L02 To GRC -response to IR
Item 7: Site Cover & Plot Ratio Applicant’s Response: The enclosed plans by QUOA Architecture illustrates amendments made to the proposed gazebos following the discussion with Council on 25th March, 2022. These revised drawings clearly illustrate the amendments made to the layout, fittings and finishes to the gazebos to those as originally proposed. These amendments, for example, include:- Item 8: Building Setbacks Applicant’s Response: Those original plans submitted with the development application proposed complying front and side boundary setbacks as stated in the assessment against applicable benchmarks in the proposal report. Those proposal plans by QUOA Architecture that are enclosed with this response have been amended to provide additional dimensions and red balloons highlighting the proposed boundary setbacks. The proposed front and side boundary setbacks continue to comply with the preferences in the 2020 Noosa Plan for a proposed dual occupancy development on the site. Item 9: Works near underground infrastructure Applicant’s Response: The original plans submitted with the development application took into consideration the surveyed location of the sewer main that obliquely traverses the site. The intention was to liaise with Unity Water at the development works stages to ensure that the location and design of the development complied with Unit Water’s requirements. Following the online meeting with Council on 25th March, 2020 Council has advised by email that ‘Council is happy to condition a subsequent approval from Unity Water rather than providing it with the IR response.’ Item 10: Stormwater Applicant’s Response: The applicant’s consulting engineers, ACROS, have provided the attached letter dated 4th April, 2022 and signed by Lachlan Swann, RPEQ 21223 on behalf of Arcos Unit Group Pty Ltd (Arcos Group), to certify that the proposed works as shown on drawings 211099-OPW-C-00301 & 211099- SMP-C-00301, are not considered to significantly alter the stormwater drainage characteristic external to the site. This certification includes confirmation that this also refers to no significant worsening of the stormwater conditions external to the site. The applicant has now responded to Council’s IR for this code assessable development application and therefore requests that Council completes its assessment of this development application based on the common material provided with the original application unless amended by this response to Council’s IR. Council remains welcome to contact me directly on 0409632830 or by email through [email protected] if Council requires any further information and/or clarification in relation to any of the above response. Yours faithfully, Greg Martoo Principal
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.