Skip to the record
Accept no imitations.

Council archive · source document

181002_25 Kauri St_Cooroy_B_Final · MCU18/0165

Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Planning Report & Engineering Report) - MCU18/0165.

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

25 Kauri St, Cooroy                                                                                            360 Civil Consulting Pty Ltd




Table of Contents
1.     Introduction ........................................................................................................................ 1
2.     Data Sources ....................................................................................................................... 1
3.     Site Description ................................................................................................................... 2
4.     Proposed Development ...................................................................................................... 4
5.     Access.................................................................................................................................. 4
6.     Sight Distance Assessment ................................................................................................. 4
     6.1      Available Sight Distance .......................................................................................................... 4
     6.2      Sight Distance Requirements .................................................................................................. 6
     6.4      Sight Distance Improvements ................................................................................................. 6
7.     Car Parking and Turning Movements ................................................................................. 7
8.     Frontage Works .................................................................................................................. 7
9.     Stormwater Management – Quantity and Quality............................................................. 8
10. Earthworks .......................................................................................................................... 8
11. Waste Management ........................................................................................................... 8
12. Sewer Connection ............................................................................................................... 8
13. Water Connection and Fire Hydrant Location .................................................................... 9
14. Conclusion......................................................................................................................... 10
Appendix A – Development Layout by All Design and Drafting .............................................. 11
Appendix B – Contour and Detailed Survey prepared by Max Watterson & Associates ........ 13
Appendix C – Unitywater Sewer and Water Infrastructure Plan............................................. 15
Appendix D – Noosa Council Stormwater Infrastructure Plan ................................................ 17
Appendix E – 360 Civil Consulting Preliminary Engineering Drawings (P01 and P02) ............. 19

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

181002_25 Kauri St_Cooroy_B_Final.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.