Skip to the record
Beware of cheap imitations.

Original source · versioned page text

F - Traffic Response and Revised Traffic Impact Assessment (17.09.19)

of 164

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 130, section 1. The text section number identifies this passage in the reader.

LANE SUMMARY
     Site: 101 [2020 AM BG+DEV Eenie Creek Road / Hofmann Drive]
Intersection: Eenie Creek Road / Hoffman Drive
Job#: BLU0517-01
Site Category: (None)
Roundabout



 Lane Use and Performance
                 Demand              Deg. Lane Average       Level of     95% Back of Queue       Lane   Lane Cap. Prob.
                    Flows Cap.       Satn Util. Delay        Service                              Config Length Adj. Block.
               Total HV                                                       Veh         Dist
              veh/h    % veh/h         v/c    %        sec                                  m                    m     %        %
 South: Hoffman Drive
          d
 Lane 1          498   1.5    1212   0.411   100       4.2    LOS A            2.6       18.2       Full         76   0.0      0.0
 Lane 2          468   1.5    1048 0.447     100      10.6    LOS B            2.8       19.6       Full         76   0.0      0.0
 Approach        966   1.5           0.447             7.3    LOS A            2.8       19.6

 East: Eenie Creek Road (E)
          d
 Lane 1          459   1.5    1166 0.393     100       5.8    LOS A            3.3       23.2       Full      140     0.0      0.0
 Lane 2          350   1.5    890 0.393      100       6.3    LOS A            2.9       20.8       Full      140     0.0      0.0
 Approach        808   1.5           0.393             6.0    LOS A            3.3       23.2

 West: Eenie Creek Road (W)
 Lane 1          455   1.5    988 0.461      100       5.7    LOS A            3.5       24.8       Full      290     0.0      0.0
          d
 Lane 2          586   1.5    1273 0.461     100      11.2    LOS B            3.8       27.1       Full      290     0.0      0.0
 Approach      1041    1.5           0.461             8.8    LOS A            3.8       27.1

 Intersectio   2816    1.5           0.461             7.5    LOS A            3.8       27.1
 n


Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.

d Dominant lane on roundabout approach

SIDRA INTERSECTION 8.0 | Copyright © 2000-2019 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: CAMBRAY CONSULTING | Processed: Friday, 13 September 2019 4:13:18 PM
Project: \\FILE\Projects\BLU0517\01\5. Working\SIDRA\19-08-16 - SIDRA\3.BLU0517-01_HoffmanDr_EenieCreekRd.sip8
Log in to download the original file

F - Traffic Response and Revised Traffic Impact Assessment (17.09.19).pdf · 8.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.