Council archive · source document
Reference Document Emergency Management Plan & Reponse Procedures Feb 2026 OPW25-0206 · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
FM – 6.3.5 Emergency Management Plan template
3.2 Emergency Planning Committee (EPC)
The primary role of members of the EPC is to ensure that life safety takes precedence over
asset protection or production. The EPC is made up of senior site management representatives.
The EPC meet at least annually and capture minutes of the meetings, which are to be filed in
the sites EPC Share Drive Folder <Q: Drive > Noosa > HSW > 05 Emergency Management
ECO training shall be provided six monthly and an annual trial evacuation shall also be provided.
The Emergency Planning Committee members for this site includes the following:
Name Role Phone Number
Darren McClenaghan Resort Manager 0405 120 035
Stephen Harvey Maintenance Manager 0400 571 773
Julianne Walton Accommodation Manager 0438 941 692
Danny Cannon Food & Beverage Manager 0409 461 761
Holly Campbell HR Coordinator 07 5341 6305
The Emergency Planning Committee (EPC) duties consist of the following:
• Identifying events that could reasonably produce emergency situations;
• Developing an emergency plan in accordance with AS3745-2010;
• Ensuring that resources are provided to enable the development and implementation of
the emergency plan;
• Nominating the validity period for the emergency plan and the evacuation diagrams;
• Ensuring that the emergency plan is readily identifiable and available to the appropriate
persons;
• Establishing an Emergency Control Organisation (ECO) to operate in accordance with
the emergency plan;
• Disseminating information about the procedures to staff and occupants;
• Ensuring relevant training is provided to all staff and facility occupants based on the
Emergency Plan & Procedures;
• Testing and review of the emergency procedures following actual emergencies or trial
exercises;
• Ensuring that the register of training is current and readily available; and
• Establishing strategies to ensure visitors/contractors are made aware of emergency
response procedures
Document Title: Issue: 6 Next review date:
FM – 6.3.5 Emergency Management Plan Review date: February 2026 June 2026
Noosa Resort
Document Owner: Authorised by: Page: 19 of 77
Health Safety & Wellbeing Manager HSW
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document Emergency Management Plan & Reponse Procedures Feb 2026 OPW25-0206.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.