07/1873 - Preliminary Building Works Assessable against planning scheme [As Published] · 172007.1873
Nelo Kwwe Checklist - Applications Involving Land
on Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
4. APPLICATION FORMS — ‘ oy memes i
1.1. Form1 PartA
1.1.1 Ensure that the form is fully completed. “|
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required. vf fe
4.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 _ If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
1.1.2.4 Ensure that each of Forms B-O which are attached are fully completed. [7]
2. REFERRAL INFORMATION, © UT Ten Sm
2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals, iz
3.” ENVIRONMENTALLY RELEVANT ACTIVITIES” wm - oe
3.1. Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
4, FORM 2’- REQUEST.TO CHANGE APPROVAL -
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding |
applicant details and owners consent. t
“ bone . . z
5. PLANS . . vf Lot Bm ny . wo
5.1. Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationat 2
Works) accompanies the application. In addition ensure that each set is complete.
§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or Ad format and is “|
unbound.
6. SUPPORTING INFORMATION . ee cae i
6.1. Ensure that at least 6 copies of any report accompanies the application 6 for Reconfiguration -
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. [= |
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
7.) FEE * Fe ea La uate
7.1 Ensure that ‘the application fee, as determined from the Council's adopted scale of fees, Y
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. “
Date ....
Having completed this form and accepted th¢ Application, please deliver both to the following IDAS Application Receiving
trays:~
«Ifthe application is for a Material Change of Use exctusively -AOP1's desk in the Land Use Section.
« Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
¢ — Ifthe application is for Operattonal Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the
Land Development Section.
¢ Inall other circumstances —- AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
Receiving Officer
SEP! g:\antYorms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 25 pages
Page 2
Trish Sweeney From: Trish Sweeney Sent: Monday, 17 September 2007 11:43 AM To: Maree Kearney Subject: 52 Woongar St Hi Maree, sorry can't really give an accurate time frame for this application as we are flat out but around 3-6 weeks is what we are generally quoting Ta Trish Sweeney Administration Officer - Land Use [email protected] 5449 5293
Page 3
‘1
INTEGRATED PLANNING ACT 1897
Part A, Version 2.4, 29 May 2006
12 Sep 10
Common details"
a
The completion of all applicable questions on Part Ais mandatory for all applications. Part A must be acoompanied by the completed DAS Assessment Checkilst if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.tpa.qld.gov.au,
: Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 4,
Description of tand
All land the subject of the appfication, must be
' Mentified. However, a description of the land is not
required in relation to a mobile or temporary
Environmentally Refevant Activity (ERA).
Advica for completing Q2 - Q2 applies if
development is proposed within a water body or
watecourse,
Advice for completing Q3 - Most land can be
identified by a lot on plan description. These details
can be obtained from title documents or through the
local government.
However, if the land on which the development is
proposed does not have a lot on plan description (i.e,
the development is proposed in a water body or
watercourse) provide -
(i) the lot on plan description for the
adjoining/adjacent !and; or
(i) GPS coordinates where there is no
adjoining/adjacent land (eg. in Moreton Bay).
Advice for completing Q7 - Q7 does not apply if the
development is within a water body or watercourse.
Advice for completing Q8 - Q8 applies if
development is within a local government area.
“Note: Areas below high water mark are not within @
Jocal government's area unless provided for under the
*; Local Government Act 1993.
Advice for completing Q9 - Q9 applies if
development is on strategic port land or a strategic
, Pot land tial area. For moro details refer to Guide 11
1.
Street address: fnetudinghouse number, street name, suburb/ocality name & postcode) (if applicable)
[42 WoonGAR S7_ ffokéEnN PoInT
Name of water body or watercourse, within which the development is proposed: (i applicable)
L aN 153 7 |!
Lot on plan description (eg. Lot 123 on RP 4567)/ GPS coordinates 247 LL BN,
[LOT _ 97 RP SI9216 ay” na “\
The above description is for: (tick applicable box) NCCEIVE| a
i) the land on which the development is proposed;{aw 1; >
oO (ii) the land adjoining the water body or watercours:
proposed; or
C1 (ili) the water body or watercourse.
Shop / tenancy number: 6. Storey / level:
[| 2
Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable)
Port authority for the strategic port land or strategic port land tidal area on which the
development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
L
‘Proposal details
_Htthere is insuficlent room availabe, detals may 5e
_ provided in an attachment to the application.
10.
Existing use of the land: (eg. vacant, single house, shop etc.)
LINGLE Ase
' 11. Proposed use of the land: (eg. 6 unit apartment building, 30 Jot residential subdivision, ERA for aquaculture in
; ponds with a total area of 7 ha for which wastes are released into waters etc).
; Lvgw OsCHs
+Other applicable parts of Form 4 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part J, etc)
“Parl A must sfways be accompanied by other | ]
{completed parts of Form 1. For information about : -
j When a part of Form 1 may apply refer to Guide 1
: Applicant details 13. Applicant's name: ‘18. Contact person:
erase bor Sr “me Ldscus oF Woost ] [dws Koba7rso/ |
siguin: this a 14. Contact number. 16. Facsimile number/e-mail address:
‘Monenpondhara heat _ LOHS FF 7¢#F | = S#7# F072
{whan epee lt ey this information when {17. Postal address:
ling the
Toone smn | 7 Coestne Ce Sowitiae Sugnerr 1
“art be shown, 18. Signature: 19. Date:
2G -6¥-0F
Geo a
Page 4
INTEGRATED PLANNING ACT 1997
Land owner's consent (if applicable)
Saction 3.2.1(3) of the IPA prescribes that an
[ epplicaion must contain, or be supported by, the
{writien consent of the land owners, if the application
| involves:
iy a material change of use;
‘fi reconfiguration of 2 bot
1) work on tand below high-water mark & not within @
¢ canal es defined under the Coastal Protection and
{ _ Management Act 1995;0r
{fv) work on rail corridor land defined under the
1 Transport infrastructure Act 1994.
Section 3.8.1(2){a) of the IPA provides that
landowner's consent is pot required for a mobile or
* temporary ERA .
3 For more information refer to Guide 1
20. Land owner's consent to the making of this application:
Part A, Version 2.4, 29 May 2006
Name Signature Date
9 hea 2 Phin Tort oeccceeccceeeeeceeeeceeeeseneefeeesseseees
(i)
wees
f@ 0 fee
“Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
, Sexton 3.2.46) of the IPA requires evidence of quany material on State coastal land under the Coastal Protection and Management Act 1995)?
resource entitlement be given for applications that
involve a presoribed State resource. LANO - g0 to a24 [7] YES - go to.022
Sata a en sean naan 22. This application is accompanied by evidence: (tick applicable box)
without evidence of the resource entiiement (1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to 023(v)
* Advice for completing 071 & 22
Refer to schedule 10 of the intagrated Planning (1 fii) the chief executive of the department administering the resource is satisfied the
” Regulation 1998 thal prascribes the nature of eviden j is con i i -
“aud oY the Sista insupportot the ‘edging Sf he development is consistent with an allocation of, or entittement to, the resource - go
felopment application.
(J (ili) the chief executive of the department administering the resource is satisfied the
development application may-proceed in the absence of an allocation of, or
entitlement to, the resource — go to Q23
: Advice for completing 023 23. Evidence of the resource entitlement:
requred une 23 erence” | i) Resoures entitlement / authority details (vi) Offical stamp of the department
Reset Sana ec
‘Resources, Mines and Water is mandatory where the . applicable)
application involves any water or riverine quary {ii} Name of delegated officer
metro Cd
Section 3.2.1{5A) allows the a ae to ft
the time the avid be used. i} must ‘il iti
Toad Ee cae eee O25 (4) ms (ii) Position of a Officer
{iv) Signature of delegated officer :
(v) Date
(vi) pe date of evidence a
‘Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
; This checkiist does pet apply i the application requires (Yes [1] NO ~ the assessment fuse to
ithe completion of Parts A and B ofthe F It manager may refuse to accept this appication onthe
“Tusk be comps tor al ter aplication " grounds thet the epplication has not been properly made .
Plans / drawings / repo! . Plans/drawings/re accompanying this application:
Plans / drawings / reports 25. Plans/drawings/reports ac thi licati
; An application should be accompanied by details to
‘support the proposal & enable the assessment
s manages, referral agencies and any person viewing
* the application during public scrutiny or public
notification to understand the scope of the proposal
+ and any potential impact. .
r
Plan / Drawing / Report Number
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (eppticabie to ssessmient manager's}
[em 650 | ene [17/9/25 [ee PS OS | eee mes O(. 273_|
SS Nall ication of Engagement of Private Certifier (Optiona! forma}
To. Council. | have been engaged as the private certifier for the building work referred to in this application.
Oateofengagement / /
Accreditation Number.
Name:
Signature:
Page 5
INTEGRATED PLANNING ACT 1997 ~ Part €, Version 2.1, 18 June 2007
. a aor Development Application
Operational &/or building work ‘|
assessable against a local government RAE CERTETS =
12 SEP 2007
Completion of all question on Part E is mandatory for all applications involving the asiissneote Beata error building work assessable
against a local govemment's planning scheme (including detailed engineering plans end other plans, detailed canes plans for subdivisional works and conceptual
design plans for engineering & building work when the application does not involve assessment of a material change of use of premises at the same time).
Nature of the works 1. The application is seeking approval of (tick one (1) or both if applicable):
The types of work that are assessable against Culling work assessable against a planning scheme - provide details of the aspects of building
a planning scheme are determined by the work (e.9. building height greater than 8.5m; building work on high tandsfip risk area)
scheme for a particular local goverment and =
will vary across the State. [ Vw OSCHS x 2 ]
To determine the types of work that are Lo Operational work assessable against a planning scheme - provide details of the nature of the
assessable under a particular planning operational work (e.g. roadworks; landscaping; drainage works; stormwater, water infrastructure; sewerage
soar relevent local infrastructure; earthworks; clearing vegetstion; signege) .
‘The information In Q2 ts necessary for | .
statistical and planning purposes. 2. _ Is the application for operational work involving the creation of new lots?
TaKo (71 YES - specify number of new tots to be created below
[
3. whe involve the construction of a canal that is associated with reconfiguring a lot?
lO
OOYes
Nature of the application 4. This application is for: (tick one (1) or both if applicabie)
A development pemmit authorises -
mts or we eotinary 0 Preliminary approval provide details of the type of work eg. roadwork, stormwater, water and sewerage
approval is a step in the approval process =
and does not authorise development to occur. | |
[Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc .
[WEWw_ Dsus x Z
5. Are the works subsequent to a previous development permit or preliminary approval?
@ CONO = YES ~ provite detais of al previous approvals
. List of approval referenca/s Oate approved. - Date approval lapses"...
i / i /
Portable Long Service Leave levy (f {6. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
- applicable) _ - .
* Prior to issuing a development permit for the CV YES - completo a7
_ works, the assessment manager is required LINO -07, 889.00 not apply
"by law to “sight” an approved form, issued by
Qleave, which signifies thatthe PLSLlevy 7. Has the PLSL levy been paid?
verter nena refer to LIYES~conmpicte o
hitowww.aleave.ald.aov.au [NO ~ the applicable levy must be paid before @ devefooment pert can be given for the works
8. How much was paid? . /
9. Whatis the receipt number of the payment?
|
Page 6
INTEGRATED PLANNING ACT 1997_. Part E, Version 2.1, 18 June 2007 PLEASE NOTE This application cannot be accepted unless accompanied by Part A of Form 1. The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information : requested by Part A and any other relevant part of Form 1. OFFICE USE ONLY (appiicable to assessment manager) w isa PLSL levy applicable ints instance? CINo (CJ YES - complete 070) (ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment manager / private certifier at the time of lodgement of this application? (No (7 YES - provide receipt detals
Page 7
Checklist
{Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1.
10.
it,
This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
‘Referrals Checklist”. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensiand State entities (e.g. Environmental Protection
Agency, Dept of Natural Resources and Water, Queensland Heritage Council etc,).
This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager" for the application. . .
Therefore, the completion of alt questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
Itis the responsibility of the applicant to accurately complete this checklist.
Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?,
To assist you in answering the following questions a series of guides are available free from the IPA website www. ipa.gid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free fram
www jpa.qid.gov.au. .
Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
SECTION 1 - STATE ASSESSMENT (completion mandatory)
;Note: The following state assessment triggers apply.to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For more information refer to Guide 4, OO() an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered “none of the above" to Q1, \ has not been made - complete Part G of Form 1
the application requires assessment by the
administering authority, C1 (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering made - complete Part G of Form 1
authority, is the assessment manager forthe. LH (ili) none of the above
application, the administering authority is a
concurrence agency for the application in relation
to this matter.
Note: An application involving ERA 19 and/or 20
wilf also require completion of Part K; of Form 1
for approval where an allocation under the Water|
Act 2000 is required,
Continued overeat
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY (applicable to assessment manager)
DATE RECEIVED ; | REFERENCE NUMBERIS
The assessment manager is responsible for assessing and deciding an !DAS application. The assessment manager for an application is prescribed in schedule 9A of the IPA.
For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?".
The ‘administering authority’ may be either the Environmentat Protection Agency, the relevant local goverment (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).
Page 1
Page 8
INTEGRATED PLANNING ACT 1997
State-controfled road matters
For more information refer to Guide 3.
Unless you answered “none of the above” to Q2,
the application triggers referral to the Department
of Main Roads (DMR) as a referral agency.
In certain circumstances DMR will be an advice
agency, while in other circumstances DMR will
be a concurrence agency.
Schedule 2 of the IP. Requtation will assist you to
determine where OMR is an advice or
concurrence agency for the application.
IDAS Assessment Checklist, Version 20, 2 April 2007
2. The application involves: (tick applicable box/es)
(1 (i) development on land contiguous* to a State controlled road and for -
L_] (a) material change of use assessable against the planning scheme;
LD (b) reconfiguring a fot unless -
« the total number of lots is not increased; and .
« the total number of lots abutting the State-controlled read is not increased;
UJ (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
« associated with access to a State-controlled road; or
« for filling or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
C1 (ii) development on land not contiguous to a State-controlled road and -
1 @) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the iP Regulation and exceeding the thresholds set by
that schedule;
(I (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
“and exceeding the thresholds set by that schedule:
1 © operational work (not associated with a material change of use assessable against ie
planning scheme or reconfiguring a lot mentioned in (b) above)}-
+ assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
E<] (iii) none of the above
Clearing vegetation
Fer more information refer to Guide 12.
Unless you answered “none of the above’ to 03,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).
(fan agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in relation
to this matter.
Ifyou ticked Q3()} or (ii), your application requires
referral to NRW for assessment regardless of
whether vegetation clearing is proposed or not.
3. The application-involves: (tick applicable boxes)
C1 (i) material change of use -
(a) assessable against the planning scheme;
(b) on alot containing - :
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;
{c} where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot —
(a) on alot containing a category 1, 2 or 3 area shown on a property map of .
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d)_ where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
operational work -
(a) _ for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in {ii) - complete Part J of
Form 1
[3d (iv) none of the above.
Di
D1 iii
Strategic port land
For more information refer to Guide 11.
Hf you ticked (i) - the relevant Port Authority is the
assessment manager for the application. .
lfyou ticked (i) Queensiand Transport is a
concurrence agency for the application.
The application involves:
(2) (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1 .
(1 (ii) a material change of use that is inconsistent with the land use plan approved under the
Ti Act for the strategic port land - complete Part ! of Form 1
[4 (ili) none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean tand - if past of the land is within 100m of the State-controtied toad; of thal is part of a future State.
controlled road.
Page 2
Page 9
ha INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 Acid sulfate soils 5. The application involves development on land situated in an identified local government area For more information refer to Guide 10, and where the surface of the land is: (tick applicable box) Unless you answered ‘none of the abave" to 5, [1 (i) betow 20m AHDS and the development will involve the excavation of 1000m? or more of the application requires assessment by . . . Department of Natural Resources and Water soil or sediment at or below 5m AHD, or (NRW). C1 (ii) at or below 5m AHD and the development will involve filling the site with 100m? or more fan agency other than NRW is the assessment of material Manager for the application, NRW is an advice a agency for the: appfication in relation to this (iii) none of the above matter. fequires assessment by the Department of Emergency Services (DES). manager for the application, DES is a concurrence agency for the application in relation to this matter, Major hazard-facilities or possible 6. major hazard facilities For more information refer to Guide 17. \fyou answered “YES" to Q6, the application Ifan agency other than DES is the assessment Does the application involve a material change of use for a major hazard facility or possible major hazard facility as defined under the Dangerous Goods Safety Management Act 2001? BX] NO (YES - complete Part of Form 1 Water related development under the | 7, Water Act 2000 For more information about items (a) — (), refer to Guide 15. For more information about item (9), refer to Guide 14 Does my application involve assessment of a referable dam? Unless you answered “none of the abave’ to Q7, the application requires assessment by the Department of Natural Resources and Water (NRW). manager for the application, NRW is a concurrence agency for the application in telation to this matter, Han agency other than NRW is the assessment The application involves: (1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is: (tick applicable box/es) (1 (a) in a watercourse, lake or spring, (eg. 2 pump, gravity diversion, stream re-direction, weir or dam) - complete Part Kz, K:, Ks, Ke, or Ks of Form 1 whichever is applicable; [-] (b) for an artesian bore anywhere in the State, no matter what the use - ‘complete Part Ky of Form f; . LC (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered by a water resource plan, for use for purposes other than stock and/or domestic USe - complete Part Ks of Form 1; . (1 (d) for a subartesian bore, in certain declared subartesian areas, for use for stock and/or domestic purposes - complete Part K, of Form 1; (1) (e) for taking overtand flow water in certain areas covered by a water resource plan - complete Part Ks of Form 1; (1 (f) for interfering with overland flow water in a drainage and embankment area - complete Part Kio of Form 1 (1 (g) for constructing a referable dams or works that will increase the storage capacity of a referable dam by more than 10% - complete Part Ks of Form 1: or (ii) none of the above. Removal of quarry material from a 8, watercourse For more information refer to Guide 16. Ifyou answered “YES” to Q8, the application requires assessment by the Department of Natural Resources and Water (NRW). If an agency other than NRW is the assessment manager for the application, NRW is a concurrence agency for the application in relation to this matter. Note: Part G of Form 4 is required to be completed as the activity of removing quarry material from a watercourse is also an Environmentally Relevant Activity (ERA). Does the application involve development for the removal of quarry material from a watercourse? requiring an allocation notice under the Water Act 2000? 0 C1 YES - complete Parts 7 and G of Form 1 Cane The identified focat government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cootoola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday. Australian Height Datum (AHD). The declared ground water areas are listed in Guide 13 Develooment in a declared catchment area, Referable dam is defined under the Water Act 2000. Watercourse is defined in sch 10 of the (PA Page 3
Page 10
INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
local goverment tidal areas refer to Guide 24.
Uniess you answered “none of the above" to Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).
Han agency other than EPA is the assessment
manager for the application, EPAisa
concurrence agency for the application in
retation to this matter.
Local govemment is the assessment manager
for all prescribed tidal work.
IDAS Assessment Checklist, Version 20, 2 April 2007
9. The application involves operational work that is: (tick the applicable box/es)
L1 (i) _ tidal work’? as defined under the Coastal Protection and Management Act 1995 (the
. Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
Diii
tidal work that is prescribed tidal work"! other than in a canal’? -complete Part P of Form 1; OF
1 (il) carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to (i) below are ticked.
(1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water} where the development has been determined not
to be assessable against the Wafer Act 2000 ;
constructing a canal12 intended to be connected to tidat waters;
constructing an artificial waterway;
reclaiming land under tidal water;
disposing of dredge spoil or other solid waste material in tidal water;
intesfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(J (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
[1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
we None of the above.
Ob)
Ovo
Od)
De)
OM:
Og)
Operational work below high water
mark
For more information refer to Guide 18. For
more information about prescribed tidal work in
local goverment tidal areas refer to Guide 24.
Unless you answered “none of the above" to
Q10, the application triggers referral to
Queenstand Transport (QT) (Maritime Safety
Qid) as a concurrence agency.
Local government is the assessment manager
for all prescribed tidat work.
10. The application involves operational work that is: ( tick the applicable box/es)
(1 (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that i$ not prescribed tidal work - complete Pert M of Form 1; oF
( (ii) tidat work that is prescribed tidal work"4 - complete Part P of Form 1; oF
Li (iii) carried out within a coastal management district'S under the Coastal Act and for -
C1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1;
CJ (b) reclaiming land under tidal water - complete Part M of Form 1; OF
Oo)
constructing a canal2, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1; .
none of the above.
wi
Coastal management
For more information refer to Guide 18.
Unless you answered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).
Itan agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.
11. The application involves: (tick the applicable box/es)
(J (i) a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district's
(ii) a material change of use assessable under a planning scheme involving building @
work, carried out completely or partly in a coastal management district that is —
« the construction of a new premises with a GFA'S of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m2
(ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
0 completely or partly in a coastal management district
Li (iv) reconfiguring a lot” assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 - complete Part M of Form 1
C1 (v) none of the above
10 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in lhe Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the {PA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area dectared as a~
coastal management district under section 47(2) of that Act
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an arificial waterway, must be
accompanied by the application for the operational works to consuuct ihe artificial waterway.
Page 4
Page 11
INTEGRATED PLANNING ACT 1997,
Development within the limits of a
port
Fos more information refer to Guide 18. For
‘information about prescribed tidal work refer to
Guide 24.
if you answered "YES" to Q12, the application
‘triggers referrat to the Port Authority.
The Port Authority is a concurrence agency if the
development is -
* within 200m of a shipping channel or an entry
and exit shipping corridor for the port
* within 1000m of a swing basin, a commercial
stipping wharf, a mooring, anchorage or spoil
grounds; -
© within 1000m of a planned port facility
identified in a land use plan approved under
the Transport infrastructure Act 1994.
(mall other situation the Port Authority is an
advice agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark’ and within the limits of a port
under the Transport Infrastructure Act 1994?
(aio
(YES - complete Part M of Form 1, or Pait P of Form 1 if the work is prescribed tidal work
Marinas
For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide,24, The-local
govemmentis the assessment manager for all
prescribed tidal work. ,
Ifyou answered “YES" to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as'an advice agency.
Tidal works in strategic port land tidat
areas .
For thore information refer to Guide 18,
Unless you answered "NO” to Q14, the retevant
Port Authority is the assessment manager for the
application and the Environmentat Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.
Heritage
For further information refer to Guide 19.
lfyou answered "YES" to Q15, the application
triggers referral to the Queenstand Heritage
Council as concurrence agency for the
application.
Untess you answered “none of the above” to
Qt5(b), the application involves referral to the
Environmental Protection Agency as an advice
agency for the application
13.
15.
Does the application involve operational work that is tidal work for a marina‘? with more than 6
vesselberths?
aio
CU YES - complete Part M of Form 1, or Part P of Form 1 iftho tidal work is prescribed tidal work
Does the application involve tidal works within a strategic port land tidal area20?
NO : :
(DYES - complete Part Mof Form 1
Does the application involve development in a heritage registered place as defined under the
Queepsiand Heritage Act 1992?
a Ko .
(I YES - complete Part C of Form 1
15(b)The application involves: (tick applicable boxes)
DO) amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
C1 {i) reconfiguring a lot if the jot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
Ui iii) none of the above.
Declared catchment areas
For more information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13.
Untess you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
IF an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
16.
The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
C1 (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
(ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994:
P¢ (iii) none of the above
18 High water marks defined in the Coastal Protection and Management Act 1995 and means tha ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Poitutlon) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward af high water mark adjacent to strategic port land.
Page 5
Page 12
INTEGRATED PLANNING ACT 1997
Contaminated land
Applications involving material change of use
and/ or reconfiguring a lot may trigger this
feferral,
For more information refer to Guide 5.
Unless you answered “none of the above" to
Q17, the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
relation to this matter.
17,
IDAS Assessment Checklist, Version 20; 2 April 2007
The application involves: (tick the applicable box/es}
[1 (i) reconfiguring a lot for which all of part of the premises are -
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exeniption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b)_ in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
(1 (ii) a material change of use -
{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management.advice has been given for unexploded ordnance -
complete Part N of Form 1
(iii) none of the above
Electricity infrastructure
For more information refer to schedule 2of the IP
Requtation.
Unless you answered “none of the above’ to
Q18, the application triggers referral to the
agency to which the easementis granted i in
favour of as advice agency.
18.
The application involves: (tick the applicable box/es)
OD (i) reconfiguring a lot where any part of the lot is —
« subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if ~
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
C1 (iv) operational work that is filling or excavation assessable against the Planning scheme,
not associated with reconfiguring a lot, if -
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;
(v)_ none of the above.
Dii)
Diiii
Land designated for community
infrastructure
Applications involving development on land
designated for community infrastructure may
trigger this referral.
For more information refer to schedule 2 of the
IP Regulation.
\fyou answered “YES’ to 019, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
lf an agency other than the designator is the
assessmerit manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter,
Does the application involve development assessable against the planning scheme and on a)
designated for community infrastructure?
{i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -—
(a) _ for the designated purpose; or
are carried out by, or on behalf of, the designator.
CJ yYes
Page 6
Page 13
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedule 2 of the
IP Requtation.
Refer to Chapter 2, part SA and schedule 10 of
the Intearated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.
Unless you answered “none of the above” to
20, the application requires assessment by the
Office of Urban Management (OUM).
IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable bowes) - ,
OD (i) amateriat change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
DO (i) ~ anurban activity -
(1 in an area inctiided in a structure plan where the IPA, section 3.1.6
applies; . .
LJ in an area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or .
the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2: or
+ impact assessment is required under the relevant planning scheme
0 (ii) intensive animal husbandry, or
E21 (ii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
OD) () anurban activity and not specified in section 2.4(2); or
0 (i) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for -
DD (i) an urban activity and not specified in section 2.10(2);
D (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or .
OO (ii) intensive animal husbandry
1 (ii) reconfiguring a tot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
EY (ili). none of the above
Fisherles matters
For more information refer to schedule 2of the IP
_ Regulation,
Unless you answered “none of the above” to
Q21, the application requires assessment by the
Department of Primary industries and Fisheries
(OPI&F).
If an agency other than DPI&F is the assessment
manager for the application, DPI&F is a
concurrence agency for the application in
Telation to items (i) - {iv) and an advicé agency
in relation to itern (v).
21. The application involves: (tick the applicable box/es)
(1 (i) an assessable material change of use for aquaculture - complete Part 0, of Form 1;
(1 {i) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1; :
Di iii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
Ci (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(1 (¥) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
(vi) none of the above.
Page?
Page 14
INTEGRATED PLANNING ACT 1997
{ntegration of land use and public
transport
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Regulation.
Unless you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency.
Railway safety and efficiency
For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Requtation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency.
22. The application involves: (tick the applicable box/es)—~
23.
IDAS Assessment Checklist, Version 20, 2 April 2007
L (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
D (ii) reconfiguring a tot—
(J (a) on land that is completely or partly within a a public transport corridor, and the
total number of lots increases;
(J (b} on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
C1 (c}. on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(].(d) . for a residential purpose within the 25 ANEF contour for an airport;
[| (e) fora residential purpose resulting in 100 or more allotments.
LJ (iii) operational work assessable’ against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in {ii)
above, on land that—
(J (a) __ is completely or partly within a public transport corridor or a future public
transport corridor;
() (b) will result in work that encroaches into an airport's operational airspace.
4 (iv) none of the above. -
The application involves: (tick the applicable box/es)—
C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the 1P Regulation and exceeding the thresholds set by that
schedule.
C1 (ii) reconfiguring a tot—
1 (a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
[J (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m2 or
greater;
‘ (C1 (c) — onland that abuts rail corridor land, commercial corridor land or future railway
tand, and the total number of lots increases;
[J (d) on land that abuts rail corridor land, commercial corridor tand or future railway
land and an easement abutting the corridor or future railway land is created;
(1 (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(1 (f) for a residential purpose resulting in 100 or more allotments.
(1 {iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) @
above, involving extracting, excavating or filling greater than 50m3, on land that—
O(a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
[C(c) abuts rail corridor tand, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
PX] (iv) none of the above.
Moonie to Brisbane pipeline
For more information refer to schedule 2of the IP
Regulation.
Unless you answered “none of the above’, the
application tiggers referral to the holder of
pipeline licence No 1 issued under the Pelrofeum
Act 1923, currently Santos QNT Pty Lid, for
advice.
24,
The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
(1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
LA (ii) reconfiguring a fot
(1 \(iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
CX (iv) none of the above.
Page 8
e
Page 15
INTEGRATED PLANNING ACT 1997
Koala habitat area
For more information, refer to Guide 26 and
schedule 2-of the IP Reautation. /
Unless you answered “none of the above”, the
application requires referral to the Environmental
Protection Agency as a concurrence agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
25. The application involves: (tick the applicable box/es)—
C1 (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in - .
C1 {a)_ clearing of native vegetation over an area greater than 2500m2,
(1 (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;
J {c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;
[J (4) extracting gravel, rock or sand from an area ‘greater than 5000m2;
(]{e) excavating or filling an area greater than 5000m?;
(1 () additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
C7) (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -
L) (a) an increased number of lots;
(J (b) clearing of native vegetation over an area greater than 2500m?.
(J (iii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.
C1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -
(1 (a) clearing of native vegetation over an area greater than 2500m?;
[1 (b) extracting gravel, rock or sand from an area greater than 5000m?;
D(c) excavating or filling an area greater than 5000m2.
(v) none of the above.
Witd river area
For more information, refer to Guide 27
If you answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
river area because the application cannot be
accepted by the assessment manager.
26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?
NO
OYes
Preliminary Approval
Ifyou answered YES to 027, the application
tiggers referral to the Department of Local
Govemment, Planning, Sport and Recreation as
an advice agency.
27. Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the integrated Planning Act 1997?
NO
ClyYes
Wetlands
Domestic activity means the construction or use
of a single residence on a tot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretaker's residence, granny flat, building or
structure used for a home business.
Note: Wetland is defined in the Integrated
Planning Regulation 1998.
Unless you answered “none of the above" to
028, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.
28. The application involves: (tick the applicable boxes) -
C1 (i) — amaterial change of use, other than for a domestic activity, assessable against the
planning scheme fhat is in or within 100m of a wetland;
CI (ii) reconfiguring a lot -
In or within 100m of a wetland that will result in
(1 (a) more than 10 lots being created: or
LO (b) lots less than 5 hectares;
(iii) none of the above
Page 9
Page 16
INTEGRATED PLANNING ACT 1997 Conservation Estate Urban purposes is defined in the Integrated Planning Act 1997 as "purposes for which land is used in cities or towns, including residential, industial, sporting, recreation and commercial purposes, but not including environmental, conservation, rural, natural or wildemess area purposes”. Unless you answered “none of the above" to Q29, the application involves referral to the * Environmental Protection Agency as an advice agency for the application. IDAS Assessment Checklist, Version 20, 2 April 2007 29. The application involves: (tick the applicable box/es)—- (71 (i) amateriat change of use for urban purposes that is in or within 100m of any of the following - (1 (a) a protected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992;; (1 (b) a State forest or timber reserve under the Forestry Act 1959; [1 (c) amarine park under the Marine Parks Act 2004; (1) @) arecreation area under the Recreation Area Management Act 1988; (Je) aworld heritage area listed under the World Heritage Convention; [1 () Brisbane forest park under the Brisbane Forest Park Act 1977. C1 (ii) reconfiguring a lot if - 1 (2) _ any part of the lot is situated in, or within 100m of, any of the following ~ C(i) — aprotected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992; LC (ii) a State forest or timber reserve under the Forestry Act 1959: LH (ii) amarine park under the Marine Parks Act 2004; C1 (iv) arecreation area under the Recreation Area Management Act 1988; (1) __ aworld heritage area listed under the World Heritage Convention; Brisbane forest park under the Brisbane Forest Park Act 1977; and [1 (b) the reconfiguration involves more than 10 lots being created, or any lot resulting from the reconfiguring is less than Sha; £4 (iii) none of the above. Page 10
Page 17
INTEGRATED PLANNING ACT 1997
. SECTION 2 - ASSESSMENT IN A WILD RIVER'AREA :
(completion mandatory if the proposed development is located in a wild river area)
‘
V /A-
IDAS Assessment Checkist, Version x, 2 Apal 2007
f
Wild River Area
It the responsibility of the applicant to
determine if the development is proposed in
a wild river area.
Information about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.nnw,qld.gov.au or
contacting the department by email on:
wild [email protected]
Note on Referrals
Referrals for development in a wild river area
(other than for agriculturat activities and animal
husbandry activities) are not changed from the
existing referral arrangements.
Notes on development assessable
against the Wild Rivers Code
For Information regarding development in a witd
river area, see the relevant wild river declaration
and Guide 27. The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wid river requirements.
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas, The relevant
declaration will provide the information applying
to each wild river area.
Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area (PA}, must
be assessed against and must comply with the
Wild Rivers Code where indicated in a retevant
wild river declaration.
1.
Which wild river area is the development proposed in?
The proposed development is to.be located in: (tick the applicable boxes)
(_]i) a high preservation area (HPA):
O ii) a preservation area (PA) ;
CJ ili) a wild river floodplain management area (FMA);
i) iv) a wild river nominated waterway;
(_] v) a designated urban area (DUA).
Environmentally relevant activities
{ERAs) in a designated urban area
ifyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
femaining questions in Section 2,
If you answered NO to Q2, please complete the
remaining questions in Section 2.
Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or
ti) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
O YES (ensure you have completed Part G of Form 1)
LI No
Clearing native vegetation
If YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA.
If YES and you ticked 04 box i) the application
may be made and is assessable against the Wild
Rivers Code. If YES and you ticked Q4 box ii)
the application will not be accepted.
Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.
4.
!s the application operational work for clearing native vegetation in a HPA?
LINno
If YES, is the clearing?
CJ YES (ensure you have completed Part J of Form 1)
Oo i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or
im ii) in a HPA outside a registered area of agriculture?
Page 11
Page 18
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 Works in tidal areas, coastal management districts and fish habitat areas \fyou answered YES to Q5, and ticked any boxes in Q6), your application is required to be assessed against and must comply with the Wild Rivers Code. lfyou answered YES to Q5 and ticked box j) in Q6, your application is required to be referred to the EPA. Note: Hf specified works are proposed in a local govemment area, it is prescribed tidal! work - the relevant local government will be the assessment manager with the EPA as a concurrence agency \f you answered YES to Q5, and ticked box il) or iii) in Q6, your application requires referral to OPIF. \f you answered NO to Q5 and ticked box i} in Q6, the application wilt not be accepted. If you answered NO to Q5, ticked box ji) in Q6 and the development is necessary to install authorised works or infrastructure where a development permit is not required, o7 if a ‘tequired permit is held, the application must be assessed against and must comply with the Wild Rivers Code. Applications for purposes other than specified works or as described above will not be accepted, If you answered NO at Q5 and ticked box iii) in Q6, the application may be made if the works are ina PA. These applications must be assessed against and must comply with the Wild Rivers Code. The application will not be accepted if the development is proposed to be located in a HPA. For more information about specified works refer to Guide 27 Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27- Development in a wild river area) (J) no (yes The application is for one or more of the following: O i) Operational works that is tidal works or works in a coastal management district (ensure you have completed Part M and/or Part P of Form 1); or oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have completed Part O2 of Form 1); Of Oo iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1). Residentiat, commercial or industrial development \f you answered YES to Q?, your application is hot subject to wild river requirements. Provided there are no other aspects of this development that require assessment against the relevant wild river declaration or Wild Rivers Code, you do not need to complete the remaining questions in Section 2. If you answered NO to Q7 and ticked either box i) or i) in Q8, the assessing agency is the relevant local government. The application must be assessed against and must comply with the Wild Rivers Code. 7. 8. Is the application for residential, commerciat or industrial development in a designated urban area? Ono C1 yves If NO, does the application for residential, commercial or industrial development involve: (Ji) a material change of use made assessable in a local government planning scheme (ensure you have completed Part D of Form 1); or Oj ii) operational works associated with reconfiguring a lot (ensure you have completed Part F of Form 1). Animal husbandry activities if you answered YES to Q9 your application requires assessment against and must comply with the Wild Rivers Code. The assessing agency is NRW. Note: Applications for animal husbandry activities will not be accepted if proposed in a HPA. For more details and a definition of animal husbandry activities see the Wild Rivers Act 2005 and refer to Guide 27. Does the application involve a material change of use for animal husbandry activities (as defined under the Wild Rivers Act 2005) in a PA? CINo O YES (ensure you have completed Part R of Form 1) Agricultura! activities Ifyou answered YES to Q10, your application requires assessment against and must comply with the Wild Rivers Code. The assessing agency is NRW. Note: Applications for agricultural activities wit not be accepted if proposed in a HPA. For more details and a definition of agricultural activities see the Wild Rivers Act 2005 and refer to Guide 27. The production of fodder in a PA, and pasture improvement using low impact soil disturbance techniques is not an agricultural activity as defined under the Wild Rivers Act 2005. For more information see Guide 27. 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in a PA? oO NO O YES (ensure you have completed Part Q of Form 1) IF YES is the application for: (J i) a material change of use; or ii) operational works. Page 12
Page 19
a INTEGRATED PLANNING ACT 1997 Works that take overland flow water The relevant wild river declaration will state works that take overland flow water are either self assessable of assessable, or are exempt from wild river requirements. Ifyou ticked Q13 i}, your appfication must be assessed by NRW against the Wild Rivers Code and must comply with the code. Ifyou ticked Q13 ii) an application is not required to be made however the works must comply with the relevant self-assessable section of the Wild Rivers Code, otherwise the works become assessable development for which an application is required and must be assessed by NRW. against the relevant part of the Wild Rivers Code and must comply with the code. Ifyou ticked Q13 if) your application is not subject to wild river requirements. Applications for development that is other than that stated to be assessable, self-assessabfe or exempt will not be accepted. 13. IDAS Assessment Checklist, Version 20, 2 April 2007 Does the application involve works that take overland flow water in a HPA or an FMA? Oo NO (YES (ensure you have completed Part Ke of Form 1) If YES, is the application for works stated in the relevant wild river declaration to be? (Ji) assessable works , (ii) self-assessable works Lit) exempt works Works that interfere with overland flow water The relevant wild river dectaration wilt state works that Interfere with overtand flow water that are either self assessable, assessable or exempt from wild river requirements, if you ticked Q15 i), your application must be assessed by NRW against the Wild Rivers Code and must comply with the code. If you ticked 015 ii) an application is not required to be made however the works must comply with the relevant self-assessable section of the Wild Rivers Code, otherwise the works become assessable development for which an application is required and must be assessed by NRW against the retevant part of the Wild Rivers Code and must comply with the code. If you ticked Q15 iii) your application is not subject to wild river requirements. Applications for development that is other than that stated to be assessable, self-assessable or exempt will not be accepted. Waterway barrier works Applications for building or raising waterway barrier works in a HPA will not be accepted. If you answered YES to Q16, your application Must be assessed by DPIF against the Wild Rivers Code and must comply with the code. 16. Does the application involve works that interfere with overland flow water in a FMA? oO NO oO YES (ensure you have completed Part Kio of Form 1) - If YES, is the application for works stated in the relevant wild rivers declaration to be? (Ji) assessable works OQ ii) self-assessable works Dili) exempt works Does the application involve building or raising waterway barrier works in a PA? O NO oO YES (ensure you have completed Part O3 of Form 1) @ Aquaculture (non ERA) Applications for aquaculture in a HPA will not be accepted. lf you answered YES to Q17, your apptication must be assessed by OPIF against the Wild Rivers Code and must comply with the code. Does the application involve aquaculture in a PA? O NO | YES (ensure you have completed Part O; of Form 1) Works that interfere with water in a watercourse Note: If the development is proposed in a HPA, applications for all works that interfere with water in a watercourse (including dams or weirs, stream realignment or stream diversion) will not be accepted. in a PA, applications for instream dams and weirs may be accepted in nominated waterways. If you ticked box ii) in Q19, your application will not be accepted, Note: Operational works outside a HPA or nominated waterway are not subject to wild river requirements. More information and locations of nominated waterways is available by contact NRW, accessing the department's website www. nnw.gid.gov.au or contacting the department by email on: wild. [email protected] the application involve operational works that interfere with water in a watercourse that is in a nominated waterway in a PA? Ono O YES (ensure you have completed the relevant Part K of Form 1) if YES, O i) The application is for an instream dam or weir; or oO ti) The application is for operational works that interfere with water in a watercourse, and is for development other than a dam or weir. Page 13
Page 20
INTEGRATED PLANNING ACT 1997
Environmentally relevant activities
Most apptications for an ERA in a HPA will not
be accepted. Applications which may be made
tequire referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local government (see EPA website for more
information on devolved ERAs)
lfyou answered NO to Q20 you do not need to
complete Qs 21-24.
\Fyou answered YES to Q20 and the
development is in a PA, your application must be
assessed by the administering authority?*
against the Wild Rivers Code and must comply
with the code, unless the propasal is for
development where an application will not be
accepted, or is exempt from wild river
requirements (see 2). You will be able to
determine if an application will not be accepted
for the development by answering Q21 - Q24.
if you answered NO to 021, you do not need to
complete Q22. Ifyou answered YES to Q21 you
are required to complete Q22.
if you answered NO to Q22, the application will
Rot be accepted. if you answered YES to Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply .
with the code. .
\f you answered NO to Q23 and the development}
is proposed in the HPA the application will not be
accepted. If you answered YES to Q23, the
application must be assessed by the EPA or
NRW {as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.
It you answered YES to Q24 the’application will
not be accepted. If you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.
Exempt ERAs in a designated urban
area
It the development is proposed in a designated
urban area there may be no wild tiver
fequirements. See Section 2 Q2.
Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area).
20.
21.
22.
23.
24,
Does the application involve an ERA?
(] No
Is the application for an ERA 20 instream?
CJ No Cyves
IDAS Assessment Checklist, Version 20, 2 April 2007,
(J YES (ensure you have completed Part G of Form4)
{s a quarry allocation notice held for the proposed ERA 20 instream?
LJNo CJ Yes
Does the application involve any of the following in a HPA?
i) alevel 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)
iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 {out of stream)
L]}no Clyes
Is the proposed development for ERA 20 (out of stream) and;
~ in aFMA; and
~ notlow impact; and
— not for a residential complex in the area, or for specified works.
CNno Cl yes
Documentation
if you answered NO to Q25, your application
may be subject to an information request and
processing of the application may be delayed,
25,
Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirement gy
as set out in the relevant part/s of the Wild Rivers Code?
Ono Dyes
% The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.
Page 14
Page 21
ING ACT 1997
IDAS Assessment Checklist, Version 20, 2 Aol? 2007
SECTION 3 ~
BUILDING REFERRALS (completion not mandatory) = i
Below is a list of the referrats that can apply to an application for building work assessable against the Building Regulation 2006. This section of the {DAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
Special fire services - generally 1,
For more information go to schedule 2 table 1 and
| scheduta 2A of the [P Regulation.
Assessment period 15 days. No response is a
deemed refusal. :
An application may tigger referral to Qid Fire and Rescue Services as an advice agency if the building work
requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(IP Regulation) or includes an altemative solution assessed against the performance requirements of the
Building Code of Australia.
Fire safety for budget accommodation | 2.
For more information go to schedule 2 of the IP
Requiation
An application may trigger referrat fo Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.
Spray painting 3.
For more information go to schedule 2 of the IP
Regutation
An application may trigger referral to the Department of industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.
Retail meat premises 4.
For mate information go to schedule 2 of the Pe
Regulation
An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
tetail meat premises.
Private health facilities 5.
For more information-go to schedule 2 of the IP
Regulation
An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.
Workplace area less than 2.3m? 6,
For more information go to schedule 2 of the IP.
Regulation
An application may trigger referral to the Department of industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m?,
Land contiguous to a State-controlled | 7.
road
For more information go ta schedule 2 of the IP
Regulation
An application may trigger referral o the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlied road.
Pastoral workers accommodation 8.
For more information go to schedule 2 of the [P.
Regulation
An application may trigger referral to the Depariment of Industrial Relations (DIR) as a concurrence agency
if the application involves pastorat workers accommodation.
Child care centre 9.
For more information go to schedule 2 of the [P-
Regulation
An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.
Coastal development 10.
For more information go to schedule 2 of the [P
Requlation
An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves tand completely or partly seaward of a coastal building line”.
Heritage 11.
For more information go to schedule 2 of the IP
Regulation
An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.
Fisheries matters 12.
For more information go to schedule 2 of the IP
Regulation
An appiication may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.
Integration of land use and public 13.
transport
For more information go to schedule 2 of the IP
Regulation ”
An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace?s.
Railway safety and efficiency 14.
For more information go to schedule 2 of the [P
Regulation
An application may trigger referral to Queenstand Transport as a concurrence agency if the application
involves future railway Sand.
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For alt
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.
Amenity and aesthetic impact of 15.
particufar building work for single
detached class 1 building or class 10
building or structure
For more information go to schedule 2 table 1 of the
IP Regulation.
Assessment period 15 days. No response is 2
deemed approval.
An application will trigger a referral to the local government if itis :
* fora single detached class 1 building or class 10 structure; and
© the local government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality.
2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995,
3 Operational airspace is as defined in State Ptanning Policy 1/02 “Development in ihe Vicinily of Certain Airports and Aviation Facilities”.
Page 15
Page 22
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version Whether particular buildings maybe | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a occupied for residential purposes teferral to the local government as the concurrence agency. For more information go to schedule 2 table 1 of the IP Requiation. Assessment period 15 days. No response is a deemed refusal. Design and siting 17. An application may trigger referral to the local govemment as the concurrence agency if the building work For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code. IP Requtation, 18. An application may trigger referral to the local goverment as the concurrence agency if the building work Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover. deemed refusal. 19. An application may trigger referral to the local govemment as the concurrence agency if the building work . does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 of 9 of the Queenstand Development Code, part 11 or 12. Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has For more information go to schedule 2 table 1 of the been completed. . IP Requlation. Assessment period 15 days. No response is a deemed refusal. : Higher risk personal appearance 21. An application may trigger referral to the focal government as the concurrence agency to determine if the services building work For more information go to schedule 2 table 1 of the * complies with the performance criteria of the Queenstand Development code part 15; and IP Regulation and the QDC past 15. ¢ the work does not comply with an acceptable solution stated in the part. Assessment period 15 days. No response is deemed refusall. . . . . Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential For more information go to schedule 2 table t of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger §P Regulation and the QOC part 20. referral to the-local government as the concurrence agency. Assessment period 15 days. No response is a deemed refusal, Building work for removal or 23, An application for the removal and/or rebuilding at another site of a building or other structure, will trigger rebuilding referral to the local government as the concurrence agency. For more information go to schedule 2 table 1 of the IP Regulation. Assessment period 5 days. No response is deemed refusal. Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the designated rainwater tank area For more information go to schedule 2 table 1 of the iP Regulation and the QOC pan 25. Assessment period 15 days. No response is a deemed refusal. building work or structure complies with the relevant performance criteria if - « Under the Building Regulation 2006, a rainwater tank is proposed to be instalied as part of relevant building work, in a designated rainwater tank area; and ¢ Under the Queensland Development Code, part 25; the rainwater tank does not include an acceptable solution for a relevant performance criteria. Page 16
Page 23
Stisrinic @ OTE FAN ‘ ee? Sarorer __. i220 LLY 27 JUL 2007 Uji Wi ig Cro . Propose Zlzco tows RF Oe 4420 | “ ~~] | ee Se Wrst A Sos, EOL GAa | l a oh. zeal Dio Ht FAS 2052 [EIS AT ASO ors fe 2eox sore WATE . Se = TERWTE RETICOUENeN <nsreny , cee hy Py gene, RECOTING SIE? EH WN S Se Rips : et | | sts © scctt0n ~ 29 WARE VES O-ER_ 22 lar Tin . ! aD Pons Z| cmp = NO E Teaser pecks 32. UenieaR ARE, ro7 2.9.2 Eeteer PART _ DATE 4 fer DRAWN BY QWNER, | SCALE [fees
Page 24
XN
a,
5007
rman ea >)
, GENERAL NOTES
' - 1 THE CONTRACTOR SHALL VERIFY ALL SETTING OUT DIMENSIONS PRIOR TO
COMMENCEMENT OF WORKS,
|
7
EXISTING CONCRETE ROOF TILES
2 THESE, DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE
ARCHITECTURAL DRAWINGS ANO ANY OISCREPANCIES SHALL BE REPORTED
10 THE ENGINEER BEFORE PROCEEDING WITH THE AFFECTED PORTION OF
- THE WORK,
/ oN .
we a4 “ \ POLE PLATE: 00 NOT QBTAIN DIMENSIONS BY SCALING FROM THESE ORAWINGS.
Y
fv N\
4
/ \
ROOF SHEETING exagting CONCRETE ROOF TILES
ROOF SHEETING SHALL BE CUSTOM ORB COLORBONO FINISH / ‘
FIXED IN ACCORDANCE WITH MANUFACTURES INSTRUCTIONS, —
ROOF BATTENS @ 900mm CENTRES
ALL WORKMANSHIP ANO MATERIALS SHALL BE IN ACCORDANCE WITH
THE REQUIREMENTS OF THE CURRENT EDITION OF SAA CODES AND
THE BUILDING CODE OF AUSTRALIA.
N.
et ee ance van he wn see
EXISTING ROOF BEAM+RB2 eN
S THE CONTRACTOR SHALL CHECK THE LOCATION OF ALL UNDERGROUND
we ~ SERVICES FOR ALIGNMENT AND LEVEL PRIOR TO THE COMMENCEMENT OF
att ee
a
B2
CONSTRUCTION.
TOPSPAN TS40 AT 900mm CENTRES FIXEO WITH FASCIA PLATE: 22-450 6 ANY DISCREPANCIES BETWEEN THE INFORMATION SHOWN ON THE
2/No 16 TYPE 17 x SOmm TEKS OVER EACH SUPPORT. 7 DRAWINGS AND THOSE DETERMINED ON SITE SHALL BE REFERRED TO
R1-800 c THE ENGINEER BEFORE PROCEEOING WITH THE WORK..
Ee Lh . a
et rm a, a oa TIMBER NOTES
30x0.8mm GALVANISED 1 ALL WORKMANSHIP ANO HATERIALS SHALL BE IN ACCORDANCE WITH
STRAP BRACING. \ . ASI720 AND AS1604,
FASCIA PLATE: vB 2 ALL TIMBER FRAMING AND MINIMUM SIZES UNLESS NOTED OTHERWISE
ROOF FRAMING PLAN | | SHALL BE IN ACCORDANCE WITH AS1684,2 N3 CLASSIFICATION,
No, 14 TYPEI7. (SK HEAD . 2 ALL TIMBER STORED ON SITE SHALL BE PROTECTED FROM THE WEATHER
RAFTER, SoReM AT EACH eck RAFTERS RE 120435 (NGP12) JOIST HANGER AT EACH END AND STACKED CLEAR OF THE GROUND.
\ BEEK hove ara Rey xaten seer? GALVANISED BOLTS AT EACH SUPPORT 4 DURING CONSTRUCTION THE STRUCTURE, SHALL BE MAINTAINEO IN A
R25 DOUBLE SIDED So ° Kine. GROUND FLOOR DECK FRAMING PLAN STABLE CONDITION ANO NO PART SHALL BE OVERSTRESSED, THE
ANTICON INSULATION QECK JOISTS J2: 100R50 {F16) oF 120x35 {F17) JOIST HANGER AT EACH SUPPORT BUILDER SHALL PROVIDE TEMPORARY ‘BRACING ANO SUPPORT TO KEEP
i or 120x35 (F17) THE WORKS STABLE AND IN ALIGNMENT AT ALL TIHES UNTIL ALL
DECK BEARER B2: 150x50 (F14) ar 150x50 (F17) 2/HI2 GALVANISED BOLTS AT EACH SUPPORT DIM ACCORDANCE WITH THE
MEMBERS ARE INSTALLED ANO CONNECTED 1
DECK BEARER B3: 150x50 (F44) or 150x50 (F17) 2/M12 GALVANISED BOLTS AT EACH SUPPORT DETAILS PROVICED ON THE DESIGN GRAMINGS
t Is ERS OR EBGE JOISTS .
CC150x75x5,0 FIXED TO EXISTING ROOF BEAM WITH POLE PLATE PP: 150x50 (F14) FIXED TO TIMBER BEAR
= M2 GALVANISED BOLTS AT 800mm CENTRES. WITH M12 BOLTS AT 900 CENTRES. 5 ALL TIMBER SHALL BE PROTECTED FROM INSECT ANO/OR MOISTURE
ae PROP EXISTING BEAM AT MIDSPAN & DEFLECT UPWARDS ATTACK IM ACCOROANCE WITH THE REQUIREMENTS OF THE BUILOING
GY tOmm WHILE ATTACHING CCIS0 TO EXISTING BEAK, / CODE OF AUSTRALIA ARD AS36860,
i li | 6 ALL TIMBER EXPOSED TO WEATHER SHALL HAVE A OURABILITY
| | CLASS 1 OR 2 OR PRESERVATIVE TREATED TO H3 HAZARO LEVEL,
4.5mm FC LINING FIXED To '
7 WHERE PREFABRICATED ROOF TRUSSES ARE SPECIFIED ON THE DESIGN
BATTENS AS C80 COM | Laem a ee ed | DRAWINGS THEY SHALL BE DESIGHEO AND FABRICATED BY A SPECIALIST
| ! CONTRACTOR. TRUSSES ARE TO BE BRACED IN ACCORDANCE WITH THE
LA POLE PLATE \ MANUFACTURES INSTRUCTIONS.
|
15x38 {F14) BELOW JOIST DECK | g
BRACING FIXED AT EACH JOIST ! s
WITH 1783,15x70mm NAIL OR | TARGET FOUNDATION MATERIAL: DENSE SILTY SANO/ STIFF
BATTEN SCREW, ie | SANDY CLAY: SBV 100 kPa.
'
aha owe nn ol 4
a THIS FOOTING & SLAB SYSTEM HAS BEEN DESIGNED FOR;
i | CLASS P/M SITE
450 eo
; I =
@
-4 —_ A ey 4
j <a f r | ¢
bo J =
LEVEL 1 DECK FRAMING PLAN ENGINEER CERTIFICATION:
A
: J.T, COX CP Eng FIE Aust RPEQ No, 5880
DECK WISTS Jt: 200x50 (F14) or 200xS0 (F17} JOIST HANGER AT EACH EXD
DECK BEARER Bt 200x400 4F17) or 250x50 (F17) 2/H12 GALVANISED BOLTS AT EACH SUPPORT a >
POLE PLATE PP: 120x50 (F14) FIXED TO TIMBER WALL FRAME OR EDGE JOISTS a
WITH M10 BOLTS AT 900 CENTRES. 3600
(PEVEL 1 { Date: 12th JULY 2007
voveutentieeten i i 2/M12 GALVANISED BOLTS
yn 1 BORED PIER LAYOUT
bette et eeee ees - . Pi
BZ] wa EXISTING PLATFORM FLOOR To BULK PIER Pt; 500x500x1000 DEEP CONCRETE STRENGTH, F'c=32MPa DESIGN CRITERIA
POST Pt: 100x100 (FIG) 2/12 GALVARISED BOLTS & S0xS 3
EXISTING FLOOR JOISTS WITH 62.8mm GALVANISED FULL STIRRUP POST ~=BEARER CONNECTION WIND LOAD CLASSIFICATION: N
x 50mm NAILS AT 150mm CENTRES OVER ANCHOR-350mm EMBEOMENT
THREE JOISTS ADJACENT TO DOOR OPENING, . TO POST P1
PROPOSED DECK FRAMING
£ COJA CONSULTING ENGINEERS PTY (TO AT 52 WOONGAR STEET-BOREEN POINT
CONSULTING STRUCTURAL ENGINEERS FOR NIGEL PILKINGTON.
JOIST HANGERS ARE TO BE CONRECTED TO 263 PRYOR ROAD \VERRIERDALE OLO 4562
RARS AT CACH SUPRORT oorremnoxtOan i TEL: (07) 5671 4385 FAX: (07) S474 1386 DECK FRAMING ARRANGEMENT & DETAILS. - —
SCALE: SHEET “DRAWING NUMBER: REVISION
: TYPICAL JOIST HANGER JT COX CP Eng FIE (Austl, NPER, RPEO . L57 | SIZE: . 0
REVISION DETAILS OATE RPEO Wo.SE80 15100 A3 06-1057
Page 25
ieee [AND USE SECTION FEES 7 Oa 7 RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation . 520 Copy of Permit/Approval Letter . 110 ‘The Noosa Plan Documentation . 111 APPLICATION FEES , Material Change of Use - Code/lmpact / Consistent §21 Inconsistent 521 - Assessment under Superseded Planning Scheme 521 Modification to a Development Permit - 521 Extension of a Currency Period . 521 Operational Works - Landscaping : : §21 Bldg Work assessable against the Planning Scheme & oe ) 521 PRE LODGEMENT REVIEW Half Hour” §22 One Hour : 522 ADVERTISING Purchase Advertised Applications 523 JETTIES Jetty Application Fee 524 ’ Jetty Bond : 51 : : (Category 4) BONDS . : Performance Bond : : 4 (Category 9) SIGNS 7 : | . Registration Fee , . ‘ a ; 222 $s H FEE . Search of Land Use Section file 112 Liquor Licensing Request : : 113. ‘TOTAL. $ bXYO NAME: Oe & Kobetyan ADDRESS: Glossar Creo _ _. Sur Stine. GGrcu “Tbk - FILENO: — 09] (873 DATE: — 19/4/07 RECEIPTNO: |! UZ CY _ signature of TP Officer: AUTHORITYNO: _ _ | 2o09 [0873 ])
Page 26
CALCULATION OF FEES APPLICATION | FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0° Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Used in these records
07/1873 - Preliminary Building Works Assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.