LANE SUMMARY
Site: 101 [2020 PM BG+DEV Eenie Creek Road / Hofmann Drive]
Intersection: Eenie Creek Road / Hoffman Drive
Job#: BLU0517-01
Site Category: (None)
Roundabout
Lane Use and Performance
Demand Deg. Lane Average Level of 95% Back of Queue Lane Lane Cap. Prob.
Flows Cap. Satn Util. Delay Service Config Length Adj. Block.
Total HV Veh Dist
veh/h % veh/h v/c % sec m m % %
South: Hoffman Drive
Lane 1 385 1.5 915 0.421 100 5.3 LOS A 2.4 17.2 Full 76 0.0 0.0
d
Lane 2 496 1.5 1117 0.444 100 10.8 LOS B 2.8 19.5 Full 76 0.0 0.0
Approach 881 1.5 0.444 8.4 LOS A 2.8 19.5
East: Eenie Creek Road (E)
d
Lane 1 546 1.5 1281 0.426 100 5.2 LOS A 3.6 25.3 Full 140 0.0 0.0
Lane 2 426 1.5 1000 0.426 100 5.6 LOS A 3.3 23.1 Full 140 0.0 0.0
Approach 973 1.5 0.426 5.4 LOS A 3.6 25.3
West: Eenie Creek Road (W)
d 5
Lane 1 495 1.5 1243 0.398 87 5.0 LOS A 3.2 22.9 Full 290 0.0 0.0
Lane 2 440 1.5 965 0.456 100 12.5 LOS B 3.5 24.9 Full 290 0.0 0.0
Approach 935 1.5 0.456 8.5 LOS A 3.5 24.9
Intersectio 2788 1.5 0.456 7.4 LOS A 3.6 25.3
n
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
5 Lane under-utilisation found by the program
d Dominant lane on roundabout approach
SIDRA INTERSECTION 8.0 | Copyright © 2000-2019 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: CAMBRAY CONSULTING | Processed: Friday, 13 September 2019 4:13:18 PM
Project: \\FILE\Projects\BLU0517\01\5. Working\SIDRA\19-08-16 - SIDRA\3.BLU0517-01_HoffmanDr_EenieCreekRd.sip8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.