Council archive · source document
080630 FINAL TP Assessment Report.pdf [As Published] · 132008.1128
Very large file (22.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
. Queensland Enquiries Kerri Milner ‘Telephone (07) 3225 8443 Gove rment Your reference Our reference STH4243-3 27 March 2006 a Environmental Protection Agency MsB land Incorporating the 4 io . Queensland Parks and Wildlife Service Project Manager Blue Care Property Development Unit PO Box 1539 MILTON QLD 4066 Dear Ms Hollands Prelodgement meeting for Blue Care facility located at Girraween Estate, Noosa I refer to the prelodgement meeting between representatives from Blue Care and Place Design Group and the Environmental Protection Agency (EPA) held on 8 March 2006 to discuss the above development proposal. The following key issues were identified and need to be addressed along with any actions required to progress each item. Environmental management plan To ensure the protection of environmental values both on- and off-site, in particular in the adjacent Noosa National Park, it is recommended that an environmental management plan be prepared and that the plan cover both construction and operational phases of the development. The management plan should include a vegetation management plan that is consistent with that prepared by Noose Shire Council for the Girraween Estate. An EPA guideline for preparing such plans is available at: htttp://www.epa.qld.gov.au/publications?id=706. Buffer to National Park The site, identified as Area 1 on Noosa Shire’s Girraween Master Plan, borders Noosa National Park to the west. In order to ensure that the values of the national park are not impacted it is recommended that the following measures be incorporated: oA buffer of not less than 30 metres be provided along the entire eastern border with the first 20 metres (closest to the park) being vegetation with locally indigenous species with the balance of the buffed being available for fire management and storm water management. o Anaccess track/road be included in the buffer towards the development site and that this track be constructed with a permeable material to allow natural water flow o No increased water-flow entering the park — a reduction in water-flow may be acceptable, though additional consultation with Queensland Parks and Wildlife Service staff would be required to ascertain acceptable flow regimes. © Quality of water entering the park is to be at least equivalent to that currently entering the park. 23/288 Edward St Brisbane Queensland 4001 Australia GPO Box 2771 Brisbane Queensland 4001 Australia Telephone 3225 8411 Facsimile 3225 8723 Website www.epa.qid.gov.au ABN 87 221 158 786 Printed on 100% recycied paper
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080630 FINAL TP Assessment Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 22.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.