F - Traffic Response and Revised Traffic Impact Assessment (17.09.19)

of 164

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 145, section 1. The text section number identifies this passage in the reader.

LANE SUMMARY
     Site: 101 [2019 PM Survey Eenie Creek Road / Walter Hay Drive]
Intersection: Eenie Creek Road / Walter Hay Drive
Job#: BLU0517-01
Site Category: (None)
Roundabout



 Lane Use and Performance
                  Demand             Deg. Lane Average        Level of     95% Back of Queue      Lane   Lane Cap. Prob.
                     Flows Cap.      Satn Util. Delay         Service                             Config Length Adj. Block.
                Total HV                                                       Veh        Dist
               veh/h    % veh/h        v/c    %        sec                                  m                      m    %       %
 South: Walter Hay Drive (S)
 Lane 1          157   1.5     814 0.193     100        4.5    LOS A           1.0         7.2      Full      270      0.0     0.0
          d
 Lane 2          686   1.5     1111 0.618    100      11.1     LOS B           5.5       38.8       Full      270      0.0     0.0
 Approach        843   1.5          0.618               9.9    LOS A           5.5       38.8

 East: Eenie Creek Road (E)
          d
 Lane 1          805   1.5     1444 0.557    100        4.8    LOS A           5.8       40.8       Full      500      0.0     0.0
 Lane 2          561   1.5     1007 0.557    100        9.1    LOS A           5.4       38.5       Full      500      0.0     0.0
 Approach      1366    1.5          0.557               6.5    LOS A           5.8       40.8

 North: Walter Hay Drive (N)
          d
 Lane 1          582   1.5     710 0.820     100      15.5     LOS B           8.9       63.4       Full      500      0.0     0.0
 Approach        582   1.5          0.820             15.5     LOS B           8.9       63.4

 West: Eenie Creek Road (W)
          d
 Lane 1          529   1.5     1089 0.486    100        6.9    LOS A           5.2       36.9       Full      140      0.0     0.0
 Lane 2          349   1.5     718 0.486     100      12.5     LOS B           4.6       32.3       Full      140      0.0     0.0
 Approach        878   1.5          0.486               9.1    LOS A           5.2       36.9

 Intersectio   3669    1.5          0.820               9.3    LOS A           8.9       63.4
 n


Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.

d Dominant lane on roundabout approach

SIDRA INTERSECTION 8.0 | Copyright © 2000-2019 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: CAMBRAY CONSULTING | Processed: Friday, 13 September 2019 10:13:58 AM
Project: \\FILE\Projects\BLU0517\01\5. Working\SIDRA\19-08-16 - SIDRA\4.BLU0517-01_EenieCreekRd_WalterHayDr.sip8
Log in to download the original file

F - Traffic Response and Revised Traffic Impact Assessment (17.09.19).pdf · 8.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.