Stormwater quality and quantity
Issue – Stormwater Quality
The litter baskets and rainwater tanks are supported, however, the proprietary devices are
not. The rainwater tanks have a high reuse demand which presumably is based on irrigating
all of the landscaped areas of the site and possibly the retained covenant vegetation. This
may not be appropriate and further details should be provided on their assumptions.
Information Required
39. Provide further information and/or a revised design and model as necessary to address
the following items:
a. Provide justification for the assumed annual reuse demands for each rainwater
tank and provide estimates of the source reliability (i.e. how much of the demand
will need to be met by mains back-up supply). In general, use of irrigation water
for landscaping is not encouraged and low-water-usage native plants should be
used in accordance with Specific Outcome O3 of the Water Sensitive Design
Code. Water reuse should be focused on areas of water demand which cannot be
addressed through changes in design/planting – such as for toilet flushing.
b. The use of proprietary underground devices for nutrient removal is in conflict with
O7 of the Water Sensitive Design Code. Provide a revised stormwater treatment
train and revised landscape design for the car parking areas which utilizes
vegetated treatment strategies to achieve multiple benefits.
c. Provide details of the assumed removal rates for the litter baskets and/or the
MUSIC model for review.
Issue - Hydrology
The pre-development hydrologic model uses relatively low initial loss values, particularly for
the rarer AEP events. The IWMP acknowledges that the values differ from those provided by
ARR Datahub but states that the values adopted are conservative. While the values (low initial
loss) would be conservative if the purpose was to undertake flood mapping or estimate design
flood levels, this approach is not considered conservative for the stated purpose of determining
hydrologic and flood impacts of the proposal. Low initial loss values increase pre-development
peak flows and peak flood levels which in turn can underestimate hydrologic and flood impacts
and required flood detention storage volumes. This issue is highlighted by the predicted
RAFTS flows being up to 63% greater than the rational method estimates for the pre-
developed case.
The subject site is subject to local overland flowpath flooding from external catchments located
to the North and West of the subject site which are of the order of 7Ha in size. These
catchments are conveyed through the site as overland flow in a South-Easterly direction and
ultimately discharge under Hofmann Drive to an existing conservation area.
The proposal has the potential to worsen flooding conditions upstream of the site by
blocking/modifying this overland flowpath and has the potential to worsen downstream
flooding by increasing peak flowrates downstream of the site by increased runoff peaks and
volume (due to increased imperviousness of the site).
Information Required
40. Either provide further justification or revised initial loss values for the pre-development
pervious areas. Reference should be made to ARR2016 and the ARR Datahub and the
discussion in QUDM Section 5.6.1. Hydraulic modelling and impact assessments should
also be revised accordingly.
Page 9 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.