Original source · versioned page text
ATTCH 4 - IR Response - UXO vegetation clearance (Opec Systems)
Attached to the e-mail RAL17/0501 IR Response email 2 of 4.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
!
DRAWN
Lots
F
SURVEYOR
E
B
A
D
C
Park
Road
LJS
LGM
Identifier
Covenant
Area range
Area average
Total Site Area
DATE
involving the land.
CHECKED LGM
712
Benefit
New Road
1/11/2017
711,713
Building Envelope
711-715
711-714,716
REVISIONS
711,712,714
711-713,715
2
6
Nil
AHD
Covenant (Bushfire Risk and
(RL 8.587m)
Statistics Table
72 m 2
Stormwater Management) Area
5052 m 2
1601 m 2
9677 m 2
DERIVED FROM PSM 18395
13.
72
and should not be used for any other purpose.
942 m - 3336 m
Therefore, no reliance should be placed on the
19.
47
2
15.
0
22
14 . 00
.0
0
16.
28
.0
0
19
A
B
C
.0
18
. 00
17
information on this plan for any financial dealings
16
LEVEL DATUM: SITE:
18.
54
Easement Schedule
PP/41289
15.
46
TBM/STPKT
PP/208615
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.