Minor Change Existing Approval 51992 539 02 [As Published]

of 6

Page text read automatically using OCR, there may be inaccuracies

               4.     ASSESSMENT MANAGER CONDITIONS

               (A)    Approve the application, subject to the following conditions:-
               1.     Submission to and approval by Council of building plans in accordance with the Building Act,
                      Council's By-laws and Policies, the conditions of this approval and substantially in
                      accordance with plans numbered 9220SK01, SKO3, SKO5, SKO6, SKO7, SKO8, SKO9,
                      SKOIO, Site Plan referenced 2024-177 SD02 Rev A, prepared by SEQ Patio Group, dated
                      25/04/2024, Elevations referenced 2024-177 SD03 Rev B, prepared by SEQ Patio Group,
                      dated 13/06/2024 and the Shire of Noosa Planning Scheme, apart from where amendments
                      are required or dispensations have been granted in conjunction with this approval
               2.     The plans submitted for Building Approval are to modify the carparking layout and driveway
                      between units 1 to 6 and 41 to 44 such that several of the visitors spaces are relocated
                      elsewhere on site to reduce the impact of carparking within this western area.
                      Additional details as to compliance with Council's design standards for the carparking layout
                      will be required to be submitted
               3.     Provision of at least 77 off-street car parking spaces, comprising 51 covered spaces and 26
                      uncovered spaces, and access thereto which are to be provided with a sealed pavement and
                      designed, drained, constructed and maintained in accordance with the Planning Scheme,
                      Council's Policies and to the reasonable satisfaction of the Shire Engineer. Plans and
                      specifications for these works are to be submitted to the Shire Engineer for approval in
                      conjunction with the Building Application. A Building Approval shall not be granted until the
                      Shire Engineer has approved of the carparking and access scheme.
               4.     Payment to Council of $8620 in accordance with Council's Policy on Development in the
                      Noosa River Flood Plain, prior to the issue of Building Approval.
               5.     There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the
                      creation of excessive noise, lighting nuisance or other emissions.
               6.     The open space and setback areas are to be landscaped in accordance with Council's Policy
                      on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and
                      approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping
                      is to be completed in accordance with the approved landscape plan, prior to the premises
                      being occupied and maintained at all times thereafter to the reasonable satisfaction of the
                      Shire Planner.
               7.     Any fencing provided in conjunction with the development is to be setback an average of two
                      (2) metres to any road frontage pursuant to clause 36 (6) (c) of the Schedule to the Planning
                      Scheme.
                      No fencing is to be provided between the buildings or the jetties along the canal frontage.
               8.     Existing trees on the site and within road reserves are to be retained, except where required
                      to be removed due to building operations or the conduct of the approved use.
               9.     Construction work and other associated activities are permitted only during the hours of 7.00
                      a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except where
                      extended hours are approved by the Building Surveyor
               10.    Payment of contributions in accordance with Council's Policy on Water Supply and
                      Sewerage Headworks, current at the time of Building Approval. An estimate only of
                      the charges as at November, 1992 under the current policy is as follows:-
                      Water Supply - $169,000
                      Sewerage -       $ 61,158
                      __________________
                      TOTAL:           $230,158




                                                                                                      Page 2 of 6
Document Set ID: 23303519
Version: 3, Version Date: 17/10/2024


[OCR of page images]
4. ASSESSMENT MANAGER CONDITIONS

(A) Approve the application, subject to the following conditions:-

1. Submission to and approval by Council of building plans in accordance with the Building Act,
Council's By-laws and Policies, the conditions of this approval and substantially in
accordance with plans numbered 9220SK01, SKO3, SKO5, SKO6, SKO7, SKO8, SKO9,
SKOIO, Site Plan referenced 2024-177 SDO2 Rev A, prepared by SEQ Patio Group, dated
25/04/2024, Elevations referenced 2024-177 SD03 Rev B, prepared by SEQ Patio Group,
dated 13/06/2024 and the Shire of Noosa Planning Scheme, apart from where amendments
are required or dispensations have been granted in conjunction with this approval

2. | The plans submitted for Building Approval are to modify the carparking layout and driveway
between units 1 to 6 and 41 to 44 such that several of the visitors spaces are relocated
elsewhere on site to reduce the impact of carparking within this western area.

Additional details as to compliance with Council's design standards for the carparking layout
will be required to be submitted

3. Provision of at least 77 off-street car parking spaces, comprising 51 covered spaces and 26
uncovered spaces, and access thereto which are to be provided with a sealed pavement and
designed, drained, constructed and maintained in accordance with the Planning Scheme,
Council's Policies and to the reasonable satisfaction of the Shire Engineer. Plans and
specifications for these works are to be submitted to the Shire Engineer for approval in
conjunction with the Building Application. A Building Approval shall not be granted until the
Shire Engineer has approved of the carparking and access scheme.

4. Payment to Council of $8620 in accordance with Council's Policy on Development in the
Noosa River Flood Plain, prior to the issue of Building Approval.

5. There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.

6. | The open space and setback areas are to be landscaped in accordance with Council's Policy
on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and
approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping
is to be completed in accordance with the approved landscape plan, prior to the premises
being occupied and maintained at all times thereafter to the reasonable satisfaction of the
Shire Planner.

7. Any fencing provided in conjunction with the development is to be setback an average of two
(2) metres to any road frontage pursuant to clause 36 (6) (c) of the Schedule to the Planning
Scheme.

No fencing is to be provided between the buildings or the jetties along the canal frontage.

8. Existing trees on the site and within road reserves are to be retained, except where required
to be removed due to building operations or the conduct of the approved use.

9. Construction work and other associated activities are permitted only during the hours of 7.00
a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except where
extended hours are approved by the Building Surveyor

10. Payment of contributions in accordance with Council's Policy on Water Supply and
Sewerage Headworks, current at the time of Building Approval. An estimate only of
the charges as at November, 1992 under the current policy is as follows:-

Water Supply - $169,000
Sewerage - $ 61,158

TOTAL: $230,158

Page 2 of 6
Document Set ID: 23303519

Version: 3, Version Date: 17/10/2024

Log in to download the original (Minor Change Existing Approval 51992 539 02 [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.