   FM – 6.3.5 Emergency Management Plan template



   The appropriate response will depend on the level of the perceived risk. In determining the
   perceived risk, the following issues should be considered:

   •   The nature or type of caller – Was there any site-specific knowledge demonstrated by the
       caller?
   •   Was it seemingly premeditated by the caller? (i.e., Scripted threat, or recorded voice) This
       may increase the level of perceived risk.
   •   Was it a child's voice or were there people giggling in the background? If there are factors
       that suggest the call is less genuine, this will lessen the perceived risk
   •   The frequency of the threats being received. If threats are received on a more frequent basis,
       the level of perceived risk will be reduced
   •   Timing of the threat. If the threat is received during school holidays or April Fool’s Day the
       perceived risk will be less. However, if the threat is received during periods of increased
       building occupancy or a site-specific function, the perceived risk may be elevated
   •   Is it possible that the call is a Copy-Cat call? If there have been media reports recently this
       may lead to an increase in frequency of false threats and hence would reduce the perceived
       risk
   •   Will immediate evacuation of the building expose people to greater danger? If you believe
       the location of the bomb/threat is in building vicinity, occupants may be safer remaining in
       the building
   •   What is the size of the building and how many people are involved? Where there are fewer
       people, it may be more appropriate to consider evacuation even where the perceived risk is
       low. However, where there are many people involved and there is a lower perceived risk
       (i.e., telephone call without a suspicious package) a full building evacuation may not be
       warranted as the costs associated with evacuating a large number of people would be
       considered excessive considering the risk

   Local Considerations
   Have there been any problems associated with staff-members? (i.e., Redundancies, staff
   grievance, or incidents involving members of the general public). The threat may be related to
   an incident/situation or staff-member; the perceived risk may be increased or decreased
   depending upon the knowledge about the individual(s) concerned. Has there been any criminal
   or malicious activity in the surrounding area/suburb? (e.g., Vandalism or gang related violence)

   National Considerations
   Have there been recent announcements by the company, or government, (i.e., Industrial
   Relations changes or company policy changes etc.) that may instigate animosity towards the
   company? The perceived risk may be increased if public debate or opinion is of a magnitude to
   spurn people to take physical action.

   International Considerations
   Are there any international events that may be of influence to the perceived threat? The
   perceived risk may be increased due to public polarising in opposition to such things as business
   operations/ industrial accidents/ business mergers or ethical practices etc. that may result in
   threats being made.



Document Title:                            Issue: 6                                 Next review date:
FM – 6.3.5 Emergency Management Plan       Review date: February 2026               June 2026
Noosa Resort
Document Owner:                            Authorised by:                           Page: 61 of 77
Health Safety & Wellbeing                  Manager HSW

Used in these records

About this file

File size
6.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document Emergency Management Plan & Reponse Procedures Feb 2026 OPW25-0206.pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.