F - Traffic Response and Revised Traffic Impact Assessment (17.09.19)
Original PDF page 20, section 1. The text section number identifies this passage in the reader.
Issue – Extreme local flooding
The local flood inundation maps provided with the IWMP show that the access points to the
development will be inundated in the DFE. In extreme events, workers and visitors to the site
will be isolated and evacuation not possible. It should be demonstrated how their safety will
be protected in such extreme events as required by Specific Outcome O17 of the Noosaville
Locality Code.
Information Required
44. Provide mapping for the PMF and a risk assessment for extreme events which
demonstrates compliance with Specific Outcome O17 of the Noosaville Locality
Code.Specifically, the proposal is to demonstrate how the safety of people at the site
will be protected during extreme flood events.
3. DUE DATE FOR RESPONSE TO INFORMATION REQUEST
The due date for providing the requested information is 28 September 2019. Please advise
Council of your response to this information request in accordance with section 13 of the
Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided
not to respond to the information request and Council will continue with the assessment of
your application.
4. OTHER DETAILS
You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact
me on the number above.
Yours faithfully,
Glen Conforti
Development Planner
Page 11 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.