Council archive · source document
080630 FINAL TP Assessment Report.pdf [As Published] · 132008.1128
Very large file (22.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Main precinct 2 (Retirement Village ILUs and Serviced Apartments) requires a total of 162 car parking spaces. 184 have been provided on site within the precinct and an additional 13 spaces on-street in Grasstree Court (refer to Appendix J — Traffic Assessment Report). The location and grade of all access ways throughout and adjoining the facility has been designed to ensure maximum accessibility to all forms of personal mobility including pathways for pedestrian and wheelchair movement and roadways for private and public bus services which operate to nearby Noosa Junction and beyond. Employee and Visitor numbers Blue Care Sunrise Beach will be employing approx. 83 people to service the development on a daily basis, but the maximum number of staff likely on site at any one time is 55. Furthermore, it is generally expected that a maximum number of 10 visitors on average will attend the RAC facility from 8am to 6pm 7 days a week. Unfortunately, the number of expected visitors to the retirement village is harder to quantify but sufficient car parking has been provided in keeping with other similar facilities and within current Council car parking guidelines for the use. Hours of operation by use RAC facility — 24 hrs, 7 days (main administration only 8am to 5pm Mon to Fri) Community Nursing (satellite base / access to 5 hotdesks) — 7.30am to 6pm 7 days Allied Health Services (clinic rooms and therapy gym) — Mon to Fri 8am to 4.30pm Respite Centre (overnight) — 24 hrs, 7 days (at times when a client stays overnight), otherwise Mon to Fri 8am — 4.30pm Recreation Centre for residents of Independent Living Units — 7am to 6pm for meals 7 days a week, outside these times the function centre may be used for functions between 7am to 10pm (to midnight) on any day of the week. 3.2 Pre-lodgement Advice Prior to preparation and lodgement of this report, numerous searches of relevant and publicly available Federal, State and Local Government information sources, were conducted, as well as phone calls, emails and other communication with the relevant agencies, including Council. A pre- lodgement meeting with Tracy Arthur and Mark Lewis from Noosa Shire Council (NSC) was undertaken with regards to the proposal on the 14"" February 2008. Two separate pre-lodgement meetings with the Environmental Protection Agency (EPA) were also held. Some of the notes and search results of the above are attached (refer to Appendix E — Pre-lodgement Communication and Searches).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080630 FINAL TP Assessment Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 22.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.