the funding is directed to the purposes for which it is assigned by Council
           (specifically operational activities or projects).
     f)    Ensure the Company or entities granted funding to do work or activities in line with the
           purposes of the Trust obtain approvals to do work or conduct other activities on

      Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council               Page 6

                                                                                              Page 15 of 97

Section 16

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 16 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                             12 JUNE 2018

           Council owned or managed lands or as required under State or Federal legislation
           prior to work or the activity commencing.
     g)    Provide recognition of Council funding support in written material, advertising, media,
           signage and reporting documents.
     6.2   Performance reporting
     NBRF must monitor the NBRF program activities and submit written reports to meet
     Council’s acquittal requirements including but not limited to:
     a)    Provide a quarterly progress report against utilisation of the funding towards the NBRF
           program for the financial year and specifically information related to each project, their
           status and milestones achieved.
     b)    Provide an Annual Report for each financial year and submit it to Council no later than
           30 November each year or within 30 days of the Annual General Meeting whichever is
           the sooner.   The Annual Report to include evidence that, the funding is being
           successfully applied to the objects of the Company and the purposes of the Trust and
           particularly to delivery of projects funded by any Council contribution as well as
           performance against the key performancegindicators contained in“Scehedule 1 to this
           Deed.
     C)    Provide an audited financial report for each financial’year and submit it to Council no
           later than 30 November each year, or within. 30,days of the Annual General Meeting
          whichever is the sooner.    Theaudited financial report is to identify the use of the
           funding provided by Council for the \NBRF program),   NBRF must maintain financial
           records  in accordance with    ‘legislativés.requirements that identify receipt and
           expenditure of the funding for the NBRF so that,at all times the funding for the NBRF
           program is identifiable.and ascertainable.
     d)    ‘If required by Council, provide ad-hoe reports within 30 days of such request, or such
           lesser period, setting out:
            i)  Any significant developments in or concerning the NBRF program;
            ii) Any significantidelays or difficulties.encountered in performing the NBRF program
                iN accordance with this Deed: and
     e)    NBRF must permit the Council or its agent or representative to have access to NBRF’s
           records relating to funding provided by Council and must cooperate with any audit or
           information request carried out or requested by Council.
    f)     For<avoidance of doubt, the above paragraphs survive the expiration or earlier
           termination of this Deed, except for paragraph d).

     7     MANAGEMENT OF FUNDING
     7.1.  Use of funding
     a)    |NBRF must only expend the funding:
           i)   For undertaking the NBRF program and purposes that are necessarily related to
                the program, for which the funding was provided; and
           ii)  Otherwise in accordance with the terms and conditions of this Deed.
     b)    |NBRF must not use the funding, any interest acquired with the funds, any assets or the
           existence of this Deed as any form of security for any purpose, unless the Council has
           given its prior written approval.

     Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council               Page 7

                                                                                            Page 16 of 97

Section 17

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 17 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                               12 JUNE 2018

   7.2   Repayment of funding
   a)    If NBRF fails to remedy a failure to comply with this Deed in a substantial respect
         within 30 days, or such longer period as the Council stipulates, after receiving notice
         requiring it to do so, NBRF is liable, on demand from Council to repay to the Council
         the whole of the funding provided for the NBRF program (or the amount of Funding
         paid as the case may be) for any year in which the failure to comply or the failure to
         remedy occurred;
   b)    If NBRF fails to fulfil a term of this Deed, or part of it, on the NBRF program, NBRF is,
         subject to paragraph d) of this clause, liable to repay to the Council the amount of
         unspent money and the Council may recover that money from NBRF as a debt due to
         the Council; and
   c)    If NBRF fails to spend the funding, or part of it, on the NBRF program, NBRF is,
         subject to paragraph d) of this clause, liable to repay to the Council the amount of
         unspent money and the Council may recover that money from,.NBRF as a debt due to
         the Council.
   d)    if, at the end of the Term, some of the funding has not been spent or committed to
         legitimate contingency and reserves, thata@amount must be repaid to the Council (and
         the amount may be recovered as a debt due to the,Council), unless,the Council
         provides written permission for all, or some,sof the amount to be spent in some other
         manner that Council directs.

   8     INTELLECTUAL PROPERTY
   8.1   Intellectual property in council material
   a)    The Council will retain ownership of all Council Material)including Intellectual Property
         in that Council Material, but grants NBRF a royalty-free world wide, non-exclusive
         licence, (including a right of Sub-licence to\a third party), to use, reproduce, adapt and
         exploit the Council Materialon the condition,that this licence is only granted for the
         purposes of this Deed.
   b)    The,aboveimentioned licence may be terminated by the Council immediately upon
         written notice onthe occurrence of any of the following events:
        i)     The Trust or NBRF becomes insolvent, subject to administration, unable to meet
               its debts or the\NBRF decides to wind up the Trust or itself    for any reason
               whatsoever; or
         ii) | The@ Council forms the reasonable view that either the Trust or the NBRF is
               insolvent; or
         iii) | The Council forms the reasonable view that either the Trust or the NBRF is in
               breach of the terms of the trust deed which created the Trust where that breach
               is not, in the opinion of the Council, capable of remedy; or
         iv)   The Council forms the reasonable view that the NBRF is in breach of any
               provision of its own constitution or any provision of this Deed where that breach
               is not, in the opinion of the Council, capable of remedy.
   c) The Council may also terminate the above mentioned licence on the occurrence of any
       of the following events:
        a.     The Council forms the reasonable view that either the Trust or the NBRF is in
               breach of the terms of the trust deed which created the Trust where such breach
               is capable of remedy and NBRF fails to remedy that breach within thirty (30)

   Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council                Page 8

                                                                                              Page 17 of 97

Section 18

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 18 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                            12 JUNE 2018

                 days, or such longer period as Council stipulates, after receiving notice from the
                 Council requiring it to do so; or
           b.    |The Council forms the reasonable view that the NBRF is in breach of any
                 provision of its own constitution or any provision of this Deed where that breach
                 is capable of remedy and NBRF fails to remedy that breach within thirty (30)
                 days, or such longer period as Council stipulates, after receiving notice from the
                 Council requiring it to do so.
     d)    Council may, pursuant to the above licence, authorise the use of any Council Logo by
           the NBRF in such manner and subject to such conditions as the Council deems
           appropriate in its absolute discretion subject to it retaining full ownership of the Council
           Logo. NBRF agrees that any Council Logo is not to be usedinless expressly
           approved in advance and in writing by the Council.
     e) | Upon the conclusion of the term of this Deed or an earlier termination of this Deed,
           NBRF will not retain any Council Material remaininggn NBRE’s,possession and will
           immediately return all physical expressions of the,Council Material to the Council and
           will destroy any electronic copies thereof, unless the Council notifies NBRF otherwise
           in writing.
     f)    NBRF agrees to keep safely Council Material provided to NBRF for the purposes of
           this Deed and to abide by any obligations ‘of privacy and confidentiality towhich
           Council may be bound in law.
     g)    Any adaptations, variations or extensions made to the Council Material during the term
           of the above mentioned licence‘or anyisub-licence ‘shall become, upon its creation, the
           property (including Intellectual Property) ofithe Council.
     8.2   Obligations on NBRE
     a)    NBRF will immediately do all such things, take such-reasonable steps, execute any
           documents and follow such reasonable directions as the Council from time to time
           reasonably requests in order to perfect, record or preserve the Intellectual Property in
           the Council Material and this..will include, but is not limited to, including such
           conditions, limitations or restrictions inpany‘sub-licences granted by NBRF pursuant to
           this Déed that the Council deems reasonably necessary to perfect, record or preserve
           the Intellectual Property inthe Council Material.
     b) « The Council shall have the right to take action against any third parties to prosecute or
           defend legal proceedings including proceedings for an infringement of the Intellectual
           Property in the Council Material. If the NBRF becomes aware of any infringement or
           suspected infringement it will promptly inform the Council and will provide all
           reasonahleyassistance (excluding financial contribution to such proceedings) in any
           legal proceedings or the defence or prosecution of the Intellectual Property.
     c)    Unless otherwise expressly exempted in writing by the Council, the NBRF will ensure
           that any licensed use of the Trade Mark in any context shall appear with the symbol ®.
           In the event that the Council decides to lodge a certification mark application in relation
           to the Trade Mark, the NBRF will provide all reasonably requested documentary and
           other support necessary to support that application including the provision by the
           NBRF of financial support of that application to the extent that the parties may mutually
           agree. In the event that registered certification mark status is granted for the
           expression “Noosa Biosphere”, the expression “Trade Mark” as it appears in this Deed
           shall also include a reference to that certification mark and the Deed shall be
           interpreted accordingly.

     Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council                Page 9

                                                                                            Page 18 of 97

Section 19

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 19 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                              12 JUNE 2018

       d)   Unless otherwise expressly exempted in writing by the Council, the NBRF will not
            grant a third party sub-licence with a fixed term of greater than 3 years but may grant
            an option or options to extend that term subject to the provisions of clause 8.2 f) iii.
       e)   The NBRF hereby acknowledges that the Council Material is the Intellectual Property
            of the Council and shall act only in good faith when dealing with the Council Material in
            order to best preserve the Council’s Intellectual Property.
      f)    The NBRF agrees that it will procure every sub-licence of the Council Material that it
            grants pursuant to the Deed, unless it has received an express written exemption from
            the Council to do otherwise, to include in those sub-licences the following:
            i)    An acknowledgement that the Intellectual Property in, the Council Material is
                  owned by the Council and that the sub-licensing .of the Council Material is
                  provided with the consent of the Council according,4o this Deed;
            ii)   The Trade Mark, wherever used by a third party sub-licensee must appear with
                  the expression ® unless expressly advised otherwise in writing by the Council;
            iii) | Any licence granted by NBRF which grants the third party’sub-licensee an option
                  or options to extend the term ofthe’ sub-licence must be stated to be
                  unenforceable and invalid if the Couneil’s licence of its Intellectual Property in the
                  Council Material to NBRF has been terminated fof any reason prior to the proper
                  exercise of that option by the third party sub-licensee; and
            iv)   Any other condition, limitation or restriction on the third party sub-licence that the
                  Council deems reasonably nécessary to include in such a sub-licence to perfect,
                  restore or preserve its Intellectual Property in the Council Material.
       g)   In order to ensure the application of the above.provisions, NBRF will provide to the
            Council copies of anysproposed sub-licenses to third,parties granted pursuant to this
            Deed in advance of execution for the Cotneil’s approval, unless the Council expressly
            advises in writing otherwise.
       8.3   Intellectual property in NBRF program material
       a) Subject to this clause intellectual Propenty. in NBRF Program Material vests immediately
          in NBRFY
       b) NBRF grants to the Council a permanent, irrevocable, royalty-free, worldwide, non-
          exclusive licence (including aright of sub-licence) to use, reproduce, communicate,
          adapband exploit the Intellectual Property in the NBRF Program Material.
       8.4   Dealing with intellectual property
       NBRF warrants that it is/entitled, or will be entitled at the relevant time, to deal with the
       Intellectual Property, in’ both the Council Material and the NBRF Program Material in
       accordance with this clause 8.
       8.5   Consent to specified acts
       NBRF agrees:
       a) To obtain from each author of any NBRF Program Material a written consent to the
          Specified Acts (whether occurring before or after the consent is given) which extends
          directly or indirectly to the performance of the Specified Acts by the Council or any
          person claiming under or through the Council;
       b) To obtain from each author of any NBRF Program Material a written consent to the
          Specified Acts (whether occurring before or after the consent is given) which extends

       Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council               Page 10

                                                                                             Page 19 of 97

Section 20

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 20 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                           12 JUNE 2018

        directly or indirectly for the Council’s benefit in relation to the Council’s licensed use of
        such material; and
     c) Upon request, to provide the executed original of each such consent to the Council.
     d) In this clause, “Specified Acts” means any of the following classes or types of acts or
        omissions by or on behalf of the Council, excluding false attribution of authorship:
          i)    Using, reproducing, adapting or exploiting all or any part of the NBRF Program
                Material, with or without attribution of authorship, and
          ii)   Supplementing the NBRF Program Material with any other material; or
          iii)  Using the NBRF Program Material in a different context to that originally
                envisaged.

     9    INDEMNITY
     9.1  General indemnity
     NBRF indemnifies (and agrees to keep indemnified) the Council against any:
        a) Cost or liability incurred by the Council;
        b) Loss of or damage to property of the Council; or
        c)  Loss or expense incurred by the Council in‘dealing with any claim against it, including
            legal costs and expenses on_a,solicitor/own client basis and the cost of time spent,
            resources used, or disbursements paid by the Couneil;
        Arising from:
        d) Any act or omission by NBRF or‘NBRF’s_ officerspagents, employees, contractors or
            advisers (whethervoluntary or paid) where there 'was)fault on the part of the person
            whose conductgave rise‘to that costs, liability, loss, damage or expense;
        e) Any breach.of NBRF of the Deed; or
        f)  The use by Council of the material created for the purpose of this Deed, including
            any claims by‘third parties aboutsthe ownership or right to use intellectual property or
            Moral Rights.
     9.2  Reduction of scope
     NBRF’s liability to indemnify the Council under this clause will be reduced proportionally to
     the extentthat any act or omission involving fault on the part of the Council contributed to the
     relevant cost, liability, loss, damage or expense.
     9.3. Preservation of other rights
     The right of the.Council to be indemnified under this clause is in addition to, and not
     exclusive of, any other right, power or remedy provided by law, but the Council is not entitled
     to be compensated in excess of the amount of the relevant cost, liability, loss, damage or
     expense.
     9.4  Meaning of “fault”
     In clause 9, fault means any negligent or wrongful act or omission or wilful conduct.

     Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council               Page 11

                                                                                           Page 20 of 97

Section 21

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 21 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                           12 JUNE 2018

    10    TERMINATION FOR FAULT
    10.1 Right to terminate for default
    In addition to the right to terminate provided for elsewhere in this Deed, the Council may
    terminate this Deed with immediate effect by giving notice to NBRF if:
        a) NBFR breaches any provision of this Deed and fails to remedy the breach within 30
           days, or such longer period as Council stipulates, after receiving notice requiring it to
           do so;
        b) NBFR breaches a material provision of this Deed and that breach is not, in the
           opinion of the Council, capable of remedy;
        c) NBFR notifies the Council that the NBFR program is not to proceed; or
        d) NBFR becomes insolvent, subject to administration, unable to meet its debts, or
           decides to wind up itself or the Trust.
    10.2 Obligation upon termination
    On receipt of a notice of termination or reduction of thé Funding, NBRE must:
    a) Stop or reduce the performance of NBFR‘S obligations related ‘to tthe Funding as
        specified in the notice;
        a) Take all available steps to minimise loss resulting from the termination‘or reduction;
        b) Continue work on any part of the NBRF program not affected by the notice; and
        c) Immediately return to Council any Funding relating to the part of the NBRF program
           affected by the notice and that has_not in the Council’s opinion:
               i)  Been spent in accordance with the Deed; or
               ii) Been committed by NBRF\in accordance with the Deed and is payable as a
                   current liability,
           Or otherwise dealewith any, Funding held‘by NBRF-as directed by the Council.
    10.3 Council’s liability upon termination for default
    Where Council terminates this Deed under clause.10, the Council:
    a) Will be liable only for payments due andowing to NBRF under the payment provisions of
        the Deed as atythe date of the notice; and
    b) Wille entitledto recover from NBRF:
            i) Any part of theyFunding which has not been legally committed for expenditure by
               NBRF in accordance with>the Deed and is not payable for NBRF as a current
               liability by the date of the notice of termination is received; or
            ii) Any xpart of the Funding which has not, in the Council’s opinion, been spent by
               NBRPain accordance with the Deed; and
            iii) Where NBRF becomes liable to repay the Funds to the Council under paragraph
               6.2 a).
    10.4 Preservation of other rights
    Clause 10 does not limit or exclude any of the Council’s rights under this Deed.

    11.   DISPUTE RESOLUTION AND MEDIATION
    Both parties shall make genuine efforts to resolve any dispute arising out of, or in connection
    with this Deed by negotiation and discussion. If the parties are unable to resolve a dispute
    within 14 days, then the dispute shall be referred to an agreed, qualified independent person
    to mediate between both parties.     In the event the parties are unable to agree on the

    Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council               Page 12

                                                                                          Page 21 of 97

Section 22

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 22 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                            12 JUNE 2018

      independent person, either party may refer this matter to the President of the Queensland
      Law Society to nominate an appropriate person.

      12.   GENERAL PROVISIONS
      12.1 Audit and access
      e) NBRF agrees to give Council, or any persons authorised in writing by the Council,
          access to the premises where obligations under this Deed are being carried out.
      f)  NBRF agrees to permit those persons to inspect and take copies of any material relevant
          to this Deed.
      12.2 Insurance
      a) NBRF agrees:
                 i) To effect and maintain adequate liability insurances specific to the operation
                    of a Company, as a minimum publie’ liability, productand director & officer
                    liability, volunteers and employee work cover.
                 ii) On request to provide proof _of insurance acceptable to Council for its
                    purposes under the Deed.
      b) This clause continues in operation for so long as any obligations remain in connection
          with this Deed.
      12.3 Relationship of parties
          a) NBRF is not by virtue of this Deed an-officer, employee, partner or agent of the
             Council, nor does NBRF have ‘any power or authority to bind or represent the
             Council.
          b) NBRF agrees:
                 i) Notto misrepresent its relationship,with Council; and
                 ii) Not to‘engage in any misleading or deceptive conduct in relation to the NBRF
                    program.
      12.4 Waiver
          a) A failure or delay by a party\to exercise any right or remedy it holds under this Deed
             Onat law does not‘operate as @ waiver of that right.
          b) A single or partial exercise by a party of any right or remedy it holds under this Deed
             or at lawgdoes not prevent the party from exercising the right again or to the extent it
             has not fully.exercised the right.
      12.5 Assignment
      NBRF cannot assign its obligations, and agreed not to assign its rights, under this Deed
      without the Council’s prior written approval.
      12.6 Applicable law and jurisdiction
          a) This Deed is to be construed in accordance with, and any matter related to it is to be
             governed by, the law of Queensland.
          b) The parties submit to the jurisdiction of the courts of that State.

      Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council              Page 13

                                                                                           Page 22 of 97

Section 23

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 23 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       12 JUNE 2018

      12.7 Survival
      All of the provisions of clause 8 of this Deed shall survive the termination of this Deed.
      12.8 Amendments
      This Deed can only be amended by an instrument in writing signed by both parties.

      Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council          Page 14

                                                                                       Page 23 of 97

Section 24

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 24 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                           12 JUNE 2018

            ETON Sn i
     Annual Report         | Means a report in the form of an annual financial report and a
                            directors report as mentioned in the Corporations Act 2001 (whether |
                            or not it is required to be prepared under that Act) that without
                           _ limitation includes audited financial statements, achievements against -
                           _ key performance measures and other activities included in the annual |
                           | operational plan underpinning the objects of the Company and the |
                           _ Trust
     | Asset               | Means any asset or improvement acquired or produced wholly or |
                           partly by the Funding OR Funds
      Council              | Means the local government exercising powers vested under the |
                           Local Government Act 2009 andgincludes the area within the
                           boundaries of Council’s authority as preseribed under the Local
                           _ Government Act.                                                     !
      Council Logo         ! Means any indicia, logos, emblems, symbols or the like which are !
                           _used by the Council to brand and identify itself in its)\day to day
                            activities.
      Council Material     ! Means any material, including ‘without limitation, any software, code, !
                            designs,   photographs,   drawings,   music,   film, print,  layouts,
                           documents, scripts, Copyp logos andyany other materials in any
                           _ medium, whether inhard or electronic form. provided by the Council to -
                           | NBReto further ‘the purposes and objectives of the Trust and.
                           _ includes, without limiting the generality of the forgoing, any material
                           ‘which incorporates the expression “Noosa Biosphere” and “Noosa.
                            Biosphere | Reserve” ‘of, any deceptively or substantially similar
                            expressions, or colourable, imitations thereof, and also includes the -
                           “Trade Mark and the;Bomain Names.
     : DomaingNames        | Means jthe following domain names registered in the name of the !
                            Council:
                           ! noosabiospheresnet.au;                                              !
                           | noosabiospherereserve.org.au;                                       |
                           | noosabiospherereserve.net.au;                                       |
                           | noéosabiospherereserve.com.au;                                      |
                           | noosabiospherereserve.net;
                           ! noosabiospherereserve.info;                                         !
                           | noosabiosphere.org.au                                               |
                           _and any other future domain names, URLs, webpages or any other
                           _ examples of social or digital media Intellectual Property incorporating _
                           _ the expression “Noosa Biosphere” which may be or are used by the
                           _NBRF for the purposes and objectives of the Trust.
      Funding or funds     | Means the amount paid or payable under this Deed                    |

      Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council              Page 15

                                                                                          Page 24 of 97

Section 25

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 25 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                            12 JUNE 2018

      GST                    Means the Goods and Services tax
     | Intellectual        | Means copyright, trademarks, designs, patents, semi-conductor or,
     _ Property              Circuit layout rights, trade secrets, trade names, business names, |
                           _ company names, domain names and all other proprietary rights and |
                           : any rights to registration of such rights, whether created on, before or |
                           _ after the date of this Deed.                                         |
      NBRF                   Means Noosa Biosphere Reserve Foundation Ltd an Australian
                           _ Company (limited by guarantee) registered on 13" January 2015 -
                           _ ACN 603 666 299
     ! NBRF Program        ! Means any material, including without limitation, any software, code, !
     _ Material            designs,    photographs,    drawings,   music,  film,  print, layouts, |
                           _ documents, scripts, copy, logos@and anyother materials in any
                           _ medium, whether in hard or electronic form created by, or provided |
                           : to, the NBRF to further the purposes and objectives of the Trust but .
                             expressly excludes any Couneil Material.
     ! Noosa Biosphere     ! Means the Noosa Biosphere Reserve? as designated ~ under the
     | Reserve             _ UNESCO Man and the Biosphere Program as may be varied from |
                           _ time to time
     | Noosa         Shire | Means the local govermament exercising powers vested under the |
     | Council             _ Local Government Act 2009 and“intludes the area within the |
                           _ boundaries of Council’s authority as “prescribed under the Local
                           | Government Act.
     i Operational Plan    i Means an\ annual plan, for the conduct of the operations of the
                             Foundation   during  a‘ financial year  that  is  aligned  with  the.
                           _ Foundation’s»Sirategic Plan,
     ! Operational         ! Means funds required-to cover the day to day operations of NBRF !
     | Expenses            such “assemployee payments, accounting expenses, licence fees, |
                           “Maintenance and repairs, advertising, supplies, legal costs, utilities, |
                           _ insurance, and, office expenses.
     ! Project             ! Means,\an individual or collaborative activity that is carefully planned !
                           _ to achieve a particular outcome and with specific start and end dates, |
                             and may comprise multiple stages.
     i Property            i Means any legal or equitable estate or interest (whether present or i
                           _ future and whether vested or contingent) in real or personal Property |
                           _ of any description.
     ! the Trust           ! Means the Noosa Biosphere Reserve Trust registered as a public !
                             charity for taxation and deductible gift recipient status.
     : Trade Mark          : Means the registered Trade Mark “Noosa Biosphere” No. 1094948 :
                           _ under the Trade Marks Act 1995.

      Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council               Page 16

                                                                                           Page 25 of 97

Section 26

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 26 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   12 JUNE 2018

   | UNESCO            | Means the United Nations Educational, Scientific and Cultural !
                       Organisation
   ! UNESCO Man and ! Means the intergovernmental scientific program under the name |
   _ the    Biosphere   “Man and the Biosphere Program” that is facilitated by UNESCO.
   _ Program

    Funding Deed — Noosa Biosphere Reserve Foundation Ltd & Noosa Council     Page 17

                                                                                  Page 26 of 97

Section 27

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




               T
            AF
 R
D



                                                  Page 27 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       12 JUNE 2018

     14   SCHEDULE 1 —- PERFORMANCE INDICATORS

     FINANCIAL

     1. Project Funding      Leveraging achieved from Council       3:1 per year
                             Funding to NBRF
                             Calculated as total value of funded
                             projects : Council approved project
                             funding
     2. Fundraising          Growth in Donations (Deductible Gift | 20% pe     a
                             Recipient)|ncrease in value of donations | incre
                             annually                               mii    n
                                                                    :   00

     3. Operations           Percentage of projects comp    Ol      75% per year
                             within target timeframe
                             No. of projects delivered on
                             no. of projects                   y |
     4. Improvement in NBR | Percentage of funded projects wi   > 75% per year
    protection               positive result        natural
                             ecosystem, bio
                             sustainable develop
                             No. of projects wit sitive’ res  G
                             no      ojects
                            4
     5. Communication of       ange of  methods o:  mmunication | Multiple
     information             utilised and estimated  audience reach | methods &
                         - Descrip            ommunications/        audiences
                             info    on use

                                                                                      Page 27 of 97

Section 28

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




               T
            AF
 R
D



                                                  Page 28 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              12 JUNE 2018

      15   EXECUTION
      Executed as a DEED on the     day of          2018.
      SIGNED SEALED AND DELIVERED BY Brett de Chastel as Chief Executive Officer for and
      on behalf of NOOSA SHIRE COUNCIL.

      Name: Brett de Chastel            Position: Chief Executive Officer

      Signature:                        Witness:

      SIGNED BY NOOSA BIOSPHERE RESERVE FOUNDATION              AC       66 299

      Director Name:

      Signature:

      Director or Company
      Secretary Name:

      Signature:

                                                                              Page 28 of 97

Section 29

Page 29 of 97

SUMMARY — NOOSA BIOSPHERE RESERVE PUBLIC TRUST - PROJECTS (2015 TO MAY 2018)                                                                                                                                Attachment 2.

 Project Title          Description                                                             Proponent/s                          Total          NBRF           Other Contrib.     Targetdate      Status (May
                                                                                                                                      Value        Contrib.        (ram     ma        completion '    2018)
                                                                                                                                                                   kind)
 Koala Forever Noosa | Aimed at securing the future of wild koalas and wild koala eco-tourism in University of Sunshine Coast         $130,000     $40,000         $90,000            Dec 2019        Commenced
                        the Noosa Biosphere Reserve.
                                                                                               Key partners:
                        Specific objectives of the project are to establish:                   World for Wildlife Fund
                        e   Whether existing vegetation corridors are being utilised by koalas Noosa Parks Association
                        e   Key connected koala populations suitable for long-term non-invasive
                            monitoring and management
                        e   Key locations for restoring koala and vegetation connectivity
                        e   Key locations for sustainable wild koala eco-tourism and recreation
                        e   Aninitial blueprint for sustainable wild koala eco-tourism and
                            recreation
 Rural Enterprise       The key objectives of the project are to develop a better understanding of | Country Noosa                    $159,000     $65,000         $94,000            March 2019      Milestone 1
Plan                    rural activities in the Noosa Shire and to provide existing and potential                                                                                                     achieved
                        landowners with a prospectus of a range of farm-based opportunities with
                        related revenue for their property. This will include a wide variety of
                        activities ranging from primary production, carbon credits, through to food
                        tourism and accommodation.

                        Stage 1: Understanding and mapping existing land use, management,
                        and   current/future capacity  of  food   production  and   economic
                        development.
                        Stage 2: Developing rural enterprise strategies

 Community              2026 by identifying
 Roadmap
 Pandanus               The project aims to halt the widespread cases of Pandanus dieback | Peregian Beach Community                  $70,000       $20,000        $50,000            June 2018       Underway
 Preservation           caused by leaf hopper Jamelia australiae, using proven biological control | Association
                        and mitigation methods.   The work will also contribute to research in
                        respect to this issue.
 Hinterland Trail       Develop a Master Plan (and implementation plan) to identify ways to raise | Tourism Noosa                    $50,220        $19,500        $30,720            Oct 2018        Underway
 Master Plan            the profile of our biosphere reserve and enhance the experience for
                        bushwalkers and mountain bikers.                                       Key Partners:
                                                                                                Noosa & District Landcare
                        It will identify economic benefits for the community such as funding    Noosa Council (Economic
                        models, sustainable jobs, tourism, trail markings and educational      Development)
                        information

                        The plan also aims to improve biodiversity management within the trail
                        areas.

 Bush tucker garden | The Sunshine Beach State School will extend the boundaries of its        Sunshine Beach State Primary School | $2,500                                           June 2018       Underway
 & outdoor learning     existing permaculture garden to establish a native bush tucker garden and | Parents & Citizens Association
 classroom              revitalise the outdoor learning space. Learning & education
 Cultural Learning      Work to create a data bank of environmentally and culturally significant Marine Ecology Education Indigenous | $30,500      $19,500        $11,000            May 2019        Just Started
Trail                   indigenous landmarks and iconic species within the Noosa Shire         Corporation ICN

                                                                                                                                                                                                   Page 29 of 97

Section 30

Page 30 of 97

Project Title         Description                                                             Proponent/s                           Total          s)he         Other Contrib.      Targetdate      Status (May
                                                                                                                                    Value        Contrib.       (cash &in           completion‘     2018)
                                                                                                                                                                 kind)
Bring back the fish    Aimed at developing a base line assessment and restoring fish          Noosa Parks Association               $1,474,804° | $441,304      $1,033,500          November        Test oyster
(Multi-year project)   abundance through installation of oyster reefs.                        The Thomas Foundation                                                                 2022            reefs installed
                                                                                                                                                                                                    and being
                                                                                              Key partners:                                                                                         monitored.
                                                                                              University of Sunshine Coast &
                                                                                              University of Queensland                                                                              Base line survey
                                                                                                                                                                                                    underwa
Keep on Keeping It     Stage 2 will prioritise and implement strategic on-ground works to protect | Noosa & District Landcare       $272,030      $123,700      $148,330            June 2019       Underway
in Kin Kin (Phase 2)   and repair erosion prone areas and management of invasive weeds.
                       These areas were identified in Phase 1 by satellite analysis which
                       identified 2.4 million cubic tones of soil have been moved in recent years.
                       The project will also build capacity & awareness of the problem through
                       community engagement activities.
Keeping it in Kin Kin | Part 1 —LIDAR survey & scientific analysis;                           Noosa & District Landcare             $172,162      $74,212       $97,950             Jan 2018        Phase 1 —
(Phase 1)              Part 2 — On ground activities including planting at priority erosion prone                                                                                                   completed.
                       sites and management of invasive weeds.
                       Part 3 - Includes education sessions with landowners & community.
Mapping koala          Produce the first field based fine-scale distribution and population health University of Sunshine Coast     $259,500      $59,500       $200,000            March 2018      Completed.
health                 study of koalas across the Noosa Biosphere Reserve. The study is aimed
                       at identifying the distribution and health status of koalas, priority areas of
                       habitat rehabilitation, offsets, protection and land acquisition to protect
                       core koala habitat.

Biosphere                                                                                     Association
Botanical Field        Education resource — Sedges, Rushes & Restiads of the Noosa River      Noosa Integrated Catchment            $54,900       $14,900      $40,000              Feb 2017        Completed.
Guide (education       Biosphere and surrounding regions.                                     Association
resource
                                                                                                                        rd cia cho                             ie

‘Where project has been completed, the target date is the actual date of completion.
? Amount is actual — NBRF have rounded this amount of to $1,474,800
> Amount is actual — NBRF have rounded this amount off to $172,150

                                                                                                                                                                                               Page 30 of 97

Section 31

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                   12 JUNE 2018



2                        MCU18/0040 - DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF USE FOR
                         ENTERTAINMENT AND DINING BUSINESS TYPE 1 FOOD AND BEVERAGE AT THE
                         BEACH CHALETS 11/1 TINGIRA CRES, SUNRISE BEACH
DOCUMENT INFORM AT ION




Author                           Development Planner, Glen Conforti
                                 Environment and Sustainable Development Department

Index                            ECM / Application / MCU18/0040

Attachments                      Nil

         APPLICATION DETAILS

         Applicant                           Yu-Hsi Pai

         Proposal                            Material Change of Use - Entertainment & Dining Business - Type 1
                                             Food & Beverages

         Properly Made Date                  13 March 2018

         Information Request Date            N/A

         Information Response Date           N/A

         Decision Due Date                   26 June 2018

         Number of Submissions               Nil



         PROPERTY DETAILS

         Property Address                    11/1 Tingira Cres Sunrise Beach Qld 4567

         RP Description                      Lot 11 SP 112633

         Land Area                           56m²

         Existing Use of Land                Multiple dwelling complex and café



         STATUTORY DETAILS

         SEQRP Designation                   Urban footprint

         Locality                            Eastern Beaches

         Zone                                Attached housing

         Overlays                            Natural Hazards Overlay – Landslide hazard area

         Assessment Type                     Impact




                                                                                                  Page 31 of 97

Section 32

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     12 JUNE 2018


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 12 June 2018 regarding Application No. MCU18/0040 for a
Development Permit for Material Change of Use - Entertainment & Dining Business - Type 1
Food & Beverage situated at 11/1 Tingira Cres, Sunrise Beach and:
A.   Approve the application in accordance with the following conditions:
           When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
           prior to the use commencing, and then compliance maintained at all times while the
           use continues.
           Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply
           with the approved plans of development. The approved plan is listed in the following
           table unless otherwise amended by these conditions.

            Plan No.    Rev.    Plan/Document Name                                 Date

            A.03        C       Proposed Floor Plan, prepared by Zest Building     14/08/2017
                                Design

           Nature and Extent of Approved Use
     3.    The approved use must not operate outside the hours of 6am to 3pm, 7 days per
           week.
     4.    The approved total use area excluding kitchen and food storage areas is 36m²
           including any outdoor dining area.
           Amenity
     5.    The Entertainment and Dining Business Type 1 – Food & Beverages (Restaurant)
           must be undertaken and operated in a manner that causes no detrimental effect upon
           the amenity of the surrounding properties. In this regard, where a complaint (other
           than a frivolous or vexatious complaint) is made to Council about noise from the
           approved use areas, Council may require the operator or site management entity to
           have a suitably qualified acoustic consultant undertake a Noise Impact Assessment
           (NIA) in accordance with the Environmental Protection (Noise) Policy 2008. The NIA
           report must be submitted to Council for endorsement which outlines the findings and
           recommendations of the NIA and the recommendations implemented.
B.   Find the following are sufficient grounds to justify the decision despite the conflict with the
     Planning Scheme:
     1.    The Entertainment and dining use is catering for residents and visitors to the beach
           side location without any adverse impacts on surrounding amenity.
     2.    The food and beverage use is a good reuse of a tenancy which has been historically
           used for a commercial activity for more than 20 years.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.




                                                                                     Page 32 of 97

Section 33

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     12 JUNE 2018


REPORT
1.   PROPOSAL
The proposal is for a Development Permit for a Material Change of Use for an Entertainment and
Dining Business Type 1 – food and beverages which seeks to formalise the existing café use that
has been carried out on site for approximately 15 years. The business known as Chalet & Co.
operates between the hours of 6.00am and 3.00pm daily, catering for breakfast and lunch. As
seen in Figure 2 below outdoor dining area is used.
Figures 1, 2 and 3 below show the locality plan, floor plan and image of the existing use on site.




                                       Figure 1 – Locality Plan




                                                                                     Page 33 of 97

Section 34

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               12 JUNE 2018




                           Figure 2 – Floor Plan of the existing layout




                       Figure 3 – Image of the existing outdoor dining area

The application is before Council’s because the entertainment and dining business is an
inconsistent use within the Attached Housing zone.




                                                                              Page 34 of 97

Section 35

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      12 JUNE 2018


2.    SITE DETAILS
2.1. Background
Prior to 1998 a dwelling house, restaurant and general store existed on site.
On 16 April 1998 Council approved TC 12545 for 10 units and a general store.
Since then 2 changes to the development approval have occurred to incorporate a manager’s
office and subsequently another change which converted that manager’s office into a store room.
2.2. Site Description
The lot is located on the ground floor of a 3 storey unit complex. The outdoor dining area is within
the entry to which was once the general store. The outdoor dining area is ringed by planter boxes
and is beside the driveway to the basement carpark.
2.3. Surrounding Land Uses
The unit complex is located at the southern end of Tingira Crescent with frontage to Orealla
Crescent and David Low Way. The site is located across the road from Sunrise Beach just south
of the Lifeguard flags. Some vehicle parallel parking is located directly opposite the site. North of
the site is characterised by similar 3 storey unit developments which many are used for visitor
accommodation.
3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
    State Planning Policy;
    South East Queensland Regional Plan;
    Planning Regulation 2017;
    The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The following assessment benchmark from the Planning Regulation 2017 applies to the
application:
    SEQ Development Area
The proposal is for urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Development
Area.




                                                                                     Page 35 of 97

Section 36

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     12 JUNE 2018


3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the
provisions are relevant to the development.
Locality Provisions
The subject site is located in the Eastern Beaches Locality and is zoned Attached Housing. The
proposed use is defined as an inconsistent use within the zone and is required to follow an
impact assessable application process.
The most applicable Overall Outcomes of the Locality Code are shown below.
Overall Outcome 7.7.2 of the Eastern Beaches Locality Code—
     a)    New uses and works are located, designed and managed to—
           i.     be compatible with other uses and works;
           ii.    maintain the safety of people and works;
           iii.   avoid significant adverse impacts on the amenity enjoyed by users of other
                  premises, including acoustic and visual qualities;
           iv.    avoid significant adverse impacts on the natural environment, including native
                  habitat removal, fragmentation and attrition; and
           v.     protect the natural beach experience and overall visual amenity for beach
                  users;
     e)    the Eastern Beaches Locality retains its primary role as a residential area, though
           continues to provide some visitor accommodation and a range of local retail and
           commercial functions at Sunshine Beach, Sunrise Beach and Peregian Beach;
           and specifically for Sunrise Beach:
     gg)   For Sunrise Beach—
           i.     Sunrise Beach provides a high proportion of detached houses and some
                  Multiple housing and is attractive to families and permanent residents for its
                  relatively easy access to the beach and local services and facilities;
           ii.    local shopping services, schools and other community facilities are located in
                  Ben Lexcen Drive serving local residents both within and outside the locality,
                  whilst higher order services are available in Noosa Junction and Noosaville;
                  and
           iii.   development in the Sunrise Beach neighbourhood centre (on land zoned
                  Neighbourhood Centre on Map ZM4), expresses a pedestrian scale, and
                  provides integrated landscaping and car parking areas and allows opportunities
                  for outdoor dining and meeting, which contributes to the character and vitality of
                  the centre;
The Overall Outcomes do not provide much support for the subject food and beverage business,
with the Outcomes supportive of residential uses in this location with convenience shopping
activities located in the existing centres at Sunshine Beach and the Ben Lexcen Drive
Neighbourhood Centre at Sunrise Beach. Overall Outcome gg) i provides limited support which
seeks to provide easy access to local services and facilities.
While the previously approved general store may have provided convenience shopping (local
services) for some time, the larger Sunshine Beach and Sunrise Beach (at Ben Lexcen Drive)
centres now fulfil those needs. However, in terms of a near the beach breakfast, lunch or coffee
experience, unlike Sunshine Beach, this part of Sunrise Beach is isolated from these food and
beverage services, being more than 1 kilometre from either centre.



                                                                                     Page 36 of 97

Section 37

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                           12 JUNE 2018


The applicant has provided results of a survey conducted over 32 days from 19 January 2018 -
13 February 2018 which identifies that the beach is the primary purpose for visitation to the area
with the utilisation of the subject business a secondary purpose. The following are survey results
provided by the applicant—
    84% of all patrons stated that their primary purpose in visiting the Sunrise Beach locality
      was to undertake activities at the beach (swimming, surfing, kite surfing walking/running,
      etc.). Whilst their secondary purpose was to dine-in or use the take away provisions of the
      existing café (Chalet & Co); and
    78% of all patrons stated that they would still visit the Sunrise Beach locality to use
      Council’s amenities even if the café did not exist.
The food and beverage use is a reasonable reuse of an existing commercial tenancy catering to
the surrounding local residents and visitors to the beach side location.
The subject business operates from 6am to 3pm daily, catering for the breakfast and lunch time
trade. There is the potential for noise impacts being in close proximity to residential uses. The
subject business has been operating for many years with only one complaint. The complainant
has subsequently moved on, and given that no submissions were received as part of the public
consultation process, it is considered the subject business is operating harmoniously with the
surrounding residential uses. It is pertinent to note that some kind of commercial activity
(restaurant and a larger general store) previously operated at the site, dating back prior to 1998.
Land Use & Works Provisions
The application is considered to comply with the applicable land use and works codes with car
parking discussed below.
The planning scheme requires 1 car space per 10m² of use area for the subject entertainment
and dining use. Use area is the floor area which excludes kitchen and food storage areas. The
subject business has a use area of 36m² including the outdoor dining area, triggering 4 car
spaces (rounded up from 3.6 spaces).
No carparking was directly attributed to the 56m² general store in the original approval. It was
determined at the time that customers would either walk or use the nearby on street parking. In
addition to the required spaces for the whole development (including visitor spaces) there is one
surplus space in the basement of the complex.
For the purpose of calculating car spaces required for a development where no car parking
exists, it is reasonable to compare the car parking rates for the approved use with the proposed
use. Table 1 below provides this comparison.
Table 1 – Car parking summary
Use                                  Car parking rate required
Entertainment and dining business    1 space per 10m² of use area       4 required for the use
Use area = 36m²
Existing general store               1 space per 20m² of gross floor    3 spaces credit
Floor area = 56m²                    area

                                                                        3 credit + 1 surplus = 4 
The unit complex has 1 surplus car space in the basement which may be utilised for a staff member. It is
pertinent to note the subject business has been operating for a substantial amount of time without any
known car parking issues, with patrons currently utilising the on street car parking spaces available or
walking to the site.




                                                                                           Page 37 of 97

Section 38

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        12 JUNE 2018


4.     CONSULTATION
4.1. Public Notification
The application was publicly notified for 15 business days in accordance with the Planning Act
2016. No submissions were received.
5.     CONCLUSION & REASONS FOR DECISION
The Entertainment and dining use is an inconsistent use in the Attached Housing zone. However,
the use caters for residents and visitors at the beach side location while operating harmoniously
with the surrounding residential uses without any amenity or car parking issues.
The following are considered sufficient grounds to justify the decision despite the conflict with the
Planning Scheme:
1.     The Entertainment and dining use is catering for surrounding residents and visitors to the
       beach side location without any adverse impacts.
2.     The food and beverage use is a good reuse of a tenancy which has been used for a
       commercial activity for more than 20 years.
The existing food and beverage business does not raise any significant planning concerns and is
recommended to be approved subject to relevant conditions.

Departments/Sections Consulted:

     Chief Executive Officer       Community Services                      Corporate Services
     Executive Officer             Community Development                   Financial Services
     Executive Support             Community Facilities                    ICT
                                   Libraries & Galleries                   Procurement & Fleet
                                   Local Laws                              Property
                                   Waste & Environmental Health            Revenue Services

     Executive Services        X   Environment & Sustainable Development   Infrastructure Services
     Community Engagement          Building & Plumbing Services            Asset Management
     Customer Service          X   Development Assessment                  Buildings and Facilities
     Governance                    Economic Development                    Civil Operations
     People and Culture            Environmental Services                  Disaster Management
                                   Strategic Land Use Planning             Infrastructure Planning,
                                                                           Design and Delivery




                                                                                        Page 38 of 97

Section 39

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                     12 JUNE 2018


3                        MCU17/0551 - APPLICATION FOR MATERIAL CHANGE OF USE FOR MULTIPLE
                         HOUSING TYPE 3 - RETIREMENT OR SPECIAL NEEDS (PALM LAKE RESORT -
                         STAGE 6) LOCATED AT 20 TRADING POST ROAD, COOROY
DOCUMENT INFORM AT ION




Author                           Development Planner, Lisa Pienaar
                                 Environment and Sustainable Development Department

Index                            ECM/Application/MCU17/0551

Attachments                      1.   Proposal Plans


         APPLICATION DETAILS

         Applicant                           Palm Lake Works Pty Ltd

         Proposal                            Material Change of Use - Multiple Housing –Type 3 Retirement &
                                             Special Needs (Palm Lake Resort - Stage 6)

         Properly Made Date                  24 November 2017

         Information Request Date            13 December 2017

         Information Response Date           8 March 2018

         Decision Due Date                   30 May 2018 (extended until 22 June)

         Number of Submissions               None received



         PROPERTY DETAILS

         Property Address                    19 & 20 Trading Post Rd Cooroy Qld 4563

         RP Description                      Lot 101 & 102 SP 287641

         Land Area                           5796 m² & 12.14 Hectares

         Existing Use of Land                No. 19 - Palm Lakes Resort (Retirement living)
                                             No. 20 – dwelling and shed



         STATUTORY DETAILS

         SEQRP Designation                   Urban Footprint

         Locality                            Cooroy & Lake McDonald

         Zone                                Rural and Community Services

         Overlays                            Natural Hazard Overlay – Flood, Bushfire (Potential Impact Buffer and
                                             Medium Potential Bushfire Intensity)
                                             Natural Resource Overlay – Gas pipeline buffer, Resource separation
                                             area (over Lamonts Rd)
                                             Koala Habitat Areas
         Assessment Type                     Impact




                                                                                                    Page 39 of 97

Section 40

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JUNE 2018


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 12 June 2018 regarding Application No. MCU17/0551 for a
Development Permit for Material Change of Use - Multiple Housing –Type 3 Retirement &
Special Needs (Palm Lake Resort - Stage 6) situated at 19 & 20 Trading Post Road, Cooroy and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
           When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
           prior to the use commencing, and then compliance maintained at all times while the
           use continues.
           Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply
           with the approved plans of development relating to Stage 6 of the development. The
           approved plans are listed in the following table unless otherwise amended by these
           conditions.
            Plan No.                   Rev.   Plan/Document Name                         Date
            C-001-2017, Sheet 1 of 3   Q      Overall Site Plan, drawn by Palm Lake      31/01/18
                                              Resort
            C-002-2017, Sheet 2 of 3   Q      Overall Stage Plan, drawn by Palm Lake     31/01/18
                                              Resort
            C-003-2017, Sheet 3 of 3   B      Stage 6 Plan, drawn by Palm Lake Resort    31/01/18
            C0-000-000, Sheet 01 of    A      Floor Plans (Everglade), drawn by Palm     29/02/18
            01                                Lake Resort
            C0-000-000, Sheet 01 of    A      Floor Plans (Laurel), drawn by Palm Lake   29/02/18
            01                                Resort
            C0-000-000, Sheet 02/01    A      Floor Plans (Coolum 2), drawn by Palm      -
                                              Lake Resort
            L002, L003, L004, L005,    C      Statement of Landscape Intent, March       22
            L006, L008                        2018, prepared by BVLD Consulting          February
                                              (L003 as amended by Condition 11)          2018

           Built Form
     3.    Buildings shall be varied in their architectural style, construction materials, colours
           and finishes.
     4.    All air conditioning units or other mechanical equipment must be located at ground
           level, or otherwise fully enclosed or screened such that they are not visible from the
           street frontages nor adjoining properties.
           Nature and Extent of Approved Use
     5.    The approved development comprises of Stage 6 of the Palm Lake Resort, being 10
           Independent Living Units (each having a maximum of 2 bedrooms + study).




                                                                                   Page 40 of 97

Section 41

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 12 JUNE 2018


          General
    6.    Security in the form of a cash bond or trading bank guarantee to the sum of $25,000
          must be submitted, to secure performance of all conditions of this approval, prior to
          the Prestart Meeting for Operational Works for this stage of development (Stage 6).
          The cash bond or trading bank guarantee will be returned on performance of the
          conditions of approval less any costs incurred by Council in respect of enforcing
          performance of this permit and the related operational works approval/s.
    7.    The requirements of this development approval are to be effected, prior to the use of
          the premises. Council reserves the right to call upon the bond or guaranteed sum
          referred to in this approval to effect compliance with conditions.
    8.    The development must be undertaken and operated in a manner that causes no
          detrimental effect upon the amenity of the neighbourhood by reason of the creation of
          off-site parking impacts, excessive noise, lighting nuisance or other emissions.
          Access
    9.    Access to Stage 6 must be from the existing entry point to the Palm Lakes
          development.
          Landscaping Works
    10.   The development site must be landscaped. The works must be undertaken in
          accordance with an Operational Works approval and the Noosa Plan for that specific
          area and the approved Statement of Landscape Intent plan. This plan (as amended)
          must include a 2 metre landscaped buffer with dense landscaping to existing
          Prospect Place residences adjoining to the east.
    11.   All landscape works must be established and maintained in accordance with the
          approved design for the life of the development, and in a manner that ensures
          healthy, sustained and vigorous plant growth. All plant material must be allowed to
          grow to full form and be refurbished when its life expectancy is reached.
          Noise Management
    12.   The location and operational hours of mechanical plant equipment including domestic
          air conditioning units, is not to create a noise nuisance to occupiers.
    13.   Noise from building works associated with residential development must comply with
          the following–
          a.   Limited to between 7:00am to 6:30pm Monday to Saturday.
          b.   All reasonable measures are taken to minimise noise emissions.
          c.   Not permitted on Sunday or public holidays.
          Fencing
    14.   Fencing is to be erected on the eastern and northern boundaries of the site and shall
          have a minimum height of 1.8 metres.
    15.   Fencing along the eastern boundary line adjoining Prospect Park must be designed
          and constructed in accordance with Plan No. L006 Rev C, dated 22 February 2018 of
          the Statement of Landscape Intent document, prepared by BVLD Consulting.
          External Landscaping and Roadworks
    16.   All external roadworks, frontage and landscaping works associated with
          MCU15/0111/OPW17/0055 must be completed and accepted by the relevant
          authority, (including the required bus stops and all road and landscaping works along
          Elm Street) prior to the commencement of the Operational Works associated with this
          stage of development (Stage 6).


                                                                                Page 41 of 97

Section 42

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        12 JUNE 2018


          Existing Access Driveway Removal and Frontage Works
    17.   The existing redundant access driveway must be removed and the area be reinstated
          in accordance with a Development Permit for Operational Works, the works shall
          include but not limited to the following:
          a.    The access crossover and/or driveway laybacks must be removed, and the
                kerb, footpath and verge area reinstated in a manner to match the footpath,
                kerb and/or verge treatments; and
          b.    The access driveway within the property must be removed and be reinstated
                and landscaped in accordance with approved plans.
          Road Dedication
    18.   Prior to commencement of use a Plan of Survey for boundary realignment must be
          endorsed by Council for road reserve dedication along the frontage of Palm Lake
          development site to the cul-de-sac head of Trading Post Road to ensure that the
          existing public pathway is fully located within the road reserve and a 1.0m clearance
          is provided between the edge of the pathway and the property boundary line.
          Internal Driveways and Parking
    19.   The internal roads shall be concrete or bitumen sealed driveway generally in
          accordance with the approved plans and must comply with the relevant sections of
          AS/NZS 2890.1-2004 and/or AS 2890.2-2002. A Development Permit for Operational
          Works shall be required.
    20.   All parking areas and garages must be in compliance with the requirement of the
          current Australian standards applicable to their use (AS/NZS 2890.1-2004 and/or AS
          2890.2-2002) with a minimum head clearance (headroom) at any point of 2.3m.
    21.   Carparking shall be provided on site, at a minimum rate of 1 space per independent
          living unit for resident parking and 1 space per 4 independent living units for visitor
          parking.
          Earthworks
    22.   All earthworks must be carried out in accordance with a Geotechnical Report
          prepared by a qualified person* and endorsed through a Development Permit for
          Operational Works approval. *(Refer to Advisory Note)
    23.   All earthworks shall be undertaken in accordance with the provisions of AS 3798
          Guidelines on Earthworks for Commercial and Residential Development, with
          geotechnical testing undertaken in accordance with Section 8 of the Standard, and to
          a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS
          3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ
          and submitted to Council prior to final inspection/s of works.
    24.   A registered practicing Geotechnical Engineer shall test the existing ground
          conditions for suitability of placing additional fill, prior to such fill being placed.
    25.   Filling works shall be restricted to the subject site itself, and the finished fill levels are
          to taper to the existing levels on the property. Batters shall be at a maximum grade
          of 1:4 unless retained by an engineer-designed wall or approved retention method.
    26.   Any fill imported to the site may only be from a site licensed with The Environmental
          Protection Agency or from a site for which a Development Permit for Operational
          Works has been issued approving the export of fill.
    27.   Following completion of the filling works for each Stage, the registered practicing
          Geotechnical Engineer supervising the works shall submit compaction tests across
          the entire filled areas and make recommendations if special foundations
          requirements will apply.

                                                                                        Page 42 of 97

Section 43

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   12 JUNE 2018


    28.   Buildings floor levels and bulk earthworks finish levels must take into consideration
          any building Minimum Floor Level required by the planning scheme at the time of
          construction.
    29.   Earthworks carried out on site must not adversely affect the drainage conditions on
          any other properties or existing roads, and/or the patterns and severity of flooding in
          the area particularly on downstream properties. Filling works required on site shall not
          cause additional ponding of water on any adjoining lands or the blockage of, or
          interference with, any natural watercourses. Detailed site surveys indicating natural
          surface levels and contours of any potentially affected properties must be provided
          with any application for a Development Permit for Operational Works for earthworks
          and/or stormwater drainage works. This may require the design and construction of
          drainage pipes and/or an overland flow-path within the development site to cater for
          drainage from the adjoining sites for a 1% AEP design storm.
          Erosion and Sediment Control
    30.   Any person acting on this permit shall prevent erosion and sediment export from
          leaving the site. Site control measures such as silt fencing, controlled gravel access
          to the site and controlled disposal of waste, will be necessary.
          In this regard plans detailing the methods of controlling erosion and sediment are
          required to be submitted to the Council for approval prior to obtaining a Development
          Permit for Operational Works.
          Power Supply
    31.   An underground electricity service shall be provided to the site if not already
          provided. In this regard, an approved ENERGEX Electrical Design Consultant shall
          work in conjunction with Council’s Manager - Works Support to prepare detailed
          designs of the electrical proposal.
          The detailed designs shall then be submitted to ENERGEX for approval and a copy
          of their approval submitted to Council with the application for Operational Works.
          Amalgamation of land
    32.   Prior to commencement of use, Lot 101 SP287641 must be amalgamated with Lot
          102 SP287641 and evidence (title and survey plan) provided to Council.
          Stormwater Quality and Drainage
    33.   A stormwater quality treatment system must be provided for the development to
          achieve an 80% reduction in Total Suspended Solids, 60% reduction in Total
          Phosphorous and 45% reduction in Total Nitrogen. A bio retention system with active
          filter media area of 75m2, depth of 40mm and extended detention depth of 200mmm
          is endorsed to achieve compliance with this condition.
    34.   The stormwater quality treatment system works must be undertaken and maintained
          in accordance with an Operational Works approval and the approved Stormwater
          Management Plan by Calibre Consulting dated February 2017 Doc Number 16-
          001014-02C.
    35.   The application for operational works for stormwater must include the following
          information in relation to any bio-retention system:
          a.    Survey information that demonstrates a free draining outlet from the sub-soil
                drainage system; and
          b.    Design Check Summary consistent with Section 3.1 of the approved
                Stormwater Management Plan by Calibre Consulting dated February 2017 Doc
                Number 16-001014-02C.



                                                                                   Page 43 of 97

Section 44

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JUNE 2018


     36.   Any proposed Community Management Statement required for the development
           must include the approved Stormwater Management Plan by Calibre Consulting
           dated February 2017 Doc Number 16-001014-02C and must include the full cost of
           maintaining the system in accordance with that document.
     37.   A suitably qualified Registered Professional Engineer, specialising in hydraulics shall
           prepare engineering drawings and specifications for stormwater designs and shall be
           submitted in conjunction with an application for a Development Permit for Operational
           Works.
     38.   Stormwater pipelines within the site shall cater for 10% AEP storm event and
           secondary flow paths shall be provided within the site to cater for 1% AEP storm
           event.
     39.   The development must not adversely impact on the existing drainage conditions on
           other properties. The applicant must demonstrate that all stormwater runoffs from the
           fully developed site must be maintained at predevelopment rates for all storm events
           up and including 1% AEP storm event.
           Street Lighting
     40.   Streets lighting and pathways lighting throughout the development site must be
           provided in accordance with Australian Standards.
           Telecommunication
     41.   The requirements for telecommunication services shall be satisfied in relation to the
           provision of new telephone services and broadband services to the developed site. In
           this regard written confirmation from an approved telecommunication agency shall be
           submitted to the Council prior to commencement of use.
           Waste Management
     42.   The operator must provide a waste collection service for proposed units 221-230 as
           described in the Waste Management Plan, prepared by Burchills Engineering
           Solutions dated February 2018.
           Bushfire Management
     43.   The development must be carried out in accordance with sections 5 and 6 of the
           Bushfire Hazard Assessment Report, prepared by Brisbane Bushfire Consulting,
           dated March 2018.
     44.   Certification must be submitted to Council from a qualified person* which certifies that
           the development has been constructed in accordance with the bushfire management
           conditions of this Decision Notice.
           *(Refer to Advisory Note)
B.   The assessment finds the following grounds to support the proposal, despite the conflict
     with The Noosa Plan:
     1.    The development provides a logical extension of the approved retirement use on
           adjacent land and will support the retirement housing needs of Cooroy.
     2.    The rural zoned allotment does not support any significant rural activities or
           agricultural values and the development will not affect Cooroy’s rural production
           capacity.
     3.    The development will not adversely impact on existing residential and rural uses in
           the area.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.



                                                                                    Page 44 of 97

Section 45

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      12 JUNE 2018


REPORT
1.    PROPOSAL
The application seeks approval for a Material Change of Use for Multiple Housing Type 3 –
Retirement or Special Needs for an additional 10 independent dwelling units at 20 Trading Post
Road, Cooroy. The application proposes to extend the existing use established by a previous
development permit to establish Palm Lakes Resort, located at 19 Trading Post Road. The
proposed extension will be integrated into the existing resort with access to all facilities such as
the clubhouse, bowling green, workshop and tennis courts. The extension will become ‘Stage 6’
of the current development, result in a total of 230 independent living units, and extends the site
area of the existing approved site master plan.
All dwelling units are single storey and consist of either 2 bedrooms, or 2 bedrooms, plus a study
and each have a double garage. The dwellings will match the existing built form constructed in
the Palm Lakes Resort. The minimum site area of each dwelling is 230m2.
Access to the site is via the end of the cul-de-sac of Trading Post Road, utilising an existing entry
to the Palm Lakes Resort. The applicant intends to amalgamate both sites should an approval be
granted. Refer Figure 1 – Proposed dwelling sites in overall site plan, Figure 2 – Character
of proposed development and Figure 3 - Landscape Concept Plan




                          Figure 1 – Proposed dwelling sites in overall site plan

                                                                                     Page 45 of 97

Section 46

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                   12 JUNE 2018




                   Figure 2 – Character of proposed development




                        Figure 3 - Landscape Concept Plan




                                                                  Page 46 of 97

Section 47

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JUNE 2018


2.   SITE DETAILS
2.1. Background
The proposed development is to form part of the approved development at 19 Trading Post Road
(MCU15/0111). The development has evolved with the inclusion of additional land and various
minor applications, as follows.
1.   A Development Permit for a Material Change of Use – Multiple Housing Type 3 –
     Retirement & Special Needs was issued on 8 February 2010 and took effect on 23 June
     2010 with the issue of a Negotiated Decision Notice (Ref. 132007.2398). The approved
     development comprised 159 detached and semi-attached independent living dwellings
     (retirement housing), 20 retirement units within a 2-storey building, a 120 bed aged care
     facility within a 2 storey building and a community centre.
2.   On 24 June 2014, a request to extend the relevant period of the existing approval for a
     further 2 years was approved.
3.   On the 2 March 2015, a request to change to the existing approval was approved. The
     changes replaced the approved RSL Care architectural scheme with the Palm Lakes
     scheme. Previously approved multi-level buildings were deleted and the independent living
     units standardised to single-storey detached dwelling options.
4.   On the 14 December 2015 Council approved a Generally in Accordance request for
     changes to the Clubhouse.
5.   On the 22 March 2016 Council approved an onsite Sales Office MCU15/0119.
6.   On the 21 July 2016 Council issued an approval (MCU15/0111) for an extension to the
     existing development including:
      Boundary realignment and lot consolidation;
      An additional 56 independent dwelling units (220 total); and
      Inclusion of additional ancillary facilities including caretakers residence, golf room and
        caravan storage.


2.2. Site Description
The subject site has a total area of 5,791m2. The site has an existing dwelling and large shed
located in the centre of the property. The site has some mature vegetation on the northern and
western boundaries. The site’s topography is relatively flat, with a gentle slope falling from the
driveway in the south-western corner to the rear of the property in the north-east corner. The site
is located adjacent to and on the eastern side of the existing Palm Lakes Resort development
which is located on the eastern side of the railway line and is approximately 1 - 1 ½ kilometres
from the Cooroy business centre. Refer Figure 4 – Subject and surrounding sites.
The site is encumbered by a drainage easement along the eastern boundary and a drainage
easement to the north (the latter yet to be registered).




                                                                                    Page 47 of 97

Section 48

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  12 JUNE 2018




                              Figure 4 – Subject and surrounding sites


2.3. Surrounding Land Uses
The site is surrounded by a mix of low density residential and rural allotments. The North Coast
Rail line adjoins the Palm Lakes development which is approximately 250 metres from the
subject site. The Cooroy business centre is located within walking distance.
The northern property boundary of the site adjoins a rural allotment, which is improved with a
detached dwelling and shed located in the northern portion of the site.
The eastern boundary of the site adjoins a number of low density residential allotments along
Prospect Place. These residences are low set detached dwellings located on sites ranging from
616m2 to 839m2.
The southern boundary of the site adjoins Trading Post Road, where the site is accessed by a 10
metre wide battle-axe handle. The driveway of the site is located at the end of the Trading Post
Road cul-de-sac.
The western boundary of the site adjoins the approved Multiple Housing – Type 3 development
currently under construction.
The proposed development will form part of the larger approved development increasing the
number of dwellings by 10 for a total of 230 independent living units.
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
   State Planning Policy;
   South East Queensland Regional Plan;
   Planning Regulation 2017;
   The Noosa Plan.


                                                                                 Page 48 of 97

Section 49

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      12 JUNE 2018


3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The following assessment benchmarks from the Planning Regulation 2017 applies to the
application:
      SEQ Development Area
The proposal is for an urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Development
Area.


3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the
provisions are relevant to the development.
Locality Provisions
The subject site is located in the Cooroy and Lake McDonald Locality and is zoned Rural. The
adjoining site which is largely developed is zoned Community Services. The proposed use is
identified as an inconsistent use with the zone and is required to follow an impact assessable
application process.
The overall outcomes sought for the Rural Zone include:
(i)     Agriculture and habitat protection are the dominant land uses;
(ii)    The scenic and environmental values, the distinct rural amenity and agricultural productivity
        of the locality are preserved and are not adversely impacted as a consequence of
        development on or adjacent to that land; and
(iii)   Locally appropriate enterprises such as bed and breakfast accommodation, farmstays,
        cabins, camping grounds, roadside stalls and home based businesses enhance the
        economic sustainability of the hinterland;
The primary assessment issue raised by the Locality Code is the expansion of the development
onto the Rural zoned allotment. The proposed development is not a rural use, nor does it meet
the overall outcomes of the rural zone.
The applicant submits the following comments to support the use on the rural zoned land:
a)      The proposed development provides an accommodation type, catering in particular to the
        more valuable portion of the population, being the ageing. The proposal will allow
        increased choice, affordability and care for the elderly and retired in the Cooroy-Noosa
        region. The proposed development achieves a density consistent with the surrounding area
        given it duplicates the character of the adjoining retirement facility, Palm Lake Resort
        Cooroy-Noosa. We acknowledge that the proposed development is not a rural use,
        however it is a consistent use with the surrounding uses and established character for
        Trading Post Road.




                                                                                      Page 49 of 97

Section 50

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JUNE 2018


b)   Despite the site being zoned Rural, the proposed development is consistent with the
     existing built form and character within the established area. The development design is an
     effective and efficient use of the site responding to site characteristics particularly with
     regards to access, size and orientation. The development will positively contribute to
     Trading Post Road whilst preserving the scenic and environmental values of the rural land
     located to the north of the subject site.
c)   The proposed development has been designed to face inward to the existing resort in order
     to preserve any potential impacts to adjacent rural land located to the north. The adjoining
     property to the north features a 12 to 15 metre vegetation buffer to the subject site to the
     existing resort ensuring amenity aspects are preserved.
d)   The subject site could be described as landlocked as it features low density residential land
     uses to the eastern, southern and western boundaries;
e)   Given the subject site’s shape and size any potential use of the site for agricultural
     purposes would not be suitable and may result in more disruption for surrounding
     residential land uses.
The business centre of Cooroy is located less than 2 kilometres away from the existing and
proposed development. The proposed development is generally consistent with the existing built
form and character in a largely established residential area, where low density residential
development adjoins the site to the east, west and south.
The proposed development has an open space area to the rural land to the north (includes bio-
retention basin, plantings and grassland) and the adjoining rural property to the north features a
12 to 15 metre vegetation buffer to the subject site, thus preserving the scenic and environmental
values of the rural land located to the north of the subject site. The expansion will not introduce
any significant new impacts on existing uses in the area or adversely affect Cooroy’s rural
production capacity. The site’s size and location as largely a pocket in the centre of residential
land on 3 sides does not lend it to any potential use for agricultural purposes.
Land Use & Works Provisions
The application has been assessed against applicable codes. The pertinent issues arising out of
the assessment against the codes are discussed below.
Buildings and parking
Each dwelling to be constructed on the subject lot will be single storey and consist of either 2
bedrooms or 2 bedrooms and a study and double lock up garage. New residents will be offered
a choice of designs, with an indicative range of single-level, hebel block construction, consistent
with dwelling designs approved under the previous application. The proposal plan includes
minimum setback requirements for the dwellings within their individual site areas, being:




The resulting “building envelope” within the individual dwelling sites is shown in Figure 5 –
Proposal Plan Extract Showing Dwelling Siting Arrangement.




                                                                                    Page 50 of 97

Section 51

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         12 JUNE 2018




                 Figure 5 – Proposal Plan Extract Showing Dwelling Siting Arrangement


The buildings will be consistent with those already constructed on site. Each site has a minimum
width of 13 metres and a depth of 18 metres.
Internal works
Existing and proposed internal roads are 4 metres wide. The proposed internal road will be a
single lane one way circuit. Appropriate directional signage will be installed to guide traffic
direction. Boundary truncations have been applied to sites 221, 223, 226 and 227 as shown on
the proposal plans.
The applicant will be required to provide a 2 metre wide landscaping strip that contains dense
landscaping along the eastern boundary of the development to provide a buffer to existing
residential properties.
External Road works
A condition of the previous approval required the developer to upgrade Cooroy Connection Road
(Elm Street) at its intersection with Pearsons Road, which included the provision of two Bus
Stops with shelters, a pedestrian refuge and upgrade to existing kerb line and line marking. This
was to occur at stage 1A, however did not occur. The developer has only recently commenced
construction of the works. There are many dwellings that have been constructed that rely on this
intersection and safety is of concern. Although the Department of Main Roads have indicated
they have no requirements relating to this proposal, it is considered prudent to require this
intersection to be completed prior to the Operational Works (associated with the proposal)
commencing. This will be conditioned accordingly.




                                                                                        Page 51 of 97

Section 52

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JUNE 2018


Stormwater and flooding
The expanded development will not adversely impact on the flooding conditions on upstream or
downstream properties and complies with the requirements of the Natural Hazards Overlay
Code. Conditions are recommended requiring the following:
   earthworks and drainage devices to be designed to maintain existing conditions on
     neighbouring properties
   fencing along the northern boundary line adjoining Prospect Park to ensure unobstructed
     stormwater flows
4.   CONSULTATION
4.1. Referral Agencies
The application was referred to the following Referral Agencies:
   Department of Infrastructure, Local Government and Planning (SARA)
The Department is a referral agency for Department of Transport and Main Roads.
The Department is a concurrence agency for the development as the site is located with 25
metres of the State Transport Corridor (Elm Street and the North Coast Rail line).
The Department has responded advising that they have no requirements.
4.2. Other Referrals
The application was forwarded to the following internal Council officers:
   Development Engineer, Development Assessment
   Environmental Officers’, Development Assessment and Environmental Services
4.3. Public Notification
The application was publicly notified for 15 business days in accordance with the Planning Act
2016. No properly made submissions were received.
5.   CONCLUSION & REASONS FOR DECISION
The application to expand the existing Palm Lakes retirement and aged care development
approval raises a number of considerations. The primary consideration is the proposed
development’s expansion onto Rural zoned land, where The Noosa Plan identifies the retirement
living use as an inconsistent use within the zone. The rural lot is relatively small, substantially
surrounded by urban development and not considered to have values that warrant its protection
for rural purposes.
The secondary issue is that the intersection upgrade (with Elm St) has not been constructed in
accordance with the previous approval. Given this is a safety concern, it is considered prudent to
require the developer to complete these works prior to Operational works approval being granted
for Stage 6.
The assessment finds the following grounds to support the proposal, despite the conflict with The
Noosa Plan:
   The development provides a logical extension of the approved retirement use on adjacent
     land and will support the retirement housing needs of Cooroy.
   The rural zoned allotment does not support any significant rural activities or agricultural
     values and the development will not affect Cooroy’s rural production capacity.
   The development will not adversely impact on existing residential and rural uses in the
     area.
The application is recommended for approval subject to conditions.


                                                                                    Page 52 of 97

Section 53

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       12 JUNE 2018


Departments/Sections Consulted:

   Chief Executive Officer        Community Services                      Corporate Services
   Executive Officer              Director                                Director
   Executive Support              Community Development                   Financial Services
                                  Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                                  Waste & Environmental Health            Revenue Services

   Executive Services         X   Environment & Sustainable Development   Infrastructure Services
   Director                   X   Director                                Director
   Community Engagement           Building & Plumbing Services            Asset Management
   Customer Service           X   Development Assessment                  Buildings and Facilities
   Governance                     Economic Development                    Civil Operations
   People and Culture         X   Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure Planning,
                                                                          Design and Delivery




                                                                                       Page 53 of 97

Section 54

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA    12 JUNE 2018


                                                  ATTACHMENT 1




                                                    Page 54 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                          12 JUNE 2018

                                                                                                                                    ATTACHMENT 1

                  ober         llDtllle          ert}                             EH      Goa)
                 ere rr                 rere                                     Le         sor                T
              ISCEIGER CEEFEREEP)                                                EAs)
                     4         ,,                                                           t   \  }
              2           SL                                                   lel as
              :                pale tl be                     ||)                 =
              5      se               a                    mons                  |~||> Fa        Cie
                                      eR                Perr              fat
                                     Pa     ft                                 i                              Jaye               Lm)
                                            Feleleelel|-l-l])                                          \ a4                    &7
                         wen          — |                  a                          ome                Sa My                  so)       cer
                           ‘a                                                  B!                       \         L—        1
                                              <>           Cy)        [hod       |                 ANY                   lly)
                                            ; OW                 > Aus           i                        wen      ’      4        .
                                      AOC                                                    BK   OY
                                         PKS                                               SR                       LI
                                                                         J,         DANRM\Y                 KY     L~»         w
                                                                            ORR                      .      AS ~            ’      fy
                                                                     REID             ENE                       OE
                                                    wg              Kes CS             ReNAeumees        NDS)        ey        f
                                                      LOSRSBEONOn                                    I ORLY
                                                                                                \           5
                                           ose          Y    seu,            eK               )         Oe                 Sab
                                          —               mt     xy eS      eS        CS      a   AY       Seg             <
                                                            6 /    OS          SOY                   ¥  Sot
                                                               Eo        SSHSO                         TN
                                                                     PO                  SS S a                                 —
                                                                a         WQS BS                         Oy        OU
                Tw                                                 B®       o                                                       2
                          ~~                                        Oo        oy       -                 ip                    \    Sty
                                       ROOF OVERHANG                  %         ss       CS              cS                           NG
         OPEN SPACE /LIMING             WIHIN SETBACK                  Wy,         “                 i;               )                OL
         AREAS 10 NORTHERN     \                                          ,          s                                 A                 Os
      (/_PARY OF SITE WHERE     \                                          %,                 \            cS                               en
      | / POSSIBLE              |                                            4         %         CS CS RS                                       407)
      |             a                18,000mm NINIMUM                          %         Y,      SSN oS Sy SOD
      \                                         a                             waltaee         3 /             oS                                 )       »
                                         =                        .           =                 Ys QS                                                  es
                                                         1        OE                                         OO
                    £    i          RFONENCE             i        &   °              —a,         AN ‘O         v                             /
                    Bi            Max. Cover 65.0% Total i        a                      mana      NN    Cr
                         d                                        a                         =                      AGED     CARE
                         i                       cue                                                    {DEVELOPMENT
                                             FARE RATED WALL 60/60/60                                       \                          /
                                            fe tecge to Bandy}                                        in     SS                       /  =
                 (02) SITING CONSTRAINTS                                                             mae                              /83
                  \OL7        GENERIC SITE AREA - 234.0 Squr                                                     \                  //¥&s——
                                                                                                                   .
       PROPOSED RESORT DEVELOPMENT-AREA 121,378sqm                                                                  ‘.
                                                                                                                      \
       TOTAL DWELLINGS =                       230                                                                    \
       MIN VISITOR SPACES =                    58                                                                      \
       MIN LOT SIZE =                       230sqm                                                                        4    :
       PRIVATE OPEN SPACE MIN/LOT =          20sqm                                                                       \
       PRIVATE OPEN SPACE MIN WIDTH =           3m                         ADACED       NEVI     ADMCNT                      \V
       MAX SITE COVER =                       65%                     PROPOSED          DEVELOPMEN                      SN
       MIN. 450mm EAVES, EXEPT TO GARAGES FRONTS &                                                                        =
       BUILT TO ZERO LOT LINE.                                              TAGE     6:      10     UNIT                  BN
       MAX SINGLE STOREY NOT GREATER THAN 6m IN HEIGHT                     TALL        0:     \                            e\
       MIN. 12° ROOF PITCH                                                     oo                                             \
       MIN SETBACK TO PUBLIC ROAD                   6m                   SITE     AREA:      5.796m’                           \
       (EXCLUDING COVERED OUTDOOR AREA & PATIO AREA)                                     co
       MIN PROPERTY BOUNDARY SETBACK =              3m
       (EXCLUDING COVERED OUTDOOR AREA & PATIO AREA)
       CAR PARKING LOCATIONS MAY ALTER IN FINAL LAYOUT.
      NOTE: GARAGE MAY BE BUILT TO ZERO LOT LINE
       PROPOSED AGED CARE DEVELOPMENT-AREA 20,245sqm
       TOTAL BEDS = 120
       CAR PARKING LOCATIONS MAY ALTER IN FINAL LAYOUT.                                                %          50m         _—         150m        _
                                                                                                                   SCALE 1:2500 (AT A3)
     .                                                                                                                                                             |
        ene            ase                                                                                                                         =
           stort
5	1	1	1	76	2	544	2962	48	27	24	fa
5	1	1	1	76	3	1646	2968	33	3	16	K
5	1	1	1	76	4	1772	2970	44	38	0	|01
4	1	1	1	77	0	385	2995	1781	32	-1	
5	1	1	1	77	1	385	2995	11	11	61	Po
5	1	1	1	77	2	401	2981	29	45	65	Box
5	1	1	1	77	3	435	2995	36	27	51	wars
5	1	1	1	77	4	479	2995	121	27	0	SourneGRT
5	1	1	1	77	5	549	2981	24	45	51	Bc
5	1	1	1	77	6	576	2981	23	45	62	aLD
5	1	1	1	77	7	605	2995	28	27	59	42s
5	1	1	1	77	8	788	2997	13	19	51	O|
5	1	1	1	77	9	850	3002	100	9	11	swcrowe
5	1	1	1	77	10	992	3001	77	26	0	[von
5	1	1	1	77	11	1092	2999	23	15	60	sc
5	1	1	1	77	12	1117	2987	30	44	60	|
5	1	1	1	77	13	1155	2999	75	15	93	STREET
5	1	1	1	77	14	1253	2997	115	19	83	TRADING
5	1	1	1	77	15	1390	2997	67	19	96	POST
5	1	1	1	77	16	1480	2997	32	19	96	RD
5	1	1	1	77	17	1975	2997	77	37	0	SOUINPOT
5	1	1	1	77	18	2051	2997	53	37	2	CENTIOL
5	1	1	1	77	19	2103	2997	44	37	49	TOMER
4	1	1	1	78	0	377	3021	1802	60	-1	
5	1	1	1	78	1	377	3021	34	40	35	wen
5	1	1	1	78	2	414	3021	33	40	17	Ent
5	1	1	1	78	3	454	3021	137	40	0	nieepainiakecon.ou
5	1	1	1	78	4	789	3025	8	31	64	Pp
5	1	1	1	78	5	850	3038	62	10	92	EXPANSION
5	1	1	1	78	6	920	3038	25	10	92	SITE
5	1	1	1	78	7	993	3038	60	25	17	fyvua7
5	1	1	1	78	8	1065	3060	3	3	78	|
5	1	1	1	78	9	1092	3035	23	16	34	SC
5	1	1	1	78	10	1142	3035	83	16	5	{SUBURB
5	1	1	1	78	11	1253	3033	103	20	89	COOROY
5	1	1	1	78	12	1462	3061	2	2	0	-
5	1	1	1	78	13	1608	3029	1	4	73	\
5	1	1	1	78	14	1722	3028	1	6	39	!
5	1	1	1	78	15	1826	3042	20	39	93	0
5	1	1	1	78	16	1857	3042	25	39	94	3
5	1	1	1	78	17	1953	3024	50	49	18	romoe
5	1	1	1	78	18	2002	3024	30	49	41	een
5	1	1	1	78	19	2039	3024	62	49	45	soon
5	1	1	1	78	20	2109	3024	70	49	32	sens
4	1	1	1	79	0	289	3061	1994	38	-1	
5	1	1	1	79	1	289	3076	1	4	35	VA
5	1	1	1	79	2	788	3069	13	20	45	Q|
5	1	1	1	79	3	850	3068	95	22	28	saa
5	1	1	1	79	4	993	3075	75	24	0	|avane|
5	1	1	1	79	5	1092	3071	23	16	31	es
5	1	1	1	79	6	1145	3071	75	16	1	Jpcone
5	1	1	1	79	7	1253	3069	68	20	39	[4563
5	1	1	1	79	8	1353	3061	3	38	64	|
5	1	1	1	79	9	1388	3069	131	30	11	staTe|QLD
5	1	1	1	79	10	1674	3078	14	4	27	Le
5	1	1	1	79	11	1975	3067	191	23	0	veswewReuanenamm
4	1	1	1	80	0	1954	3315	289	44	-1	
5	1	1	1	80	1	1954	3315	105	44	96	Page
5	1	1	1	80	2	2074	3316	49	34	94	54
5	1	1	1	80	3	2138	3315	43	35	94	of
5	1	1	1	80	4	2194	3316	49	34	96	97
         ABN 77 995 457 991 ACN OOS 277 038

Section 55

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 55 of 97

-                                                                                                                                                uU
                                                                                                                                                                  rc
                          aze       Cam   SemEen===PE=RPR=E=Ex BP                            a                                                                    >
                   < 2    ak        aS    Res =a = eK =Re2225 iS                               “po                                                                =
                   #3 2%             Ze   PoP rev oe SS5rc =z                                  BERS
                   2.285,2 228      VIS    Poeopmomnw an     oOn  iO                           Bas                                                                a
                   Pox sS5 Bs       sole  o8S5SS    Z2aSaFAS2Zo B                              ao”                                                                —
                   ge2gs2 3a°       SRR   LSeBSSsagxns5cogr   =    rm                          Bola
                   £.98233 ba52     SBC   2ES5R35SShn3 0338                                      noe \                                     QVOu SiNOMY) ~         z
                   233855 329,      O11   ReOSIS* HSnszS"yus HB                                  age                                                              5
                   resize? s828}    Bsb   s8aeqckSon*oe'sa B                          AAAS       AEBS)                                             ea
                   prises gael      Bee   =Eseeetsahuss Be         E              “um            ASB)                                         faa                 Re
                   teens  hi        oP    eoSof e528 fo"           BNO      —See                      )                                   ee                      m
                   Paha ig          - —   ssn38 2-25               6S                                                              fis      fs ]| HA              z
                    Bort  38                 3x5    a3 zz              =
                          388       2 &   F238s8s & 3 Se           5 3lZ                                                                     sts) |               =
                          #         ep    25355     3 § 7"         7 lS      it    =           -                                                    44            wv
                          zh           Oo =               =        za =      z                   .                                                                —
                                    BE    gseve     3 &            z         f  2  20oF.                                               fe \s\s|s| Cy]
                                    =  '  as   5	1	1	1	20	5	1224	714	15	29	71	rm
5	1	1	1	20	6	1456	714	16	29	60	nm
5	1	1	1	20	7	1545	710	30	17	85	S
5	1	1	1	20	8	1663	710	10	25	28	5
5	1	1	1	20	9	1779	726	31	12	74	om
5	1	1	1	20	10	1977	728	14	4	72	=
5	1	1	1	20	11	2811	722	9	11	59	7
5	1	1	1	20	12	3016	730	1	3	67	{
5	1	1	1	20	13	3082	721	3	10	0	f
5	1	1	1	20	14	3320	707	21	40	51	Oo
4	1	1	1	21	0	850	728	2236	49	-1	
5	1	1	1	21	1	850	736	18	9	70	=
5	1	1	1	21	2	907	736	19	23	60	5
5	1	1	1	21	3	967	733	78	28	30	-2e
5	1	1	1	21	4	1084	733	18	14	20	F
5	1	1	1	21	5	1170	731	76	23	53	2H
5	1	1	1	21	6	1456	735	18	10	89	=
5	1	1	1	21	7	1517	730	58	35	82	25
5	1	1	1	21	8	1663	740	9	17	43	i
5	1	1	1	21	9	1779	739	22	23	0	z
5	1	1	1	21	10	1974	734	18	31	0	s
5	1	1	1	21	11	2611	728	25	49	15	nv
5	1	1	1	21	12	2664	733	53	5	32	TT
5	1	1	1	21	13	2935	727	70	52	8	[|
5	1	1	1	21	14	3016	731	70	35	15	teh
4	1	1	1	22	0	850	735	2503	80	-1	
5	1	1	1	22	1	850	759	253	40	67	228222
5	1	1	1	22	2	1169	760	77	35	60	22
5	1	1	1	22	3	1456	760	119	39	29	27S
5	1	1	1	22	4	1663	762	9	45	38	f
5	1	1	1	22	5	1779	763	37	23	68	2
5	1	1	1	22	6	1918	766	74	43	48	yi
5	1	1	1	22	7	2082	739	21	88	47	zx
5	1	1	1	22	8	2557	760	254	34	13	Alfa
5	1	1	1	22	9	2825	735	108	76	0	||
5	1	1	1	22	10	3023	769	63	35	18	Co
5	1	1	1	22	11	3319	748	34	66	4	z
4	1	1	1	23	0	480	787	1918	32	-1	
5	1	1	1	23	1	480	791	20	13	29	2)
5	1	1	1	23	2	517	791	101	26	4	v/o/z2)
5	1	1	1	23	3	859	782	10	35	61	=z
5	1	1	1	23	4	907	797	19	9	48	~»
5	1	1	1	23	5	967	787	79	26	63	cee
5	1	1	1	23	6	1084	787	19	26	50	2
5	1	1	1	23	7	1171	809	16	2	27	-
5	1	1	1	23	8	1228	796	18	23	96	2
5	1	1	1	23	9	1453	787	75	30	38	wx
5	1	1	1	23	10	1779	787	32	25	0	o-
5	1	1	1	23	11	2088	802	14	2	42	Z
5	1	1	1	23	12	2393	804	5	11	71	d
4	1	1	1	24	0	470	778	2883	88	-1	
5	1	1	1	24	1	470	814	76	2	9	TTT
5	1	1	1	24	2	629	803	11	12	9	Tt
5	1	1	1	24	3	675	838	28	18	0	)o
5	1	1	1	24	4	735	817	17	25	0	(80606
5	1	1	1	24	5	905	808	21	40	45	B
5	1	1	1	24	6	967	812	79	37	37	MSR
5	1	1	1	24	7	1084	826	19	23	8	RB
5	1	1	1	24	8	1170	814	76	34	23	FS
5	1	1	1	24	9	1312	810	48	33	52	BB
5	1	1	1	24	10	1451	819	24	31	28	OF
5	1	1	1	24	11	1509	815	18	20	0	ES
5	1	1	1	24	12	1545	804	93	46	0	Ty
5	1	1	1	24	13	1779	809	15	35	33	2
5	1	1	1	24	14	1918	811	73	40	31	Hz
5	1	1	1	24	15	2088	805	37	37	64	48
5	1	1	1	24	16	2393	790	36	54	46	is
5	1	1	1	24	17	2518	778	106	88	85	AN
5	1	1	1	24	18	2680	836	4	15	43	1
5	1	1	1	24	19	2782	820	126	10	35	ee
5	1	1	1	24	20	3023	807	63	34	13	Le
5	1	1	1	24	21	3319	819	34	26	87	m
4	1	1	1	25	0	491	836	2207	28	-1	
5	1	1	1	25	1	491	853	10	6	11	mam
5	1	1	1	25	2	521	853	81	7	38	oleltc
5	1	1	1	25	3	1228	843	46	13	33	rm
5	1	1	1	25	4	1314	839	40	25	55	DBD
5	1	1	1	25	5	1398	838	13	25	24	nm
5	1	1	1	25	6	1777	836	13	25	49	Ss
5	1	1	1	25	7	1976	850	15	8	48	=
5	1	1	1	25	8	2109	844	16	17	81	2
5	1	1	1	25	9	2498	846	5	5	0	,
5	1	1	1	25	10	2695	855	3	1	6	-
4	1	1	1	26	0	479	836	2874	87	-1	
5	1	1	1	26	1	479	850	164	51	25	HiRes
5	1	1	1	26	2	675	845	77	40	41	os
5	1	1	1	26	3	849	847	77	51	78	8
5	1	1	1	26	4	889	837	60	71	80	F
5	1	1	1	26	5	997	846	108	35	37	SES
5	1	1	1	26	6	1169	850	20	39	0	3
5	1	1	1	26	7	1255	852	215	31	0	*ReSseb
5	1	1	1	26	8	1445	837	48	71	22	2
5	1	1	1	26	9	1545	841	141	48	0	Gigi
5	1	1	1	26	10	1693	837	25	71	0	|
5	1	1	1	26	11	1779	851	14	11	63	*
5	1	1	1	26	12	1918	856	10	41	0	w)
5	1	1	1	26	13	1977	859	14	10	31	©
5	1	1	1	26	14	2088	844	37	48	39	GE
5	1	1	1	26	15	2456	852	30	39	27	fw
5	1	1	1	26	16	2607	836	102	87	69	cs
5	1	1	1	26	17	2745	836	116	87	39	atl
5	1	1	1	26	18	2872	840	120	48	15	th
5	1	1	1	26	19	3024	843	62	35	24	Lf
5	1	1	1	26	20	3319	850	34	58	53	=
4	1	1	1	27	0	491	879	2026	29	-1	
5	1	1	1	27	1	491	897	39	3	6	aa)
5	1	1	1	27	2	549	879	11	29	0	o
5	1	1	1	27	3	736	888	15	12	81	2
5	1	1	1	27	4	850	886	19	6	1	—
5	1	1	1	27	5	996	879	20	29	5	al
5	1	1	1	27	6	1170	894	19	7	37	=
5	1	1	1	27	7	1509	882	2	8	18	r
5	1	1	1	27	8	1593	888	11	11	34	=
5	1	1	1	27	9	1673	883	14	19	67	5
5	1	1	1	27	10	2444	891	12	11	0	pi
5	1	1	1	27	11	2508	888	9	12	34	a
4	1	1	1	28	0	479	869	2874	112	-1	
5	1	1	1	28	1	479	876	190	80	29	Biel
5	1	1	1	28	2	675	891	27	37	0	é
5	1	1	1	28	3	735	902	17	12	42	2
5	1	1	1	28	4	1055	914	77	26	33	ee
5	1	1	1	28	5	1514	896	173	44	41	epee
5	1	1	1	28	6	1687	873	48	71	67	|
5	1	1	1	28	7	1918	903	10	20	50	;
5	1	1	1	28	8	2405	869	76	75	80	AS
5	1	1	1	28	9	2534	876	168	105	0	Coiyg
5	1	1	1	28	10	2734	876	134	105	12	Ha]
5	1	1	1	28	11	2879	889	116	36	13	GY
5	1	1	1	28	12	3318	923	35	30	38	5
4	1	1	1	29	0	491	931	1969	23	-1	
5	1	1	1	29	1	479	931	51	17	32	35

                       13) S 2                                       o    $8     z                               aA               R peg? | |e PE    4             O
                        4| SO |2                                          eel    l=                                ON:
                Li | |      Pie                                       5  UU        ten SH: wo a                4:                  Leo: | |*] FI,
                 gels] m8                                                                                     ANY            Ss    ET I                           =
                 3 /8/§ §la] SIR                                                                             C2 \ 6           A    Le    lie ee                   =
                  \*{8/8|                                                                               2   yf     wns            J §)             tt             =
                        ol“ 2                                               ———                        9   ,  3   S                2)     3       aye |
                 mig|a|4|2    5                                                  EDGE OF CARRIAGEWAY  Ss  4:    ~ <*>     > <2 : petal Le] | |                     |
                 P/F    Rls                                                       ROAL              SF LNOVOXY “> 4 erly                                          =
                 seize) | loa                                                                     SANS          AXES                ea eairaeek es,               at
                 ges | io                                                                       PF   LQNABDO                        CRTC
                 aleles| | 32                                                                  PAN         CORSE                     EE            -              =
                 Bee |      (Fs                                                                BORO,                                                              I
4	1	1	1	43	0	480	1294	2873	69	-1	
5	1	1	1	43	1	480	1309	163	36	3	Sgieiels|
5	1	1	1	43	2	699	1325	52	12	24	ai
5	1	1	1	43	3	1832	1306	9	17	33	:
5	1	1	1	43	4	1991	1290	58	69	36	gir
5	1	1	1	43	5	2215	1298	110	65	40	EX
5	1	1	1	43	6	2520	1311	60	22	23	Ls
5	1	1	1	43	7	2810	1294	104	69	44	eli
5	1	1	1	43	8	3319	1308	34	37	0	o
4	1	1	1	44	0	470	1331	2346	39	-1	
5	1	1	1	44	1	470	1357	2	2	91	|
5	1	1	1	44	2	517	1339	126	24	0	|<|/Z2\lo
                lalaisielel (Elz                                                           Hes ZA            OXON)            “eee            OH                  m
                            >                                                               Js  s                       Yoox         7 i
                     \s|4)  |ols                                                   i,      O\Y                  x        KS             ?_3L2_| -                 Zz
                 4   lele| |  2                                                    He     AS                            Sworn,”         (ila,        |            9
                 3   lols   0 >                                                  Lib     ,       J      %              IN               aE          \ ||
                 >|  |Dig   22                                                  a3      L\2\   ay        ON          IPR BS             Se        4 | |
                a    Be | Be                                                     P.O              COOOL             AG            a             ee                5
                 &   g                                                           is AS KY           XE y                  K,7    \\      : a    -                 m
                 2     =                                                           JON:         3                 ¥     ;       \ \     I        -
                              ae                                        bh     FA        RYOSES                <   be    Sr    FS                                 z
                              mA  m3                                          (4         7      & R           SS    SLSSA           _                 T
                           zi<    /                                          4                       Y         ee *     FO                                        oO
                        zB) rim                                          l\“<gy                              Ss i y\        on i “
                        =)        :                                       eo                 4                «   }       WD     aH                               >
                        Blo |S)                                         oer                   ey         *,     BY      ys  NS         NB         +
                        S| om                                          6       vo              ve      ey      +3           Nl gs    rN             |
                       ale zigms                                    oe          >           OO    YK          NOR             eet
                        z  : =) 89s                               er           <O a    WX?              DQ 3      rks        eg        |          |
                        ;     ais                        Ai <gF                mem z     eS               er         hy        . eS             :
                        |?      =                    wer                       Bo  a      x            o           y          SS   .
                              m                        yee                     oO                        #          ,         oil |                   -
                  SO Fr       ees                    <SSs                      35°                  VPI        TRO            IOs
                 rm)    4] y |2\2   RS                        ~                ma               OS AY/Y/\ 4    3         y   3S    LD               |
                                    °             oc         ~                                                 *      S        >     5
                        Zz} Oo |e/o 3                           \~_            zm            <> ¢          5   5          WK
                 OO     6     2\°                                  ~~          A                  CxS &        i
                                >                                      Sey                          e    i     5
                                A   .                                EARS   we                t    SS      ;                                                      oa
 U                 3            >   fa                                O4n ONS  \~                 S                                a8
p                filet          STs                                  | |            re        W/hs                                 i                 mm           e
©                Wing                                                                  ww    I/e                                                    |             q
©                 aeaze    7                                                              sv/és                                    i                              Cc
on                Hu     gS         %                                                          maw                                                  | ()          <
°                 aes    38         S                                                     the    —~                                                               m
                   8eg8  SS         2                                                      :
 =                 gave                                                                   5                                                                       °
o                                                                                                                                                                 —_
“I                                                                                                                                                                co

Section 56

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 JUNE 2018




                                                  Page 56 of 97

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                   12 JUNE 2018

                                                                                  DRAINAGE EASEMENT

                                                                          KY
                                           »,                                4 ye
                                          Le
                                          x6

                        yy,                   N                                      / 7
                                                       4                            AQ
                                                        C                          =
                                                                                  Ly
                                                                   NOG
                                                                               2
                                                                              uy
                                                                         g
                                                                            &
                                                                          Ly
                 -                                                  /    a
                      “my
                              4G                                /)
                                     <                            4                                        ROOF OVERHANG
                                        Cc                     py                OPEN SPACE / LIVING       WITHIN SETBACK
                                           ,                                     AREAS TO NORTHERN.
                                                4           |;                  POSSIBLE
                                                                                 PART OF SITE WHERE \
                                                    \          15                        ]              18,000mm MINIMUM

              4                                                                           e   |i                                iS
             i.                                                                           8   :      Max. Cover 65.0% Total i   is
        L            /                                                                    “ih                         .         8
                                                                                                                     «||
                                                                                                               FIRE RATED WALL 60/60/60
                                                                                                                Gorge to Boundary
                                                                                        ae SITING CONSTRAINTS
     SCALE      1:500     (@ A3)
                                    DRAWING REFERENCE No.  HOUSE TYPE / VARIATION    DEVELOPMENT NAME   DRAWN
   raat em rman ec                   CO-003-2017               sueee                   MHE COOROY        SC             PaimLake
        “outa cna fowth           Al EXPANSION SITE liana | sc LOT 20 «Lor 101 spes876e
       one
5	1	1	1	39	2	409	3049	17	25	39	a7
5	1	1	1	39	3	437	3048	23	27	35	582
5	1	1	1	39	4	464	3043	28	43	63	108
5	1	1	1	39	5	498	3043	30	43	50	FAX.
5	1	1	1	39	6	528	3043	18	43	28	U7
5	1	1	1	39	7	545	3048	37	27	50	S882
5	1	1	1	39	8	590	3048	28	26	11	DF
5	1	1	1	39	9	774	3039	23	30	46	Bl]
5	1	1	1	39	10	834	3047	94	23	0	oewsese
5	1	1	1	39	11	938	3034	22	43	0	—
5	1	1	1	39	12	976	3040	75	25	0	lavane|
5	1	1	1	39	13	1074	3051	24	15	56	Es
5	1	1	1	39	14	1103	3034	29	43	96	|
5	1	1	1	39	15	1138	3051	72	15	83	STREET
5	1	1	1	39	16	1227	3040	122	29	83	|TRADING
5	1	1	1	39	17	1371	3049	67	20	90	POST
5	1	1	1	39	18	1461	3049	31	20	96	RD
5	1	1	1	39	19	1752	3022	53	38	89	03
5	1	1	1	39	20	1950	3047	79	43	0	“counnt
5	1	1	1	39	21	2028	3047	51	43	37	conan
5	1	1	1	39	22	2082	3047	37	43	12	Tove
4	1	1	1	40	0	362	3075	1794	42	-1	
5	1	1	1	40	1	362	3075	60	42	16	vide
5	1	1	1	40	2	430	3081	169	27	0	Lapel
5	1	1	1	40	3	794	3075	3	4	82	|
5	1	1	1	40	4	976	3076	3	3	87	|
5	1	1	1	40	5	1048	3076	3	3	90	|
5	1	1	1	40	6	1125	3086	82	17	51	suBURB
5	1	1	1	40	7	1227	3076	110	29	88	|COOROY
5	1	1	1	40	8	1932	3070	85	50	0	rosoesam
5	1	1	1	40	9	2016	3070	67	50	0	ceueae
5	1	1	1	40	10	2087	3070	50	50	28	seas
4	1	1	1	41	0	1048	3094	1096	56	-1	
5	1	1	1	41	1	1048	3112	3	3	65	|
5	1	1	1	41	2	1127	3122	75	17	65	Pcone
5	1	1	1	41	3	1227	3112	75	38	79	|4563
5	1	1	1	41	4	1369	3121	131	20	89	STATE|QLD
5	1	1	1	41	5	1805	3094	56	38	81	03
5	1	1	1	41	6	2126	3110	21	40	8	a,
4	1	1	1	42	0	1954	3315	289	44	-1	
5	1	1	1	42	1	1954	3315	105	44	96	Page
5	1	1	1	42	2	2074	3316	49	34	96	56
5	1	1	1	42	3	2138	3315	43	35	96	of
5	1	1	1	42	4	2194	3316	49	34	96	97

Section 57

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                   12 JUNE 2018


4                        MCU18/0004 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR
                         ENTERTAINMENT & DINING BUSINESS - TYPE 1 (FOOD & BEVERAGE) AT 56 MAIN
                         STREET, KIN KIN
DOCUMENT INFORM AT ION




Author                           Coordinator Planning, Patrick Murphy
                                 Environment and Sustainable Development Department

Index                            ECM/Application/MCU18/0004

Attachments                      1.   Proposal Plans


         APPLICATION DETAILS

         Applicant                          Jodie Alice Williams

         Proposal                           Material Change of Use - Entertainment & Dining Business - Type 1
                                            Food & Beverage

         Properly Made Date                 1 February 2018

         Information Request Date           22 February 2018

         Information Response Date          30 April 2018
         Decision Due Date                  22 June 2018



         PROPERTY DETAILS

         Property Address                   56 Main St Kin Kin 4571

         RP Description                     Lot 5 RP 809995

         Land Area                          1754 m²

         Existing Use of Land               General store/post office



         STATUTORY DETAILS

         SEQRP Designation                  Regional Landscape and Rural Production
         Locality                           Boreen Point, Kin Kin and Cootharaba

         Zone                               Village Mix Zone

         Overlays                           N/A
         Assessment Type                    Code




                                                                                                  Page 57 of 97

Section 58

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   12 JUNE 2018


RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 12 June 2018 regarding Application No. MCU18/0004 for a
Development Permit for Material Change of Use for an Entertainment & Dining Business - Type 1
(Food & Beverage) situated at 56 Main St, Kin Kin and:
A.   Approve the application and a mobile post office in accordance with the following
     conditions:
           When Conditions must be complied with
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
           prior to the use commencing, and then compliance maintained at all times while the
           use continues.
           Approved Plan
     2.    Development undertaken in accordance with this approval must generally comply
           with the approved plan of development. The approved plan is listed in the following
           table and may be further amended by these conditions.

            Plan No.                 Rev.   Plan/Document Name                      Date

            Job number 15005 A1      C      SITE PLAN                               30.07.2017

            Job number 15005 A2      C      FLOOR PLAN                              30.07.2017

            Job number 15005 A3      C      ELEVATIONS AND SECTION PLAN             30.07.2017

           Nature and Extent of Approved Use
     3.    The use of new undercover dining area must not operate outside of the hours 7am –
           10pm and be used a maximum of three days per week.
     4.    Patrons in the new undercover dining area must not exceed 60 persons.
     5.    Patrons on the existing deck dining area must not exceed 40 persons.
     6.    The new undercover dining and link-way areas must be in accordance with the
           approved plan, with no more than 192m2 used for dining.
     7.    Service vehicle movements associated with the approved use (including loading and
           unloading) must not occur outside the hours of 6am to 6pm Monday to Saturday, and
           not at all on Sundays or public holidays.
           Noise
     8.    External speakers or amplified music are not permitted.
     9.    Refuse disposal, particularly glass bottles and the like, must be considerate of noise
           at all times.
     10.   Management must ensure patrons leave the premises and street frontage promptly
           after nightly closing time and do not mingle or otherwise cause noise nuisance.
     11.   Noise emissions from any new air-conditioning and refrigeration equipment
           associated with the development shall comply with the following requirements:
           a.   7am to 10pm: Background + 5dB(A)
           b.   10pm to 7am: Background + 3dB(A)




                                                                                  Page 58 of 97

Section 59

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  12 JUNE 2018


    WASTE
          Waste Disposal
    12.   The developer must provide waste storage and disposal facilities in accordance with
          Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
          and Industrial Premises”. The facilities must include an external impervious area
          correctly sized for all refuse and recycling containers and suitably screened from
          public places and neighbouring properties. A bin wash area is required with a cold-
          water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain
          outlet must be designed to prevent storm water entry to the sewerage system. This
          can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max
          0.5m²), or alternatively the waste area can be roofed, or any other design approved
          by Council.
    13.   Refuse containers must be provided in accordance with the requirements of the
          Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
          Regulation 2000, for the storage and collection of refuse.
    14.   Public bins must be provided to reduce littering. All bins provided must be for refuse
          and recycling and be decanted into the bulk bins by the site operators.
    ENGINEERING
          Site Access and Driveways
    15.   Sealed access driveways must be maintained from Main Street to all parking and
          manoeuvring areas of the development.
          Car Parking
    16.   A minimum of 5 car parking spaces must be provided and marked on the site and
          made available and accessible at all times while the use is open for business. The
          carparking must include in particular:
          a.   provision of vandal resistant public lighting with intensities to satisfy the
               requirements of Australian Standard AS1158: Public Lighting Code
          b.   1 disabled parking space/s within the total
          c.   dimensions, crossfalls and gradients in accordance with the relevant Australian
               Standard (AS/NZS2890.1:2004 for staff and customers, AS/NZS2890.6:2009
               for people with disabilities).
    17.   All car parking areas and access driveways must be maintained exclusively for
          vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
          Stormwater Drainage
    18.   Stormwater runoff from the development must be disposed of on-site without causing
          scour or damage to the subject site or any adjoining property.
          Earthworks and Retaining Walls
    19.   All earthworks and associated batters must be contained entirely within the subject
          site unless written permission from the respective landowner(s) is provided to
          Council. All earthworks must be undertaken in accordance with the provisions of
          Australian Standard AS3798: Guidelines on Earthworks for Commercial and
          Residential Developments.




                                                                                 Page 59 of 97

Section 60

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      12 JUNE 2018


            Damage to Services and Assets
      20.   Any damage caused to existing services and assets as a result of the development
            works must be repaired at no cost to the asset owner at the following times:
            a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                  immediately; or
            b.    where otherwise, upon completion of the works associated with the
                  development.
            Any repair work which proposes to alter the alignment or level of existing services
            and assets must first be referred to the relevant service authority for approval.
B.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

REPORT
1.    PROPOSAL
The application seeks to increase the amount of seating associated with the Kin Kin General
Store from 19 to 40 persons, develop a 30m2 undercover barbeque cooking area and 130m2 of
undercover dining area. The undercover dining area will be used for dining and functions for up
to 60 people. The proposal also includes a 62m2 link-way connecting the existing building to the
new undercover dining area, a 13m2 structure on the existing hardstand area for Australia Post
mail collection and a 13m2 shipping container is proposed for storage purposes. The total area for
all of the proposed structures is 248m2.
Documentation provided by the applicant advises:
      ……Looking at extending existing deck dining from 19 people to 40 people. This will allow
      extra Sunday Breakfast diners.
      The Kin Kin General Store also requesting new additional undercover dining for a
      maximum 60 people for back function barn area giving weather proof structure for diners to
      sit under. This area is for LIMITED Use. The limited use would be for Casual dining twice
      a week would fit 30 - 40 people every Friday 5:30pm - 9pm, and again for 40 -
      60 people every Sunday 12- 3pm. The third function service for the week would be for
      group bookings and would need to be flexible.
      Being either weekday or Saturday lunch or Saturday dinner, but will not exceed 60 people
      and will be one 3.5 hours service for the whole week.
An Entertainment and Dining Business Type 1 is a consistent use within the Village Mix Zone
which requires Code Assessment.
The matter is before Council as the applicant seeks a pro-rata application of the Infrastructure
Charges based on the limited time that the proposed new area will be used and variation to on-
site car parking requirements.
The following images detail the location of the site and plans detailing the proposal:




                                                                                     Page 60 of 97

Section 61

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA      12 JUNE 2018




                           Figure 1: Site location




                           Figure 2: Site location




                                                     Page 61 of 97

Section 62

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                 12 JUNE 2018




                           Figure 3: Proposed layout




                     Figure 4: Elevation of barn and link-way




                                                                Page 62 of 97

Section 63

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JUNE 2018


2.   SITE DETAILS
2.1. Background
A development approval for a service station, shop and dwelling was issued for the premises in
1993 (3B-3080). A further approval was given for an outdoor eating area in 1996 (3B-446). The
approval limited the floor area of the outdoor seating area to 50m2 and a maximum of 19 seats.
The following image details the approved plan for development approval 3B-446.




                        Figure 5: Approved plan for development approval 3B-446


The site currently operates as the Kin Kin General Store servicing the local community with a
range of grocery items and post office service. A restaurant/café also operates on site.
2.2. Site Description
The site is a square shaped lot situated within Main Street and is approximately 1752 m2 in area.
A building is situated in the north-west corner of the site. A deck to the front of the building is
adjacent to the front boundary. A separate building is situated to the rear of this building and
provides ablution facilities.
To the east of the main building is a concrete pad which provides an area for car parking. To the
rear of the concrete pad is a large open area which is surfaced by a combination of grass, paving
and concrete.


                                                                                    Page 63 of 97

Section 64

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JUNE 2018


2.3. Surrounding Land Uses
The site is surrounded by a mix of differing land zones and land uses. Properties to each side of
the subject site and properties on the opposite side of Main Street are all zoned Village Mix. The
Rural Settlement Zone applies to the land to the rear of the site, the Detached Housing Zone and
the Community Services Zone applies to properties further west of the site. The Rural Zone,
Open Space Recreation and Open Space Conservation Zones apply further afield. The closest
dwelling is approximately 50 metres from the proposed use area.
The properties surrounding the subject site are used as follows:
North: Residential dwelling
South: Rural Settlement zoned land of approximately 10 hectares in area, a dam has been
developed adjacent to the common boundary
East: Telstra land and privately owned land which has not been developed
West: Real estate agent’s office
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
   State Planning Policy;
   South East Queensland Regional Plan;
   Planning Regulation 2017;
   The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Regional Landscape and Rural Production Area of the SEQ
Regional Plan. The proposal is consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The following assessment benchmark from the Planning Regulation 2017 applies to the
application:
   SEQ Development Area
The proposal is for urban activity within the Regional Landscape and Rural Production Area and
is consistent with the assessment benchmarks contained in the Planning Regulation 2017 for the
SEQ Development Area which allows for limited commercial and retail activity.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against each of the following codes to the extent they are
relevant to the development:
   Boreen Point, Kin Kin and Cootharaba Locality Code
   Business Uses Code
   Landscaping Code; and
   Engineering Works Code

                                                                                   Page 64 of 97

Section 65

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      12 JUNE 2018


The Entertainment and Dining Business Type 1 is a consistent use within the Village Mix Zone.
The proposed use contributes to the commercial activity within the main street of Kin Kin and
caters to the needs of visitors and visitors to the area.
The form of the proposed barn style structure will not dominate the streetscape as it is setback
approximately 18 metres from the front boundary, has a modest height and is characteristic of
the rural style surrounds.
The application has been assessed against each of the above applicable codes. The pertinent
issues arising out of the assessment against the codes are discussed below:
Car parking
With regards to car parking the applicant advises:
        Requesting a relaxation of car parks as Kin Kin Village, many staff walk or ride bikes to
        work. Weekend junior staff get dropped off by parents. Functions will be encourage to
        participate in bus transport packages.
The existing development, pre the proposed additions, comprises approximately 133m2 of use
area within the building and 50m2 of outdoor dining, totalling 183m2. One off street car parking
space was required under the existing approval
The proposal seeks to increase the use area by an additional 218m2 attributed to the undercover
dining area, the link-way, post office and shipping container. The barbeque cooking area does
not contribute to the calculation of use area for the purposes of car parking calculation, being
excluded by the Driveways and Car Parking Code. In the Village Mix Zone one car space is
required per 20m2 of use area and therefore the development requires an additional 11 car
spaces.
Therefore, a total of 12 car spaces are required for the existing and proposed development. The
proposed plans detail 5 car parking spaces on the existing concrete hardstand and a disabled
space adjacent to the western side of the existing building.
There is currently low demand for car parking within Main Street and the surrounding area. The
proposed use will have limited impact on the surrounding area with sufficient on street car
parking available.
It is therefore recommended that the shortfall of car parking be waived as opposed to
contributions being obtained. The application was lodged on 1 February 2018 at which time the
formation of a contributions in lieu of car parking policy was in its initial stages. The car parking
policy recommends that contributions that would ordinarily be payable in the Kin Kin locality be
waived in principle and for the time being to promote business activity and job creation. In this
instance it is recommended that car parking contributions be waived to contribute to business
growth and job creation within Kin Kin.
Council’s Development Engineer has advised the proposed disabled space does not comply with
the relevant requirements. Accordingly, it is recommended that a condition of the approval be
included requiring the disabled car space to comply with the relevant Australian standards.
Noise
The introduction of an undercover dining area on the site introduces new noise sources. The
applicant advises that….
        There are no plans for music as such, but if any we may consider acoustic guitar. Not
        amplified. Our garden and planting will buffer any noise created by customers talking. We
        are looking one night a week, maybe 2 maximum, but our guests are early to leave. Our
        business closes doors at 10pm so we like them gone by 9pm….to allow the final clean up.
Outcome O20 of the Business Uses Code requires:
Development is designed and sited to avoid noise emissions that unreasonably diminish the
amenity of the area or surrounding uses.

                                                                                     Page 65 of 97

Section 66

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JUNE 2018


The Boreen Point, Kin Kin and Cootharaba Locality Code similarly seeks to protect the amenity
of existing residents.
The applicant was not required to provide an acoustic report as it was considered that the
proposed hours, nature of use and the separation of the proposed use area from the closest
dwelling (50 metres) ensures that suitable conditions can be applied to maintain the amenity of
nearby residents.
In summary it is considered that the proposed use and development are suitable for the site and
will not detract from the amenity of the local area as a result of car parking and noise.
Infrastructure Charges
The applicant has request that reduced Infrastructure Charges be applied based on a pro-rata
rate reflective of the amount of time the proposed areas are to be used.
The applicant has included the following grounds as justification for the reduced charges:
     The Kin Kin General Store also requesting new additional undercover dining for a
     maximum 60 people for back function barn area giving weather proof structure for diners to
     sit under. This area is for LIMITED Use.
     The limited use would be for Casual dining twice a week would fit 30 - 40
     people every Friday 5:30pm - 9pm , and again for 40 - 60 people every Sunday 12-
     3pm. The third function service for the week would be for group bookings and would need
     to be flexible.
     Being either weekday or Saturday lunch or Saturday dinner, but will not exceed 60 people
     and will be one 3.5 hours service for the whole week. This one flexible function for the
     week will be recorded in our Team Up Calendar that is currently accessible by all our staff
     and we are happy to give access to Noosa planning department where the weekly function
     will be clear in dates, times, and customer numbers for transparency.
     Total operating hours of café is approx. 77 hours a week Total new barn usage would
     total 10 hours a week.
     Total breaky/lunch/dinner services per week Total 15 - 16 food services. (open 7 days
     Breakfast and Lunch plus open one dinner service every Friday Night and once a month on
     a Saturday night.)     Total number of food services needed for new undercover dining
     is only 3 food services per week (Friday Night, Sunday Lunch and One other day.)
     We are requesting this new back area infrastructure fees be reduced based on usage as
     the business does not need the space during the week and other reasons listed below.
     Breezeway and BBQ not for under cover dining. The breezeway is for weather proof
     access between the two buildings when wet and windy.
     Deck and back barn area will NOT operate at the same time. eg Sunday Breakfast on
     deck only, followed by Sunday Lunch out the back barn area where tables are set ready
     for lunch.
     We are trying maintain current employment and future employment growth. Great training
     ground for local junior staff, great ways for mums to do a few shifts to top up income. We
     have had 10 trainees complete certificates and some starting trades.
     Our Current seating is excessive during the week, but more is needed on weekends when
     trade increases.
      In Kin Kin We do not have the ability to turn tables over compared to similar businesses in
     Noosa high traffic areas (eg Hastings St, Gympie Terrace, Other popular tourist spots). We
     are lucky to achieve 50 % bum to seat occupancy with current seating during the week,
     but need 3 x the seating on Sunday as locals and some tourists venture out to the quiet
     countryside. Long way to drive if we have no tables available. The Country drive and
     trails are a wonderful assets, but we need places to visit, a draw card. This will help ease
     congestion in peak tourism season. Clientele will be limited to drivers.

                                                                                   Page 66 of 97

Section 67

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       12 JUNE 2018


     Prorata use of dining will be up re enforced by way of gates and fenced off area only
     opened in allocated operation times. We do not need or want customers sitting out the
     back unless part of the 3 allocated times per week…… This restricted area will only work
     as the function or the two casual dining times in allocated times listed above.
     We are not just a shop, we are .......
         A place to pick up bread milk, groceries     (There are not many little shops left....there
           is a reason for that.)
         A community meeting place.
         Business meeting place.
         Elderly local lady's social group (they keep an eye on each other and quickly follow
           up is someone misses a Tuesday or Friday)
         Primary school children wait here for parents to finish work,
         Couples drop point for separated families.
         Local Pound / RSPCA .
         any dogs found end up here...locals always call us is any animals go missing
         any horses/ cows out.....you guessed it. call the shop! I must admit sometimes they
           have been our cows.
     The list goes on.
     Unfortunately the total size of this structure is considered undercover dining
     space. Because there is no walls......a large over hang is needed to protect customers
     from the elements. The edges of the undercover space is for driving rains and afternoon
     summer sun, not more tables. There is no allowance for this in current assessment.
The application proposes 248m2 of additional gross floor area which would result in an
Infrastructure Charge of $38,397.
The application will result in an additional 235m2 of additional impervious area resulting in an
additional charge of $2,373 towards trunk stormwater.
The total applicable Infrastructure Charge for the proposed development is $40,770.
In circumstances where a use is proposed to be used for limited hours a pro-rata rate has been
applied and a condition has been included in the development approval to limit the days of use.
In this instance it is proposed that the new dining area would be used up to three separate days
per week. On this basis this equates to 3/7ths of a week. 3/7ths of the full Infrastructure Charge
is $17,472.
It is recommended that the pro-rata application fee be supported as this in consistent with how
similar circumstances have been addressed in the past and will provide the business with the
opportunity to continue to grow and provide local employment within Kin Kin. A condition is
recommended which limits the use of the new undercover dining area to three days per week. If
the business were to seek to expand the number of days which this area is to be used the
approval would require amendment and an updated Infrastructure Charge would be applied.




                                                                                      Page 67 of 97

Section 68

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         12 JUNE 2018


4.     CONSULTATION
4.1. Referral Agencies
The application was not required to be referred to any Referral Agencies:
4.2. Other Referrals
The application was forwarded to the following internal Council officers:
     Development Engineering – car parking
5.     CONCLUSION & REASONS FOR DECISION
The application is for a consistent food and beverages use within the Village Mix Zone. The
proposed use raises no planning concern as the amenity of the surrounding area can suitably be
addressed by relevant conditions. The applicant’s request for a pro-rata application of
Infrastructure Charges is supported due to the limited use of these areas and waiving of
contribution in lieu of the shortfall in car parking to enable a commercial operation to continue to
grow and provide local employment opportunities in the hinterland.
The application is recommended for approval, subject to conditions.


Departments/Sections Consulted:
     Chief Executive Officer   x   Community Services                       Corporate Services
     Executive Officer             Community Development                    Financial Services
     Executive Support             Community Facilities                     ICT
                                   Libraries & Galleries                    Procurement & Fleet
                                   Local Laws                               Property
                               x   Waste & Environmental Health             Revenue Services

     Executive Services        x   Environment & Sustainable Development    Infrastructure Services
     Community Engagement          Building & Plumbing Services             Asset Management
     Customer Service          x   Development Assessment                   Buildings and Facilities
     Governance                    Economic Development                     Civil Operations
     People and Culture            Environmental Services                   Disaster Management
                                   Strategic Land Use Planning              Infrastructure Planning,
                                                                            Design and Delivery




                                                                                         Page 68 of 97

Section 69

ATTACHMENT 1




  Page 69 of 97

1                                                                                                 4                                                                6                               7                        ATTACHMENT 1
                                      ——                                                                                                                                                                                         Dale        __pignature | cneckea
                                             N    S                                                                                              PI       PRELIMINARY ISS!                                                         05.09.15        AW
                                                                                         bss                                                              PER                                                                       oO
                                         |               |                              DRIVEWAY,                                                 A       FOR BULDIIG APPROVAL                                                     25.10.15        AW
                                                                                                                                                  8       FOR BUILDING APPROVAL                                                    2810.15         AW
A                                     STREET CARPARKING.                                                                                          c       FOR BUNIDING APPROVAL                                                     3007.17        AW                   A
                                                                                                                                              EXISTING
                                                                                                                                             ORIVEWAY.                                                                          LEGEND
                                                                                                                                                                                                                                       pee ato
               —                        poor                                                 f-——-—-—-——                                   SS                     re                                                             AX.   Max
                                         !                                                                                                                      {          i       ee                                           OR     NORZONTAL
                                             DISABLED CAR                                                                                                       i                       ~                                       Mem?   REINFORCEMENT
                                             SPACE 4m WIDE                                                                                                     |                                                                 ST    HOLD DOWN
                                                                                        /                                                                                                                                      iss     STAINLESS STEEL
                                                                                                                                                                                                                                 Bh,   Sa ER
B                                                           |                                                 EXISTING CONCRETE HARDSTANO                     }                                                                  ="    GONSIMUGTION BREW                B
                                         |                                       &                                                                            f                                                                  ye    «UNDERSIDE
                                                                                 Ss                PROPOSED
                                         |                                      s                 CARPARKING,
                                                       ~    |                 =                                                                             t  PROPOSED MOBILE
                                                       2                       2
                                                       2                    &                                                                               7} POST OFFICE.
                                                                                                                                                           t
                                                                        ee                                                                                 i
                                                           |             / |           |      TO STAIRS: 1       2        3       4       5               |                                                                               BUILDING
                                                                        LILIA Li
                                                                                              ENTRANCE
                                         |                                                       | BEQAREA SEE CETAIL 777¢              ¢   7°      SN   ;  OWNERS DETAILS.                                                              APPROVAL
                                                                         -                       woo ce ner        e-                          =            NEW WATER TANK 10
                                                                               am                      s9UU       5          6600          /             '
C                                                                                                  ———                                           a                                                                                   — NOT FOR CONSTRUCTION             C
                                                                                              POPES                   SEE    2760       z             /
                                                                                      +7500                                                 YY                        Notes
                                                                                                                                              Ro
                                                                 7    3630            s         2                   |                       £6000              ~—~..._ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH RELEVANT CURRENT S.A.A. CODES ANO
                                                                                      X         S                     |        |       |                              STATUTORY AUTHORITIES REQUIREMENTS,
                                                             Vy             TLE 4        %|'©    3700 i    3700 e|                                    i               ALL CONSTRUCTION TO COMPLY WITH THE AUSTRALIAN BUILDING CODE REQUIREMENTS AND RELEVANT AUSTRALIAN
                                                                                                wo
                                                                            OILS.        St         es            1 |          |        J            |                STANDARDS.
                                                                            1  et]                                                                  i                 BUILOER MUST CHECK ALL BCUNDARY LINES & PEGS BEFORE COMMENCEMENT OF ANY BUILDING WORK, CONFIRM
                                         |                                                         |            | 2                                |                  ALL DIMENSIONS & LEVELS ON SITE PRIOR TO COMMENCEMENT OF ANY WORK OR ORDERING MATERIALS.
                                                              PROPOSED UNDERCOVER LINKWAY AREA.      —               2                             }                  ALL BOUNDARY CLEARANCES SHOWN ARE 10 BE VERIFIED BY BUILDER AT SETOUT AND PRIOR TO COMMENCEMENT
                                                                                                   '                                                                  CF BUILDING WORKS. ANY VARIATION OF SETOUT MUST REMAIN WITHIN COUNCIL'S MINIMUM REQUIREMENTS.
                                                                                             NEW SHIPPING                                         |
                                                                                                TAINER FOR             4	1	1	1	47	0	732	1352	2071	85	-1	
5	1	1	1	47	1	732	1352	4	85	92	|
5	1	1	1	47	2	1303	1370	76	50	0	Sioce
5	1	1	1	47	3	1419	1374	12	17	0	.
5	1	1	1	47	4	1773	1382	16	47	63	|
5	1	1	1	47	5	1887	1382	7	26	14	!
5	1	1	1	47	6	2110	1390	101	18	96	DIMENSIONS
5	1	1	1	47	7	2224	1390	40	18	96	TAKE
5	1	1	1	47	8	2276	1390	108	18	96	PREFERENCE
5	1	1	1	47	9	2396	1390	44	18	96	OVER
5	1	1	1	47	10	2451	1390	52	18	77	SCALE.
5	1	1	1	47	11	2532	1390	22	18	65	DO
5	1	1	1	47	12	2565	1390	33	21	65	NOT
5	1	1	1	47	13	2610	1390	51	21	91	SCALE
5	1	1	1	47	14	2675	1390	30	18	91	OFF
5	1	1	1	47	15	2716	1389	87	22	88	DRAWINGS
4	1	1	1	48	0	442	1420	2098	40	-1	
5	1	1	1	48	1	442	1420	290	40	0	ieeepraenmaaraan
5	1	1	1	48	2	1788	1428	3	23	88	|
5	1	1	1	48	3	2110	1438	87	18	67	DRAWINGS
5	1	1	1	48	4	2209	1438	20	18	93	TO
5	1	1	1	48	5	2239	1439	20	17	92	BE
5	1	1	1	48	6	2272	1438	82	18	92	CERTIFIED
5	1	1	1	48	7	2366	1438	22	18	91	BY
5	1	1	1	48	8	2398	1438	46	18	91	RPEQ
5	1	1	1	48	9	2455	1438	85	18	67	ENGINEER.
4	1	1	1	49	0	732	1451	2431	57	-1	
5	1	1	1	49	1	732	1454	4	44	67	|
5	1	1	1	49	2	1681	1451	5	47	86	|
5	1	1	1	49	3	1868	1482	144	26	34	7—PROPOSED
5	1	1	1	49	4	2023	1482	50	18	95	BARN,
5	1	1	1	49	5	2110	1486	65	18	66	ENSURE
5	1	1	1	49	6	2190	1486	28	18	96	THE
5	1	1	1	49	7	2230	1486	70	18	95	GROUND
5	1	1	1	49	8	2312	1486	48	18	94	LEVEL
5	1	1	1	49	9	2372	1486	51	18	94	FALLS
5	1	1	1	49	10	2434	1485	47	20	96	AWAY
5	1	1	1	49	11	2492	1486	46	18	96	FROM
5	1	1	1	49	12	2551	1486	28	18	96	THE
5	1	1	1	49	13	2592	1486	76	18	96	BUILDING
5	1	1	1	49	14	2679	1486	34	18	96	LINE
5	1	1	1	49	15	2725	1486	33	18	92	FOR
5	1	1	1	49	16	2771	1487	71	17	92	1000mm
5	1	1	1	49	17	2854	1486	91	18	94	PERIMETER
5	1	1	1	49	18	2958	1486	19	18	96	OF
5	1	1	1	49	19	2991	1486	29	18	96	THE
5	1	1	1	49	20	3032	1486	80	18	94	BUILDING,
5	1	1	1	49	21	3125	1486	38	18	95	WITH
4	1	1	1	50	0	1860	1509	769	40	-1	
5	1	1	1	50	1	1860	1509	11	40	54	|
5	1	1	1	50	2	2110	1511	29	16	92	MIN
5	1	1	1	50	3	2150	1511	39	16	92	FALL
5	1	1	1	50	4	2202	1511	36	16	95	1:10
5	1	1	1	50	5	2249	1511	21	16	95	TO
5	1	1	1	50	6	2280	1511	66	16	96	ENSURE
5	1	1	1	50	7	2359	1511	88	17	96	ADEQUATE
5	1	1	1	50	8	2459	1510	89	19	95	DRAINAGE,
5	1	1	1	50	9	2559	1510	36	17	94	MAX
5	1	1	1	50	10	2607	1511	22	16	94	1:1
4	1	1	1	51	0	1585	1515	1563	72	-1	
5	1	1	1	51	1	1585	1555	7	7	0	:
5	1	1	1	51	2	1650	1515	36	72	24	al
5	1	1	1	51	3	1728	1519	62	47	20	-
5	1	1	1	51	4	1854	1550	9	30	76	}
5	1	1	1	51	5	2110	1558	56	18	92	HOUSE
5	1	1	1	51	6	2178	1557	55	19	92	SEWER
5	1	1	1	51	7	2245	1558	106	18	92	CONNECTION
5	1	1	1	51	8	2363	1558	14	17	92	&
5	1	1	1	51	9	2387	1558	41	17	96	MAIN
5	1	1	1	51	10	2439	1558	82	18	96	LOCATION
5	1	1	1	51	11	2534	1558	20	17	82	TO
5	1	1	1	51	12	2565	1558	19	18	95	BE
5	1	1	1	51	13	2597	1558	96	18	95	CONFIRMED
5	1	1	1	51	14	2704	1557	38	19	95	WITH
5	1	1	1	51	15	2754	1558	52	18	95	LOCAL
5	1	1	1	51	16	2819	1558	94	17	96	AUTHORITY
5	1	1	1	51	17	2923	1558	49	17	96	PRIOR
5	1	1	1	51	18	2985	1558	21	17	74	1D
5	1	1	1	51	19	3017	1558	131	18	94	CONSTRUCTION.
4	1	1	1	52	0	1774	1582	1392	18	-1	
5	1	1	1	52	1	1774	1582	11	15	25	A
5	1	1	1	52	2	2110	1582	127	18	95	UNDERGROUND
5	1	1	1	52	3	2249	1582	67	18	95	SERVICE
5	1	1	1	52	4	2329	1582	94	18	96	LOCATIONS
5	1	1	1	52	5	2434	1582	31	18	96	ARE
5	1	1	1	52	6	2479	1582	116	18	96	APPROXIMATE
5	1	1	1	52	7	2607	1582	44	18	93	ONLY
5	1	1	1	52	8	2662	1583	13	17	90	&
5	1	1	1	52	9	2687	1582	66	18	92	SHOULD
5	1	1	1	52	10	2765	1582	19	18	94	BE
5	1	1	1	52	11	2797	1582	72	18	96	VERIFIED
5	1	1	1	52	12	2881	1582	22	18	96	BY
5	1	1	1	52	13	2913	1582	53	18	94	LOCAL
5	1	1	1	52	14	2979	1582	93	18	94	AUTHORITY
5	1	1	1	52	15	3083	1582	49	17	95	PRIOR
5	1	1	1	52	16	3145	1582	21	18	95	TO
4	1	1	1	53	0	1660	1572	125	34	-1	
5	1	1	1	53	1	1660	1572	50	22	95	7100
5	1	1	1	53	2	1775	1601	10	5	0	i
4	1	1	1	54	0	1617	1596	621	49	-1	
5	1	1	1	54	1	1617	1618	21	27	33	3
5	1	1	1	54	2	1844	1596	83	45	77	142800
5	1	1	1	54	3	2110	1606	128	18	91	CONSTRUCTION
4	1	1	1	55	0	1616	1635	1472	44	-1	
5	1	1	1	55	1	1616	1640	20	39	47	3S
5	1	1	1	55	2	1836	1635	11	40	0	}
5	1	1	1	55	3	2110	1654	75	18	95	DRAWING
5	1	1	1	55	4	2196	1654	79	17	96	SYMBOLS
5	1	1	1	55	5	2286	1654	44	17	96	USED
5	1	1	1	55	6	2341	1654	23	17	96	ON
5	1	1	1	55	7	2376	1654	36	17	96	THIS
5	1	1	1	55	8	2422	1653	77	19	24	DRAWING
5	1	1	1	55	9	2510	1654	35	17	96	MAY
5	1	1	1	55	10	2556	1654	33	17	93	NOT
5	1	1	1	55	11	2599	1654	21	17	93	BE
5	1	1	1	55	12	2633	1655	11	13	96	A
5	1	1	1	55	13	2656	1654	41	17	96	TRUE
5	1	1	1	55	14	2709	1654	147	17	94	REPRESENTATION
5	1	1	1	55	15	2868	1654	20	17	95	OF
5	1	1	1	55	16	2901	1654	47	17	72	ITEMS
5	1	1	1	55	17	2960	1654	21	17	96	TO
5	1	1	1	55	18	2992	1653	68	18	96	INCLUDE
5	1	1	1	55	19	3072	1655	16	16	92	IN
4	1	1	1	56	0	283	1666	2331	56	-1	
5	1	1	1	56	1	283	1666	18	32	92	E
5	1	1	1	56	2	1618	1672	19	14	60	+
5	1	1	1	56	3	1827	1678	12	44	52	H
5	1	1	1	56	4	2110	1678	89	17	90	CONTRACT.
5	1	1	1	56	5	2226	1677	53	18	96	REFER
5	1	1	1	56	6	2291	1678	21	16	92	TO
5	1	1	1	56	7	2323	1677	89	18	96	CONTRACT
5	1	1	1	56	8	2424	1678	32	16	96	FOR
5	1	1	1	56	9	2467	1678	84	17	92	SPECIFIED
5	1	1	1	56	10	2562	1678	52	17	93	ITEMS.
4	1	1	1	57	0	845	1713	2215	41	-1	
5	1	1	1	57	1	845	1733	69	5	0	a
5	1	1	1	57	2	1085	1713	21	39	10	SC
5	1	1	1	57	3	1124	1713	73	39	5	Se
5	1	1	1	57	4	1271	1713	143	39	7	ESTEE
5	1	1	1	57	5	1456	1737	18	5	21	NS
5	1	1	1	57	6	1772	1713	72	41	26	ed
5	1	1	1	57	7	2110	1725	71	18	96	PROVIDE
5	1	1	1	57	8	2193	1725	72	18	92	EROSION
5	1	1	1	57	9	2277	1726	13	17	92	&
5	1	1	1	57	10	2300	1725	82	18	96	SEDIMENT
5	1	1	1	57	11	2394	1725	76	18	96	CONTROL
5	1	1	1	57	12	2482	1725	111	18	96	STRUCTURES
5	1	1	1	57	13	2604	1725	21	18	87	10
5	1	1	1	57	14	2636	1725	91	18	95	PERIMETER
5	1	1	1	57	15	2739	1725	20	18	95	OF
5	1	1	1	57	16	2772	1725	45	19	95	WORK
5	1	1	1	57	17	2830	1725	44	18	96	AREA
5	1	1	1	57	18	2887	1725	34	18	96	AND
5	1	1	1	57	19	2932	1725	78	18	89	MAINTAIN
5	1	1	1	57	20	3022	1726	15	16	70	IN
5	1	1	1	57	21	3049	1726	11	15	70	A
4	1	1	1	58	0	1489	1743	1202	36	-1	
5	1	1	1	58	1	1489	1753	73	18	56	EMISTING
5	1	1	1	58	2	1573	1753	87	18	96	CONCRETE
5	1	1	1	58	3	1860	1743	30	36	12	ian
5	1	1	1	58	4	2110	1749	103	18	96	FUNCTIONAL
5	1	1	1	58	5	2226	1749	88	18	96	CONDITION
5	1	1	1	58	6	2326	1749	22	18	96	AS
5	1	1	1	58	7	2359	1749	83	18	96	REQUIRED
5	1	1	1	58	8	2453	1750	22	17	96	BY
5	1	1	1	58	9	2487	1749	29	18	96	THE
5	1	1	1	58	10	2528	1750	53	17	96	LOCAL
5	1	1	1	58	11	2593	1749	98	18	91	AUTHORITY.
4	1	1	1	59	0	1489	1753	622	48	-1	
5	1	1	1	59	1	1489	1778	56	18	95	WATER
5	1	1	1	59	2	1557	1778	47	16	75	TANK.
5	1	1	1	59	3	1915	1753	196	48	17	ie
4	1	1	1	60	0	360	1882	319	20	-1	
5	1	1	1	60	1	360	1882	124	20	92	ANTHONY
5	1	1	1	60	2	493	1882	14	20	92	F
5	1	1	1	60	3	515	1882	164	20	91	McDONOUGH
4	1	1	1	61	0	362	1917	2543	49	-1	
5	1	1	1	61	1	362	1917	108	46	96	BUILDER
5	1	1	1	61	2	811	1927	113	23	96	PROPOSED
5	1	1	1	61	3	939	1927	57	23	92	BARN
5	1	1	1	61	4	1011	1928	17	22	82	&
5	1	1	1	61	5	1041	1925	93	28	91	LINKWAY
5	1	1	1	61	6	1147	1927	56	23	96	AREA
5	1	1	1	61	7	1890	1920	123	46	96	PROPOSED
5	1	1	1	61	8	2016	1920	70	46	88	BARN
5	1	1	1	61	9	2089	1929	24	27	88	&
5	1	1	1	61	10	2116	1920	104	46	91	LINKWAY
5	1	1	1	61	11	2219	1920	70	46	95	ROOF
5	1	1	1	61	12	2847	1926	58	21	36	1.250
4	1	1	1	62	0	362	1960	2769	29	-1	
5	1	1	1	62	1	362	1960	50	21	94	BSA
5	1	1	1	62	2	420	1960	44	21	88	LIC,
5	1	1	1	62	3	472	1960	71	21	96	65515
5	1	1	1	62	4	1775	1971	9	15	65	B
5	1	1	1	62	5	1898	1960	44	21	89	SITE
5	1	1	1	62	6	1956	1960	54	21	89	PLAN
5	1	1	1	62	7	2670	1969	72	20	55	idles:
5	1	1	1	62	8	2848	1970	12	18	75	A
5	1	1	1	62	9	3097	1970	34	18	35	ae
4	1	1	1	63	0	283	1955	2926	72	-1	
5	1	1	1	63	1	283	1996	19	31	25	F
5	1	1	1	63	2	733	1955	3	67	80	|
5	1	1	1	63	3	809	1986	27	22	91	56
5	1	1	1	63	4	849	1982	66	27	91	MAINS
5	1	1	1	63	5	927	1986	84	24	92	STREET,
5	1	1	1	63	6	2653	1969	89	21	0	peton:
5	1	1	1	63	7	2862	1969	16	21	0

                                                                                                                                                                                                                                                          oS            F
                                                KIN KIN)  QLO   4571                                                                                                                                                                                  M           C
   t                                                                                                                                    Ps
        -          ar                      F                                                                                                                                                                               JOB NUMBER           DWG No. | ISSUE
    Use figured dimensions in preterence to scole. Verity PROJECT NIGEL GARDINER                     SHOWN ON THIS DRAWING              n3                                       NOOSA SHIRE COUNCIL             [AS|SHEET       1 OF      7  |Date.
                   |                                                                                 [| | [             ~T    [T     ~—T   [|   TT J           JT  4                  6                                                                8
                                                                                                                                                                                                                                                      Page 69 of 97

Section 70

Page 70 of 97

1                            2                                                           4                                                           6                             7                             8
                                                                                                                                                                                                                                   ©
                                                                                                                                  [RevNo [Revision note                                        SSCSC~*~C~C*di ate’ ~_—Signcturee | Checked |
                                                                                                                                     PI      PRELIMINARY ISSUE                                                    05.09.15      AW
                                                                                                                                      P2     PRELIMINARY                                                          19.09.15      AW
                                                                                                                                      P3     PRELIMINARY ISSUE                                                    510.15        AW
                                                                                                                                      A      FOR BUILDING APPROVAL                                                25.10.15,     AW
                                                                                                                                      B      FOR BUILDING APPROVAL                                                2810.15       AW
A               ANTHONY F McDONOUGH                                                                                                   c      FOR BUILDING APPROVAL                                                30.07.17      AW                 A
                BUILDER
                BSA LIC. 65515                                                                                                                                           7.9m TO SHOP WALL
                                                                                                                                                                  STAIRS
                                                                                                            ooo                                                       GARDEN                   900 HIGH TREATED H/W
                                                                                                            naa                                                                                RETAININING WALL WITH
                                                                                                            r——                  a                         TK                                 1000 HIGH BALUSTRADE
                                                                                                                oO                                 oO;     ,O                    Oo}
B                                                                                                           |                   5900               [200] PROPOSED BBQ AREA             1                                                           R
                                                                                                                                                                                       '
                                                                                                                                                     '      STAFF ONLY COOKING         '
                                                                                                            |                                  °     1    | AREA SEE LINKWAY           1
                                                                                              re |                                             S|    !      ENGINEERING AND            '
                                                                                           |             i  |                                  °)    1    | peta                       '                   PARKING
                                                                                                                                                     1                                 '
                                                 NOTE:
                                                 DROPPER FROM LINKWAY ROOF TO DISCHARGE    |             |  |                    10" Fail            ‘   |   SULION RAFTERED ROOF      | 7400
                                                 THROUGH SPREADER TO BARN ROOF. BARN       |             |   Ig                   <——                '                                 '
                                                 GUTTER REQUIRED TO BE DESIGNED TO TAKE THE =|           |   \2                                      '                                 '
                                                 EXTRA WATER FROM LINKWAY ROOF AS WELL AS.                  |                                        ‘    |                            '
                                                 THE BARN RUNOFF, DISCHARGE TO WATER TANK  |    ~~»      |                                           ‘                                 '
                                                 IN ACCORDANCE WITH COUNCIL SPECIFICATIONS |                |              LINK WAY                  '    |    C/                      '
C                                                                                          Ver)                                                s|    |                                                                                             C
                                                                                                                                               ms]   ot                                '
                                                                                           |              |                                          ‘|             4000               '
                                                                                                          «
                                                                                                                                                                                       t
                                                                                               -——-            Oo                                  Or      O concrere ionao            10
                                                                       cee                                  LAr                                   td Se                              bs   V i200 tig TREATED HW
                                                                                                             ae |                                                                  “S~_ RETAININING WALL
                                       [Oo                                  O                                  °                                 Q]       reuse 14 existing HARDWOOD TRUSSES Jere ES STS AT 1180
                                                                                                                                                          DOUBLED UP TO CARPORT ROOF.        200x50 WHALERS
                                        |                                                                                                            |    ENGINEER TO CONFIRM DETAILS           x
D                                                                                                                                                                                                                                                  D
                                        |                                            3                 BARN                                          |
                                                                                     oS
                                     =|                                              nH                                                           o |
                                                                                     eee eee eee                           eee eee OO
                            L™       |                                                                                                            *|
          eo        SKN                                                              S                                                                   Al
        |          -,     we            |                                           a|                                                               |
      /            \>         \                                                      +
E   /                          \        |                5900                               5900                                5900                 |                                                                                             E
                                \
    \           EXISTING WATER         lo __ — —                   —        = —— — _ _ Oe                                                    _*0)                                                                       BUILDING
     \          TANK                     OP                                                                    oP
                             J                                                              100                                                                                                                        APPROVAL
       \
         SNL        ee         WATER TANK                   (BY                 FLOOR              PLAN
                           7   DISCHARGE DOWNPIPES TO                                                                                                                                                               — NOT FOR CONSTRUCTION
              -         ~                   PROPOSED BARN & LINKWAY AREA                                                              PROPOSED BARN & LINKWAY ROOF                                                    1:100
                                                                                                                             B         FLOOR PLAN                                                         les:         A                   P41
F                                           56 MAINS STREET,                                                                                                                                          oeeles            ‘             ee           F
                                            KIN KIN  QLD   4571
                                                                                                                                                                                                            15005                A2           C
   ‘
                                                                                                                             PS
        -        oe                    :                                                                                                                                                                 JOB NUMBER         DWG No. | ISSUE
    Use figured di  in  :     te ‘ole. Verif
                                            PO.CT         we ene                             Som NS RAHN                                                           woxomcones                   —_[AS|SRRET | OF        Fpote
                  1                                                          3               | | |           |     [| [         [|    [TT J     J     |                6                             7                             8
                                                                                                                                                                                                                                  Page 70 of 97

Section 71

Page 71 of 97

7               m                ~                2               ow               >
        2¢|*
        #3 |                                                                                     oe2
         Z|                                                                                      Ss
        Ba),                                                                                     co x
        ag                                                                                       omo        ss
        32 |:                          [7                                                        og:
        aa!                                                                                      g   <x
     =) Fe]:                                                                                     a   a
         3 |!                                                                                    a   §
         2                                                                                           oO
         i                                                                                           =
         z                                                                                           2
                                                                                                     5
         ¥
         =
                                  7
        z     3S 8B               “UO
        i     s= 8                ©    >
        g     =2 %                >
                “ 9
              54 2                A
                m a                          oe
        z     am &                           2
        a     G7   &              m7         i.
                   cS             cr         8
        g          Zz            aun         ;
        3         =
        5          :             <
                   B              >
                   >              —sH
                                 a
        wn                                                                           7O,r7
                                                                                     Ysozo
                                                                                     anes
     | |g                                                                            Banae
        S                                                                            S258n
      | S                                                                             =Eus
                                                                                     PROBE
         I                                                                            2a                    *
        a                                                                             goxs
        3                                                                             sero
        S                                                                             Sas5
      | =                                                                        C     2°8
        2                                                                             WSS
        z                                                                              Zz:
        a                                                                              x Oo
      |                                [>                             oN
                                           2700                           3000
      | & a      *                                               WY               \
     :                                                          6                          og      =f
                                                                 mM                                       D
                 fp                                              =       5        SY       &e      22202
                                                                                   a
                                                                 4       ©        ew       83             é
                 <                                              O        -             A   ge      SESRRR| P
                 =                                               Zz      8             /   BS      @erese|<.
     -           3                                                       5	1	1	1	59	4	1787	1990	107	91	46	bef
5	1	1	1	59	5	1977	2013	42	53	58	&
5	1	1	1	59	6	2126	2015	161	47	12	Bae
4	1	1	1	60	0	494	1997	1752	76	-1	
5	1	1	1	60	1	494	1997	15	30	44	an
5	1	1	1	60	2	1875	2037	9	25	30	i
5	1	1	1	60	3	2004	2061	14	2	0	_
5	1	1	1	60	4	2126	2064	16	9	63	2
5	1	1	1	60	5	2169	2045	77	22	79	2222
4	1	1	1	61	0	484	2015	1798	109	-1	
5	1	1	1	61	1	484	2015	30	45	0	ee
5	1	1	1	61	2	1063	2047	92	18	14	TD
5	1	1	1	61	3	1787	2049	87	75	43	Sif
5	1	1	1	61	4	1977	2065	42	32	35	Ra
5	1	1	1	61	5	2128	2049	77	70	24	ceed
5	1	1	1	61	6	2230	2076	17	43	30	a
5	1	1	1	61	7	2269	2061	13	44	16	:
4	1	1	1	62	0	264	2033	2023	131	-1	
5	1	1	1	62	1	264	2033	25	70	64	|
5	1	1	1	62	2	492	2065	22	40	53	a
5	1	1	1	62	3	1022	2087	53	22	96	3000
5	1	1	1	62	4	1806	2072	46	92	54	HW
5	1	1	1	62	5	1979	2099	40	39	61	25
5	1	1	1	62	6	2126	2104	58	44	55	333
                                                                                                          |2
4	1	1	1	63	0	494	2108	1690	78	-1	
5	1	1	1	63	1	494	2108	20	15	63	g
5	1	1	1	63	2	1787	2121	61	65	40	SY]
5	1	1	1	63	3	1977	2136	42	34	84	38
5	1	1	1	63	4	2126	2147	58	19	39	EEE
4	1	1	1	64	0	493	2123	1526	104	-1	
5	1	1	1	64	1	493	2124	22	43	92	2
5	1	1	1	64	2	844	2123	16	61	23	Nn
5	1	1	1	64	3	1787	2145	26	82	15	i
5	1	1	1	64	4	1978	2172	41	12	29	m3
4	1	1	1	65	0	827	2183	994	65	-1	
5	1	1	1	65	1	827	2183	51	50	69	OO
5	1	1	1	65	2	1051	2200	18	34	77	g
5	1	1	1	65	3	1693	2218	50	19	5	rr
5	1	1	1	65	4	1796	2187	25	61	0	/]
4	1	1	1	66	0	306	2227	2013	64	-1	
5	1	1	1	66	1	306	2229	15	9	70	=
5	1	1	1	66	2	867	2227	12	29	33	|
5	1	1	1	66	3	1052	2235	17	34	40	2
5	1	1	1	66	4	2304	2276	15	15	85	5
4	1	1	1	67	0	259	2240	1577	83	-1	
5	1	1	1	67	1	259	2240	62	51	25	oz
5	1	1	1	67	2	1052	2269	17	38	58	8
5	1	1	1	67	3	1801	2300	35	23	82	20°
4	1	1	1	68	0	305	2293	574	37	-1	
5	1	1	1	68	1	305	2293	16	34	0	¢
5	1	1	1	68	2	837	2292	14	54	34	Mm
4	1	1	1	69	0	305	2328	574	71	-1	
5	1	1	1	69	1	305	2328	16	49	75	g
5	1	1	1	69	2	823	2337	56	62	36	7
4	1	1	1	70	0	305	2378	1619	88	-1	
5	1	1	1	70	1	305	2378	16	24	40	6
5	1	1	1	70	2	1319	2418	90	14	48	vooe
5	1	1	1	70	3	1672	2408	87	40	95	4340.33
5	1	1	1	70	4	1877	2397	47	69	36	I|
4	1	1	1	71	0	305	2404	1607	62	-1	
5	1	1	1	71	1	305	2404	15	7	53	=
5	1	1	1	71	2	820	2408	57	36	83	<
5	1	1	1	71	3	1319	2430	65	23	15	Raa
5	1	1	1	71	4	1901	2464	11	2	0	.
4	1	1	1	72	0	824	2447	1068	47	-1	
5	1	1	1	72	1	824	2447	57	35	94	>
5	1	1	1	72	2	1319	2451	86	43	0	=i<®
5	1	1	1	72	3	1830	2466	44	20	42	tt
4	1	1	1	73	0	1321	2485	38	19	-1	
5	1	1	1	73	1	1321	2485	38	19	68	y=
4	1	1	1	74	0	825	2491	584	41	-1	
5	1	1	1	74	1	825	2491	54	28	71	—
5	1	1	1	74	2	1319	2500	41	24	0	=’
5	1	1	1	74	3	1367	2495	42	37	0	ge
4	1	1	1	75	0	825	2523	657	74	-1	
5	1	1	1	75	1	825	2523	52	6	17	Dp
5	1	1	1	75	2	940	2525	86	20	81	—
5	1	1	1	75	3	1115	2538	172	31	44	mp4
5	1	1	1	75	4	1319	2527	90	48	50	e528
5	1	1	1	75	5	1441	2568	41	29	19	w
4	1	1	1	76	0	823	2539	586	61	-1	
5	1	1	1	76	1	823	2539	56	36	30	QO
5	1	1	1	76	2	919	2535	90	60	53	—
5	1	1	1	76	3	1319	2571	90	29	0	Aaoe
4	1	1	1	77	0	303	2569	2030	99	-1	
5	1	1	1	77	1	303	2594	22	17	54	~
5	1	1	1	77	2	838	2573	27	52	72	Zz
5	1	1	1	77	3	1033	2579	52	51	91	3300
5	1	1	1	77	4	1185	2583	73	51	64	|_|
5	1	1	1	77	5	1277	2569	10	62	84	|
5	1	1	1	77	6	1344	2586	138	47	3	522m
5	1	1	1	77	7	2294	2616	39	52	33	NY
4	1	1	1	78	0	300	2599	1182	92	-1	
5	1	1	1	78	1	300	2599	23	44	46	js
5	1	1	1	78	2	1187	2626	33	65	51	|
5	1	1	1	78	3	1225	2631	28	56	51	|
5	1	1	1	78	4	1277	2630	6	57	80	|
5	1	1	1	78	5	1345	2630	64	33	65	222
5	1	1	1	78	6	1440	2636	42	31	0	1EQ
4	1	1	1	79	0	303	2654	1179	66	-1	
5	1	1	1	79	1	303	2654	20	32	24	2
5	1	1	1	79	2	484	2654	21	28	0	g
5	1	1	1	79	3	1286	2686	1	7	37	||
5	1	1	1	79	4	1343	2668	66	52	76	288
5	1	1	1	79	5	1416	2664	32	62	25	|
4	1	1	1	80	0	303	2680	1332	48	-1	
5	1	1	1	80	1	303	2686	59	17	65	mic
5	1	1	1	80	2	488	2680	9	34	43	Qa
5	1	1	1	80	3	1346	2714	14	13	83	=
5	1	1	1	80	4	1619	2716	16	12	39	s
4	1	1	1	81	0	303	2689	1985	85	-1	
5	1	1	1	81	1	303	2700	61	19	2	m|O
5	1	1	1	81	2	484	2710	15	13	35	o
5	1	1	1	81	3	1187	2689	33	65	52	|
5	1	1	1	81	4	1225	2693	28	57	52	|
5	1	1	1	81	5	1270	2692	13	58	81	|
5	1	1	1	81	6	1344	2728	16	24	91	2
5	1	1	1	81	7	1453	2713	12	48	35	oO
5	1	1	1	81	8	1620	2730	15	22	68	=
5	1	1	1	81	9	2267	2759	21	15	0	o
4	1	1	1	82	0	303	2718	1984	91	-1	
5	1	1	1	82	1	303	2718	61	18	39	4/2
5	1	1	1	82	2	397	2723	33	9	73	—
5	1	1	1	82	3	484	2726	15	18	49	Ja
5	1	1	1	82	4	1211	2743	20	39	14	mo
5	1	1	1	82	5	1441	2751	30	39	34	Zz
5	1	1	1	82	6	1618	2755	18	36	91	=
5	1	1	1	82	7	2126	2789	120	20	12	sxposa|
5	1	1	1	82	8	2267	2777	20	25	79	>
4	1	1	1	83	0	303	2739	1979	106	-1	
5	1	1	1	83	1	303	2753	60	51	28	sz
5	1	1	1	83	2	396	2739	33	63	66	8
5	1	1	1	83	3	1019	2809	17	7	56	-
5	1	1	1	83	4	1180	2754	107	63	27	“1
5	1	1	1	83	5	1619	2801	17	44	17	z
5	1	1	1	83	6	2126	2799	156	46	0	eeeeeel”
4	1	1	1	84	0	305	2791	1941	86	-1	
5	1	1	1	84	1	305	2791	59	35	59	aa
5	1	1	1	84	2	396	2804	33	19	37	oO
5	1	1	1	84	3	602	2803	20	43	14	2
5	1	1	1	84	4	1020	2818	16	26	0	<
5	1	1	1	84	5	1187	2813	33	64	51	|
5	1	1	1	84	6	1224	2817	29	56	51	|
5	1	1	1	84	7	1277	2817	6	56	76	|
5	1	1	1	84	8	2129	2842	117	15	17	SEES
4	1	1	1	85	0	342	2829	1946	85	-1	
5	1	1	1	85	1	342	2829	22	32	24	*
5	1	1	1	85	2	484	2849	139	32	0	2212
5	1	1	1	85	3	685	2842	1	24	0	o
5	1	1	1	85	4	1019	2847	19	35	0	%
5	1	1	1	85	5	1203	2875	48	1	74	—
5	1	1	1	85	6	1278	2872	9	7	36	II
5	1	1	1	85	7	1777	2894	40	20	34	1
5	1	1	1	85	8	2268	2892	20	21	63	5
4	1	1	1	86	0	307	2871	1470	52	-1	
5	1	1	1	86	1	307	2872	16	9	88	~
5	1	1	1	86	2	529	2871	19	6	77	=
5	1	1	1	86	3	1724	2888	53	35	15	ne
4	1	1	1	87	0	527	2872	1755	73	-1	
5	1	1	1	87	1	527	2872	215	40	0	s|332
5	1	1	1	87	2	1202	2879	51	57	39	oI
5	1	1	1	87	3	2261	2916	21	29	9	:
4	1	1	1	88	0	602	2902	1680	66	-1	
5	1	1	1	88	1	602	2902	140	21	10	sm0c
5	1	1	1	88	2	1651	2911	53	45	95	3300
5	1	1	1	88	3	2267	2950	15	12	25	ela
4	1	1	1	89	0	342	2918	1945	72	-1	
5	1	1	1	89	1	342	2920	22	14	33	o
5	1	1	1	89	2	602	2918	20	39	42	2
5	1	1	1	89	3	646	2930	96	22	46	Dre
5	1	1	1	89	4	1021	2940	2	2	15	:
5	1	1	1	89	5	1179	2928	79	55	0	r—]
5	1	1	1	89	6	2126	2958	161	32	3	222222)\5
4	1	1	1	90	0	342	2938	1989	81	-1	
5	1	1	1	90	1	342	2938	22	36	70	5
5	1	1	1	90	2	602	2960	82	28	38	20°02
5	1	1	1	90	3	940	2965	315	45	38	[J
5	1	1	1	90	4	1277	2942	10	62	74	|
5	1	1	1	90	5	2267	2994	15	25	70	@
5	1	1	1	90	6	2304	3000	27	17	57	{00
4	1	1	1	91	0	159	2977	2129	93	-1	
5	1	1	1	91	1	159	2988	34	26	50	U
5	1	1	1	91	2	259	3000	26	17	72	Co
5	1	1	1	91	3	342	2993	21	33	23	|=
5	1	1	1	91	4	396	2977	40	49	51	a
5	1	1	1	91	5	602	2990	21	38	33	=
5	1	1	1	91	6	644	2990	39	51	65	=
5	1	1	1	91	7	708	2990	25	47	48	=<
5	1	1	1	91	8	1192	2999	94	51	39	Ld
5	1	1	1	91	9	1822	3026	30	39	68	10

»                2    S     @                                                                             a
©a        ~      a     g rc                                                                               S
                                                                                                          °
          wn                                                                                              x
®         o      4    2                                                                                   a
          So     _
ot          oO   dd                                              s                ou               >
2              “               m                LJ
oOo
“J

Section 72

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                      12 JUNE 2018



5                        132003.221152.7 PRE-REQUEST TO CHANGE AN EXISTING APPROVAL FOR
                         MATERIAL CHANGE OF USE FOR A DWELLING AT 12 PARK ROAD, NOOSA HEADS
Document i nformati on




Author                              Coordinator Planning, Patrick Murphy
                                    Environment and Sustainable Development Department

Index                               ECM/Application 132003.221152.7

Attachments                         1.    Proposal plans


            APPLICATION DETAILS

            Applicant                            G. Woolley C/ Max Barthow
            Proposal                             Pre-Request to Change to an Existing Approval
            Properly Made Date                   9 May 2018
            Information Request Date             N/A
            Information Response Date            N/A


            PROPERTY DETAILS

            Property Address                     12 Park Rd Noosa Heads Qld 4567
            RP Description                       Lot 54 RP 52918
            Land Area                            794m2
            Existing Use of Land                 Dwelling


            STATUTORY DETAILS

            SEQRP Designation                    Urban Footprint
            Locality                             Noosa Heads
            Zone                                 Detached Housing
            Overlays                             Natural Hazards Overlay – Landslide Hazard
                                                 Natural Hazards Overlay – Medium Bushfire Hazard
            Assessment Type                      Change to Approval


RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 12 June 2018 regarding Application No. 132003.221152.7 for a pre-
request response to change a Development Permit for Material Change of Use for a dwelling
house to include an expanded deck area at 12 Park Road, Noosa Heads and:
A.                       Agree to support the amendment of Condition 5 to read as follows:
                         5.   The maximum gross floor area for all buildings and structures on the subject site is to
                              be 198m2.
B.                       Agree to support the expanded deck area subject to the following additional Conditions 60
                         and 61 being included as follows:


                                                                                                      Page 72 of 97

Section 73

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          12 JUNE 2018


           Additional Conditions June 2018
     60.   Development undertaken in accordance with this approval must comply with the
           approved plans of development. The approved plans are listed in the following table
           unless otherwise amended by these conditions.
             Plan No.     Rev.   Plan/Document Name                                         Date
             CD 5.01      P1     Axonometric Site Plan, prepared by Tim Ditchfield          31.01.2018
                                 Architects
             CD 2.02      P3     Upper Floor     Plan,   prepared   by   Tim   Ditchfield   15.01.2018
                                 Architects
             CD 3.01      P3     West Elevation, prepared by Tim Ditchfield Architects      14.01.2018
             CD 4.01      P2     Section A-A, prepared by Tim Ditchfield Architects         15.01.2018

     61.   Minor pruning of the 3 x Lemon Aspen canopies in proximity to the deck extension
           works can be undertaken to facilitate the works. The pruning works must be under
           the supervision of a Level 5 Arborist and Council’s delegate and not result in the loss
           the foliage screening of the deck.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

REPORT
1.  PROPOSAL
The applicant has requested a pre-request response change to the existing dwelling at 12 Park
Road, Noosa Heads.
The proposal seeks changes to the development approval for a detached house to include an
addition to the existing upper level deck of the existing dwelling. The deck extension does not
form part of the deck previously subject to an appeal.
The deck addition is to be constructed of materials that match the existing deck and will result in
the decks width being increased from 1.70 metres to 2.91 metres.
The application is before Council as there was a previous Court appeal in relation to an earlier
change application involving a deck. Figure 1 shows an aerial view of the subject site.




                                       Figure 1 - Subject site

                                                                                         Page 73 of 97

Section 74

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JUNE 2018


Figure 2 below shows the deck’s location and Figures 3, 4 and 5 show construction details and
elevations of the proposal. Notably, the proposed lift access walkway does not form part of this
application and is being assessed under a separate application.




                                Figure 2 – Location of deck extension




                                 Figure 3 – Details of deck extension




                                                                                    Page 74 of 97

Section 75

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               12 JUNE 2018




                          Figure 4 – Western elevation of deck extension




                          Figure 5 – Northern elevation of deck extension

2.   SITE DETAILS
2.1. Background
The Planning Scheme limits dwelling houses on 6 – 14 Park Road to a maximum gross floor area
of 150m². This maximises the retention of vegetation on Noosa Hill and maintains a green back
drop to Noosa Main Beach.
On 29 October 2004 Council issued an approval for a dwelling. The following changes to the
approval have been issued:
   9 October 2006 - allowed a tree to be removed


                                                                               Page 75 of 97

Section 76

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   12 JUNE 2018


   9 August 2006 - permitted the sewer and stormwater lines to discharge to Park Road rather
     than to Allambi Rise
   27 September 2007 - approved a 50m² extension to the dwelling bringing the total gross
     floor area to 198m2.
   6 September 2017 – approved retaining wall and unroofed deck. Following Council’s
     decision, an appeal was lodged with the Planning and Environment Court on 20 September
     2016 by the applicant. The matter was latter resolved between the parties and confirmed
     by Judgment of the Planning and Environment Court on 1 November 2011 with the deck
     setback 1 metre from the front boundary.
In April 2018 Council officers became aware that works for the lift access walkway had
commenced at the site without a planning approval. The works relate to piling for an underground
tunnel to access a proposed lift shaft. These works are subject to a separate application.
2.2. Site Description
The site contains an existing dwelling nestled amongst the vegetated steeply sloping lot (approx.
30% slope). Vehicle access is from 9 Allambi Rise via an access easement.
2.3. Surrounding Land Uses
Immediately to the north is a detached dwelling accessed from Allambi Rise. Further to the north
with frontage to Park Road are units that are considerably elevated above Park Road and
accessed from an Allambi Rise ‘service’ road.
Immediately to the south is a detached dwelling owned by the applicant. This dwelling has direct
vehicle access to Park Road from a basement garage which is within the Park Road setback
area. Further to the south are detached dwellings, unit blocks and mixed uses fronting Hastings
Street.
To the west across Park Road is Noosa Main Beach and units fronting the beach.
3.   STATUTORY PROCESS
The applicant has requested a pre-request response to make a minor change to a development
approval under s78 of the Planning Act 2016. An application for a minor change to a
development approval can only be made in circumstances where a change would constitute a
‘minor change’. The proposed change to the development approval requested by the applicant is
determined to constitute a minor change on the grounds that:
   the change would not result in substantially different development as the use remains the
     same as that approved and the scale and bulk of the development remains generally
     consistent with the current approval. There are no new uses proposed that would create
     different or additional impacts; the change does not include prohibited development;
   the change would not require the application to be referred to an additional referral agency
     or cause a referral agency to have regard to new mattes prescribed by regulation; and
   the proposed changes do not vary the level of assessment;
4.   ASSESSMENT
The applicable planning instruments that Council must have regard to are:
      State Planning Regulatory Provisions;
      State Planning Policies; and
      2006 Noosa Plan.
The most recent amendment was considered consistent with the higher order State Regulatory
Provisions and Planning Policies. The proposed design modifications will not substantially
change the existing approval and are still consistent with the higher order provisions.



                                                                                  Page 76 of 97

Section 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JUNE 2018


The primary issue which requires consideration relates to Condition 5 of the existing approval
and the potential for the proposed development to impact adversely on the treed backdrop to
main beach. The proposed impact on existing vegetation is the critical element requiring
assessment.
Under the original approval for the dwelling, the Noosa Hill Development Control Plan limited the
building to a maximum gross floor area of 150m2. This requirement did not carry over to the
Detached House Code of the Noosa Plan initially, with the Noosa Plan instead including a site
cover limit of 150m2. These provisions in the Noosa Plan were amended at some point to again
include a maximum gross floor area requirement of 150m2.
The existing dwelling house has a site cover in excess of 200m2 and a gross floor area of 198m2
as the house was enclosed partly underneath when the maximum site cover provisions applied.
Condition 5 currently reads:
5.   The maximum site cover for all buildings and structures on the subject site is to be 150m2.
The current amendment will increase the site cover of the development by an additional 10m2.
The proposal complies with the current Noosa Plan requirements with regards to site cover,
however does not comply with the existing condition limiting the development to 150m2 of site
cover.
Specific Outcome 11 of the Detached House Code of the Noosa Plan relates to site cover and
states:
     The site cover of buildings and other roofed structures—
     a)    is of a scale that is compatible with surrounding development;
     b)    does not present an appearance of bulk to adjacent properties, roads or other areas
           in the vicinity of the site;
     c)    maximises the retention of existing vegetation and allows for soft landscaping
           between buildings;
     d)    allows for adequate area at ground level for outdoor recreation, entertainment,
           clothes drying and other site facilities; and
     e)    facilitates on-site stormwater management and vehicular access.
Specific Outcome 13 of the Detached House Code of the Noosa Plan relates to Gross Floor Area
and states:
     The gross floor area and bulk and scale of buildings and other roofed structures—
     a)   has a low site impact to maximise the opportunity to retain natural site characteristics
          such as native vegetation and natural landforms; and
     b)   maintains the safety of people and property from the risk of landslide and bushfire
The proposed development accords with Specific Outcomes 11 and 13 as:
   The proposed increased deck area will not present an appearance of bulk to adjacent
     properties and other areas;
   Limited pruning is required to existing vegetation adjacent to the deck and this vegetation is
     screened by additional vegetation to the front of the site;
   The development will remain consistent with surrounding development.




                                                                                    Page 77 of 97

Section 78

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      12 JUNE 2018


The impact of the proposed development on existing vegetation has been reviewed by Council’s
Environment Officer who advises:
     Minor canopy pruning of three planted Acronychia trees (Lemon Aspen) will be required to
     enable the construction and use of the proposed deck extension. It is considered the
     pruning works will not impact on the health of the trees and their contribution to the
     screening of the works will not be impacted upon. Suitable conditions can be applied to
     ensure the proposed works do not cause undue damage to the trees.
The following images details the vegetation adjacent to the existing deck and the view towards
the subject site from main beach Noosa Heads:




                           Figure 6 – Northern elevation of deck extension




                  Figure 7 – View towards subject site from Main Beach Noosa Heads


                                                                                     Page 78 of 97

Section 79

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         12 JUNE 2018


5.     CONSULTATION
5.1. Referral Agencies
The application was not required to be referred to any Referral Agencies.
5.2. Other Referrals
The application was forwarded to the following internal Council officer:
     Environment Officer
6.     CONCLUSION & REASONS FOR DECISION
The application seeks a pre-request response to make changes to the form of the development
with an existing upper level deck being extended. The proposed changes are minor and the
development remains generally consistent with the existing approval. No concerns are raised
with respect to the deck’s impact on existing vegetation on site. The application identifies conflict
between a condition of the existing approval and the Noosa Plan. It is recommended that this
condition be amended to reflect the approved gross floor area of the existing dwelling.
It is therefore recommended that Council support the proposed changes to the Court order.

Departments/Sections Consulted:

     Chief Executive Officer       Community Services                       Corporate Services
     Executive Officer             Community Development                    Financial Services
     Executive Support             Community Facilities                     ICT
                                   Libraries & Galleries                    Procurement & Fleet
                                   Local Laws                               Property
                                   Waste & Environmental Health             Revenue Services

     Executive Services        x   Environment & Sustainable Development    Infrastructure Services
     Community Engagement          Building & Plumbing Services             Asset Management
     Customer Service              Development Assessment                   Buildings and Facilities
     Governance                    Economic Development                     Civil Operations
     People and Culture        x   Environmental Services                   Disaster Management
                                   Strategic Land Use Planning              Infrastructure Planning,
                                                                            Design and Delivery




                                                                                         Page 79 of 97

Section 80

ATTACHMENT 1




  Page 80 of 97

ATTACHMENT 1

                                     Existing House»                    il              fi
                                                      pay                     y            JP tip
                                   Proposed Lift ——                                    <9
                                   Subject to Sepang    /          ay       EP |               existing timber deck to be
                                   Application—james's                          ee             extended to 2910 wide
                                           KE                             es                   (Roof not extended)
 Proposed lift access              oe                   i
walkway entrance             ofS he?}—_~—n
 Subject to Separate      A\\                ——          ~_       >
                        ¢    “a                   ee   a        Sie
 ne           et             «MIN                SS          —_          Approved timber terrace
    lication             ae,                         =    ~
             cA    \ a     Se
  \          \  a    :       y}  a Ka        SY
   \      *   , NY          I     ~~ \   ——       >                                                         Pi 310118 DESIGN
    \      “oO               ))       Kae                                                                   a
            F     SSX.       Sj) ~—™_S                                                                      Tim Ditchfield
        \     »      A>     (rs                                                                             *aj—      architects
        \      %       WAS                                                                                         es
          Ne    y     a ye                                                                                   oar 6s con Feo Sts as8 Wt.
                Oo     NV                                                                                  te
            \                                      AXONOMETRIC SITE PLAN                                          ne
                                                                                                            Additions to
                                                   NOTE: Vegetation not shown for clarity.                 ae Roed
                                                                                                            i
                                                                                                            DESIGN STAGE - LIFT
                                                                                                            AXONOMETRIC SITE PLAN
                                                                                                            = ea O°
                                                                                                            i727     CD 5.01 Pt

                                                                                                                                 Page 80 of 97

Section 81

Page 81 of 97

;                                                 prize
                  ¢                                       ?
   £              ’                                      ¥
                             an         inva                 or                       e
  1                                       Oé
                    sf MV                                                             ,
                   i]    Z 2
                rT                  \f                             “er   %
            </                       MS,           ie               *      eS
                                                                           RESET
                    .                 |           mcroe               gw             \Lay       A,
                    ¥ EXISTING                    BACK. FILL AND 000;200d ||!" fT oe            ST i
                      DECK            __EBOPOSED OPEN LANDSCAPE       PV Noa wes
\                  Ne                  am BELOW—— OVER TUNEL   ,     7  SSS in pill \B
                                       ae               =     Sore                             ———
                                                Pap ancareucannaree SSS]   2      hes    Ae /§
            SE,                   i                    ne     ==               —
          / rs                         >          mee                 eS                        HE
                                          :                   = SS S See,
.                                       OO                    ——      Se =                   ee            _—
    Proposed New Extension to existing deck only. ps2        ——     ——————————      = ely      HTS
    Landscaping subject of separate application   eastING DECK peu GL                er} ‘i H        NOT FOR CONSTRUCTION.
                 oe]                                          S| AWN | 4                               ss eer
                 ©                                            SS                 |  OSS           ES
                        Y /                       PROPOSED SSS]                               \f 5 = ee
       /                                         EXTENSION    ===                   eee       TT  EE ee
     Lf              JN                   .             “>      LS =nz                 (|         —  Tim Ditchfield
                                                  Boor        = Ora                               —
      /                <=   eT       par ye x                   ~    |           lat a            — i ae Mneicarne
      P                  6                ‘  R                       :     ———]] 2 FS           .—          ar
               Nay             \/           if                  vy    ]S_SSa         2 tl       iE fod
     |                                     Ve                         ——— S38 ot                  | —_————
    |                 PA,                                         6    SS =                 |   re
                                          KE                          ——       7 Sel            1 oes Gwocuer
    /                                     NS).                   >  |\     = fa)  lest          } 2 [= Aaditons to
      |}                                 AIO W229!          3    r  ) /           aH            pat 42 Park Road
   /                  SF                -  MN rz            See   JT                  games|      = Noosa Heads
   /                /                                <                     i cal    |   :   of  =           7
  /                iif    g                  .       |         7 30         i,    ui     ( AUS       Gs cae Se
   if              iy     x                   i—-H           i       00° 3q;            de NENT Foor
                                                                                                           Page 81 of 97

Section 82

Page 82 of 97

|
              |                      ,        ath 4
              Cie                   SB iron t,!                |
              eS                TS tae
               of  }        PAS W   23)  a See rae a  por  7       —
            3 be A er ey             RS Adofeae” Fray) ° oe |  |
              Se Ny    e   ¢ , Se    yt    2 On   yp  ©
               es y,  3     ON a HES aoe | I             |     |
              REE | (| en”                        pF     tl |!
              |                                  |
              Ries             Neuer       ella
          = ae DISK SOR bapa                   |         Io
            Y_ [Pp yy         SF    Be \ pees
               yr) VA  ~~"      NiN@eae me     I
          |   pe ASSO AR           Se 8
          |. CRG SRR Ri     Se                          —
              | bet     Gd   bY    ee               4) S|
                        Ad       day,         | Tal    l
             PES are Pry: poe ) ay i) (iF ie ee hy oi ||         |
             “Fg ae ORO!       Dts ;                        ay
              a eS      Ru)    wines       i | fea T_
              YA)  Ses            Pr        a       |         wil
              SOG Op)        J) = os
              iN ON PT (YOK) Hen ZA i        ee     — oo
              SCA          SANS         |||                    —
              wit ei        ee és           wr            a
              ie Wee                 Nt     tH) |}           a]
              Ale       Pane         AV")   lisse  r |   tt |-—
                 WE         zasa  [——3      ey        | |
                   aS3      3 ae         —               Pt
              ee            ee           7 1
              |    228      22 Baa        cn           |
                   356      Re Oe        a +             | |
              |    RES      3 a3         Re            | |
                    a       og 42        a               th |
              |             $3 3¢)0——| ie              |      th
                            2  asf       Ban) LUN        YT CO
              T             2 8        LL               , a
              '                 233)     7       = 1
                                8 $8    TF       TT]   / Hl
              |                 eek                    ot}
              T                 eas                     (sali   |
              | oo              452           LL          =<     —
                                2s         _       _    SES
             alle               sgh      /i    It        |     =        astern
     sD      5/5                a        gO ;         Re
             =| 2               gesi/    Ff   ae       z
     ig      dia                aa)      2    SE      88       :
     Sas                                 ob   ge      ob!
                                => a          Cc
     ant                        sap      OOP          UT
     *        i                    .     :    al |    |  |     |
      <i                                 Poh          dd
                                                      ||       |
    aa gi]z99 209 23                     |     | |
    Saga NE len         axle                          pt!
      zjm2 zz 3 8  iss    Hea
      spa 82 5 &   eek  7S |etils 288
~     S|>2 ea      zt     ili 222
9   op alee    .   af   Ol love
o   |e 15          ee oD. pl ges
c       2c           2  =    3
o   |=              | pos i  “ohn
ve                 meal       as
                      2.2) i
<.                 wi B/E
~/

Section 83

Page 83 of 97

!                                                                         |                |         |      |               <
                                                                                                                           TT      T         !
 _      —-msm —                                                                |}                         Lay)               il         =)
       :                                                                                          ae a :               |  EEEEI |       —y
                                                                                                     7-H BERE             Se See        —
 —4— Swe                                                          EY                =            a =e                     SSS                l-
                                                                                                 AS SBReReS       =       SSSSS         EA
 TFT TRS           EMMY            TTT TT TT TT                              AE                PE Sees            Bo                      1   |-
                                                                         —           SS      | SSS S| =               yr
                                                                         LE                  JARS ES See Bee                    |  r
                                 BLOCKWORK WALLS                     Ss  i      4   ESESE4ESE4 4  4     EFI BA IE %
                                wTH Roc CLADOING               yc    4a             SSSR          Ae    Ea                      |         Tl
 — _ | _   _esgozsovine                                        (     ay  IIL |      SSS      SEE Eas?                 iw |
                                                                     Lh        dl   EESSS RSA         Se
_         __RL#+29.720LIFTSTOP    el     —s—s—‘“Cs™s—s—CS      NV Oo eee eee SEE EE                                   7
                                8.0m ABOVE NATURAL                   Tee leer _— Tmt,                                  |        | |
                                       GROUND                        Bo ODEs         ESEEEHE| -     | UN
                             LINE AT BUILDING'S FA ryt               SCS                                IV            |         |
                                                           Rabo |=        ee         BEER SBE)          WZ
                                                           (KERS |                   SRE RSHel    |       y                     |
                                                  CU       EC | ROSS eeOS\          |S ECT
                                                       /(| ,         KA wei Be EX | \ oop             oh
Proposed New Extension to existing                     |   iN        COW                     FE                       | |       | |
                                                            )        Lae ots          >]
deck only. Proposed Lift / Lift Shaft,             ae a      Ne      i ENE         S        Ac | ||     ||                      u
Access Tunnel and Landscaping                           ay           rs i ae                 |          |             |
subject of separate application  atone aS.                           ie re      | LL             |                    |
   i             icati        R                                      Ki   yee
                                     STRUCTURE                        Ge                    | |         | |
                                                 a       SiS       fo      Oe                    |                    u
                                  excavarionrs          LINER Be oo                         Hoy
       |                                         Oo     IPERS Wie     MOOS,         ||      | |
                                   cronouer      |NCogl\h ae Pt                                  Vi
                                       SECTION , ATEN Pr            Ly   CLEA,                          7
                                               Sa                     1s                    ||
                                                 COA               Z   Lok ZK
                                           [6:0            sey                      ypu
       |                                SE              ZG        ayy               !       u                                        ce fenty snug.erorromiron
                                         FE RLY
                                        re                         G                                                                 =o ee
                                       iS                       Be                 ||                                                aeeheatcnansmes
              EXISTING DECK                      Co            i.         “i        RL #18.110 LIET STOP                            “Tim Ditchticld
            RL +17.610           ZOOL                             <a          a     tesco urrsror___________ _                       Tim Ditchfield
       |                                                        3                                                                    “Bp       eee
                                                                   meewasen                                                           ee          ty
                                                                ad    |       |                                                      BArch. B Design Studies. .RALA Reg No 002195
                                   GROUND LINE AT                  +            ”                                                    Client
                                   BUILDING'S FACE                  oO
                                                                   S                                                                 G. WOOLLEY
       |                                                                                                                            ‘Additions to
                                                                                                                                    12 Park Road
                                                                                                                                     Noosa Heads
                                                                                                                                     Drawing
                                                                                                                                     DESIGN STAGE - LIFT
                                                                                                                            4        SECTION A-A
                                                                                                                   Preliminary % 23           =
                                                                                                                   NOT FOR CONSTRUCTION. 1727 Cb 4.01 P2
                                                                                                                                             Page 83 of 97

Section 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                         12 JUNE 2018



6                        MCU16/0144 - REPRESENTATIONS TO CONDITIONS - DEVELOPMENT PERMIT FOR
                         MATERIAL CHANGE OF USE OF PREMISES RETAIL BUSINESS TYPE 2 SHOP AND
                         SALON AT 1 KINGSGATE DRIVE, TINBEERWAH
DOCUMENT INFORM AT ION




Author                              Development Planner, Lisa Pienaar
                                    Environment and Sustainable Development Department

Index                               ECM/ Application/ MCU16/0144

Attachments                         Nil


         APPLICATION DETAILS

         Applicant                               MA McFarland

         Proposal                                Representations to conditions for Development Permit for Material
                                                 Change of Use of Premises - Retail business Type 2 - Shop & Salon

         PROPERTY DETAILS

         Property Address                        1 Kingsgate Dr Tinbeerwah Qld 4563
         RP Description                          Lot 63 RP 200339

         Land Area                               10,080m²

         Existing Use of Land                    2 x Dwellings, large shed and restaurant named as ‘Orange on
                                                 Sunrise’

         STATUTORY DETAILS

         SEQRP Designation                       Rural Living Area

         Locality                                Cooroy and Lake Macdonald Locality

         Zone                                    Rural Settlement

         Overlays                                Natural Hazard Overlay – Bushfire - Potential Impact Buffer and High
                                                 to Very High Potential Bushfire Intensity
         Assessment Type                         Impact



RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 12 June 2018 regarding representations to Application
No.MCU16/0144 for a Development Permit for Material Change of Use for Retail Business Type
2 Shop and Salon situated at 1 Kingsgate Dr, Tinbeerwah and approve the change to Conditions
4 & 13 as follows:
Shop (café known as Orange on Sunrise)
4.                       The approved use must not operate outside the hours of 4.30pm – 9.00pm Wednesday to
                         Sunday, excluding public holidays, apart from food preparation. Preparation on these days
                         may occur from 2.30pm – 4.30pm, with no service to customers during this time.
13.                      Noise emanating from the premises including amplified or non-amplified noise and patron
                         noise must not exceed 35dB(A) LAMax,adj,T, when measured at the boundary of the
                         business.


                                                                                                         Page 84 of 97

The text continues on section 85.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.