Council archive · source document
2025 26 Jirrima Cres - Noosa OPW app with attach · OPW20/0167
Callaghan & Toth Civil, Environmental & Hydraulic Engineers [OCR of page images] —— SEDIMENT CONTROL LEGEND: P_s SEDIMENT FENCE TO STD DWG ESC-04 & 05 ® — ee FILTER SOCK KERB/INLET FILTER TO STD DWG ESC-03 DIRECTION OF SEDIMENT FLOW/FINISHED ALLOTMENT FLOW ROCK FILTER DAM INSTREAM TO IECA RFD-03 & RFD-04 SEDIMENT & EROSION CONTROL CHECK LIST LOT 10 SP159615 STRAINER WIRE a fey TOP & BOTTOM FILTER FABRIC FIXED TO FENCE AND EMBEDDED INTO 0.5 GROUND MIN. 200mm PROVIDE OVERFLOW WEIR 0.5 WIDE o2f [LOW WHERE BACKUP FLOW IS * LIKELY TO OVER TOP WEIR 03 Ly STAR PICKET SEDIMENT FENCE DETAIL ( Callaghan & Toth ) Alexander David Toth 6069 ISSUE MANAGEMENT COMMITMENT Civil, Environmental & NAME RPEQ OBJECTIVE / TARGET Comply with all statutory regulations and maintain Hydraulic Engineers them during earthworks/construction. PO BOX 2305 Comply with the erosion and sediment control plan. NOOSA HEADS 4567 28/09/20 ¥ iL 1.16/90 Goodchap Street SIGNED DATE => Phone 54749081 MANAGEMENT STRATEGY Site foreman to identify and check direction of storm water www.callaghanandtoth.com.au land flows as shown on plan. Provide barriers and other designed | MP datum AHD DERIVED measures shown on the plan to intercept storm water flows drawn MP at the end of table drains, and intercept sediments checked | ADT | Origin (B.M.) PSM 152523 before reaching gullies. approved TASKS / ACTIONS Erect sedimentation barriers as shown on the plans SURVEYED BY before commencing earthworks or drainage improvements. MAX WATTERSON & ASSOCIATES Place rock weirs in table drains as soon as the drains are cut. —__ a q . . project PERFORMANCE INDICATORS | Site foreman to check that sediment fence and rock weirs are trapping the flows after rain. Ensure no bypass occurs. PROPOSED ACCESS DRIVEWAY ATI FREQUENCY / DEADLINE Site foreman shall monitor performance and repair damage 26 JIRRIMA CRESCENT after every storm until grass is established. Sediment shall COOROIBAH be removed before it reaches overflow level. LOT 78 V J RP136461 RESPONSIBLE PERSON The Principal Contractors foreman shall be (aa i responsible for inspections. REPORTING / REVIEW Site Foreman to advise workers: if they notice any barrier requiring repair, report it to foreman. CORRECTIVE ACTIONS Site foreman is to repair any damaged barriers daily. Replacements are to be purchased as required. LOT 78 RP136461 M. PAGE & D. STUART ———$ dd i. title EROSION & SEDIMENT CONTROL PLAN Nc (SN LOT 78 RP136461 NOOSA SHIRE COUNCIL Locality of COOROIBAH 0 5 10 Meters 25 scale 1:500(A3) SCALE SHOWN 1S ORIGINAL DRAWING SCALE . DO NOT SCALE FROM THIS DRAWING \ USE_ONLY_DIMENSIONS_ PROVIDED, } REVISIONS revision details A | FOR APPROVAL FILES COMPUTER DIRECTORY X:\JOBS\CT PROJECTS IN PROGRESS\2025 26 JIRR IMA\ DESIGN FOR APPROVAL Sheet 8 of 8 sheets drawing number 2025-08 date 22nd SEPTEMBER 2020 yy,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.