Skip to the record
For the highest quality transcripts.

Council archive · source document

Reference Document Emergency Management Plan & Reponse Procedures Feb 2026 OPW25-0206 · OPW25/0206

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
   FM – 6.3.5 Emergency Management Plan template

   The Resort Manager & Maintenance Manager are responsible for the monitoring of all weather
   conditions and alerting staff and key personnel of any instances where adverse weather may
   affect the resort, including cyclones and severe storms. Weather conditions are monitored on a
   daily basis.

   DISASTER ORGANISATION
   With an impending Cyclone approaching, the following stages are to be used in order to
   coordinate an effective and efficient emergency plan.

   Stage 1:        36 Hours notification of possible cyclone condition.
   Stage 2:        24 Hours notification of probable cyclone condition.
   Stage 3:        12 Hours notification of imminent cyclone condition.
   Stage 4:        Post emergency condition / clean up.

   CYCLONE EMERGENCY EQUIPMENT

   The following items are the minimum stock levels that should be held in the storage in
   preparation for a potential cyclone. These items are stored in the basement carpark storeroom
   (next to lift), with pumps and sand-less sandbags stored with Maintenance. The Maintenance
   Manager is responsible for ensuring the following items are held:

       •   Torches including batteries
       •   Rolls of 2” masking tape & 20 rolls of masking tape paper
       •   1 x 100m x 1.5m roll of heavy-duty plastic
       •   Metal buckets
       •   12mm nylon rope
       •   20’ x 24’ tarpaulin
       •   Supply of sand-less sandbags (stored with maintenance ladders in carpark driveway)
       •   Pumps and associated equipment (Maintenance)




Document Title:                           Issue: 6                              Next review date:
FM – 6.3.5 Emergency Management Plan      Review date: February 2026            June 2026
Noosa Resort
Document Owner:                           Authorised by:                        Page: 48 of 77
Health Safety & Wellbeing                 Manager HSW

Used in these records

About this file

File size
6.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document Emergency Management Plan & Reponse Procedures Feb 2026 OPW25-0206.pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.