INTEGRATED PLANNING ACT 1997
Land owner's consent (if applicable)

Saction 3.2.1(3) of the IPA prescribes that an

[ epplicaion must contain, or be supported by, the
{writien consent of the land owners, if the application
| involves:

iy a material change of use;

‘fi reconfiguration of 2 bot

1) work on tand below high-water mark & not within @
¢ canal es defined under the Coastal Protection and
{ _ Management Act 1995;0r

{fv) work on rail corridor land defined under the

1 Transport infrastructure Act 1994.

Section 3.8.1(2){a) of the IPA provides that
landowner's consent is pot required for a mobile or

* temporary ERA .

3 For more information refer to Guide 1

20. Land owner's consent to the making of this application:

Part A, Version 2.4, 29 May 2006

 

 

 

 

 

 

Name Signature Date
9 hea 2 Phin Tort oeccceeccceeeeeceeeeceeeeseneefeeesseseees
(i)
wees
f@ 0 fee

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

“Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
, Sexton 3.2.46) of the IPA requires evidence of quany material on State coastal land under the Coastal Protection and Management Act 1995)?
resource entitlement be given for applications that
involve a presoribed State resource. LANO - g0 to a24 [7] YES - go to.022
Sata a en sean naan 22. This application is accompanied by evidence: (tick applicable box)
without evidence of the resource entiiement (1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to 023(v)
* Advice for completing 071 & 22
Refer to schedule 10 of the intagrated Planning (1 fii) the chief executive of the department administering the resource is satisfied the
” Regulation 1998 thal prascribes the nature of eviden j is con i i -
“aud oY the Sista insupportot the ‘edging Sf he development is consistent with an allocation of, or entittement to, the resource - go
felopment application.

(J (ili) the chief executive of the department administering the resource is satisfied the
development application may-proceed in the absence of an allocation of, or
entitlement to, the resource — go to Q23

: Advice for completing 023 23. Evidence of the resource entitlement:
requred une 23 erence” | i) Resoures entitlement / authority details (vi) Offical stamp of the department
Reset Sana ec
‘Resources, Mines and Water is mandatory where the . applicable)
application involves any water or riverine quary {ii} Name of delegated officer
metro Cd
Section 3.2.1{5A) allows the a ae to ft
the time the avid be used. i} must ‘il iti
Toad Ee cae eee O25 (4) ms (ii) Position of a Officer

{iv) Signature of delegated officer :

(v) Date

(vi) pe date of evidence a

‘Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?

; This checkiist does pet apply i the application requires (Yes [1] NO ~ the assessment fuse to

ithe completion of Parts A and B ofthe F It manager may refuse to accept this appication onthe
“Tusk be comps tor al ter aplication " grounds thet the epplication has not been properly made .

Plans / drawings / repo! . Plans/drawings/re accompanying this application:

Plans / drawings / reports 25. Plans/drawings/reports ac thi licati

; An application should be accompanied by details to
‘support the proposal & enable the assessment

s manages, referral agencies and any person viewing

* the application during public scrutiny or public
notification to understand the scope of the proposal

+ and any potential impact. .
r

 

 

Plan / Drawing / Report Number

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

 

OFFICE USE ONLY (eppticabie to ssessmient manager's}

 

 

 

[em 650 | ene [17/9/25 [ee PS OS | eee mes O(. 273_|
SS Nall ication of Engagement of Private Certifier (Optiona! forma}
To. Council. | have been engaged as the private certifier for the building work referred to in this application.

 

 

Oateofengagement / /

Accreditation Number.

Name:

Signature:

 

 

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1873 - Preliminary Building Works Assessable against planning scheme [As Published].pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.