Skip to the record
For the highest quality transcripts.

Council archive · source document

planning report Tristania - Change · MCU14/0076.01

of 12

Text shows just the words. Original shows the document exactly as it was published.

                  agency must have assessed the application against, or have had regard to, when
                  the application was made; or

       Response: The proposed change would not result in the chief executive having to consider
       matters additional to those considered when the application was made.

              E. public notification if public notification was not required for the development
                 application.

       Response: The change does not require the application to be publicly notified.

Given the above, the proposed change to the existing approval is a minor change in accordance with
Schedule 2 of the Planning Act 2016 and Schedule 1 of the Development Assessment Rules.


4.2       Key issues
4.2.1 Building Works Code Compliance
The proposed development meets all the Accepted Outcomes of the Building Works Code regarding
setbacks, height, site cover and soft landscaping requirements as demonstrated in the table below.

 Parameter       Requirement                    Proposal                                 Compliance

 Setbacks        Front - 6m                     Front – No change                             Y
                 Side and Rear – 1.5m up to Rear – Existing 2m to pool,                       Y
                 4.5m in height, and 2m Proposed 5m to pool
                 between 4.5m and 7.5m in
                 height. AND
                                              Side (north) – Existing 1m to pool,
                 *Nil for class 10a buildings                                                 Y
                                              Proposed 1.5m
                                                Side (south) – Existing 1m to pool,
                                                Proposed 2m                                   Y

 Height          8m                             No change = 7.9m                              Y
                 2 Storeys                      No change = 2 storeys                         Y

 Site Cover      40% all levels                 Proposed                                      Y
                                                Lower ground = 155m2 (23%)
                                                Ground Floor = 276m2 (40%)*
                                                First Floor = 152m2 (23%)

 Landscaping 20% soft landscaping               217m2 (31%)                                   Y

 Materials       Appropriate colours that blend Roof and colours to match in with             Y
 and Finishes    into the natural environment   the existing and adjoining
                                                buildings.

 Roof Form       No rooftop terraces            No rooftop terraces                           Y
                                                Note: Roof includes 5-degree pitch and
                                                eaves to 75% of building.




                                                                                           Page 9 of 12

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

planning report Tristania - Change.pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.