Skip to the record
Every meeting, every word.

Council archive · source document

2025 26 Jirrima Cres - Noosa OPW app with attach · OPW20/0167

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Callaghan & Toth
  Civil, Environmental &
  Hydraulic Engineers


[OCR of page images]
 

 

 

——

  
 
  
  
  
 
  
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
  
   
 
 
 
  
  
 
 
 
 

SEDIMENT CONTROL LEGEND:

P_s SEDIMENT FENCE TO STD DWG ESC-04 & 05

®
—

ee

FILTER SOCK KERB/INLET FILTER TO STD DWG ESC-03

DIRECTION OF SEDIMENT FLOW/FINISHED ALLOTMENT FLOW

ROCK FILTER DAM INSTREAM TO IECA RFD-03 & RFD-04

 

SEDIMENT & EROSION CONTROL CHECK LIST

 

 

 

 

 

 

 

 

 

 

 

LOT 10
SP159615

STRAINER WIRE
a fey TOP & BOTTOM
FILTER FABRIC FIXED TO FENCE
AND EMBEDDED INTO
0.5 GROUND MIN. 200mm

PROVIDE OVERFLOW WEIR 0.5 WIDE

 

 

o2f [LOW WHERE BACKUP FLOW IS
* LIKELY TO OVER TOP WEIR

 

03
Ly STAR PICKET

 

SEDIMENT FENCE DETAIL

( Callaghan & Toth )

 

 

 

 

 

 

 

 

 

 

 

Alexander David Toth 6069 ISSUE MANAGEMENT COMMITMENT Civil, Environmental &
NAME RPEQ OBJECTIVE / TARGET Comply with all statutory regulations and maintain Hydraulic Engineers
them during earthworks/construction. PO BOX 2305
Comply with the erosion and sediment control plan. NOOSA HEADS 4567
28/09/20 ¥ iL 1.16/90 Goodchap Street
SIGNED DATE => Phone 54749081
MANAGEMENT STRATEGY Site foreman to identify and check direction of storm water www.callaghanandtoth.com.au
land flows as shown on plan. Provide barriers and other designed | MP datum AHD DERIVED
measures shown on the plan to intercept storm water flows drawn MP
at the end of table drains, and intercept sediments checked | ADT | Origin (B.M.) PSM 152523
before reaching gullies.
approved
TASKS / ACTIONS Erect sedimentation barriers as shown on the plans SURVEYED BY
before commencing earthworks or drainage improvements. MAX WATTERSON & ASSOCIATES
Place rock weirs in table drains as soon as the drains
are cut. —__
a
q . . project
PERFORMANCE INDICATORS | Site foreman to check that sediment fence and rock weirs
are trapping the flows after rain. Ensure no bypass occurs. PROPOSED ACCESS DRIVEWAY ATI
FREQUENCY / DEADLINE Site foreman shall monitor performance and repair damage 26 JIRRIMA CRESCENT
after every storm until grass is established. Sediment shall COOROIBAH
be removed before it reaches overflow level.
LOT 78 V J
RP136461 RESPONSIBLE PERSON The Principal Contractors foreman shall be (aa
i

responsible for inspections.

 

REPORTING / REVIEW

Site Foreman to advise workers: if they notice any
barrier requiring repair, report it to foreman.

 

 

CORRECTIVE ACTIONS

 

Site foreman is to repair any damaged barriers
daily. Replacements are to be purchased as required.

 

LOT 78
RP136461

 

M. PAGE & D. STUART

———$ dd

i.
title

EROSION & SEDIMENT CONTROL
PLAN

Nc
(SN

LOT 78 RP136461

NOOSA SHIRE COUNCIL
Locality of COOROIBAH

 

0 5 10 Meters 25

scale
1:500(A3) SCALE SHOWN 1S ORIGINAL DRAWING SCALE
. DO NOT SCALE FROM THIS DRAWING

 

 

\ USE_ONLY_DIMENSIONS_ PROVIDED, }

REVISIONS

revision details
A | FOR APPROVAL

 

FILES

 

COMPUTER DIRECTORY

 

X:\JOBS\CT PROJECTS IN PROGRESS\2025 26 JIRR

 

IMA\ DESIGN

 

FOR APPROVAL

 

Sheet 8 of 8 sheets

 

drawing number

2025-08

 

 

 

 

date 22nd SEPTEMBER 2020 yy,

 

 

 

 
Log in to download the original file

2025 26 Jirrima Cres - Noosa OPW app with attach.pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.