Council archive · source document
181002_25 Kauri St_Cooroy_B_Final · MCU18/0165
Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Planning Report & Engineering Report) - MCU18/0165.
25 Kauri St, Cooroy 360 Civil Consulting Pty Ltd Table of Contents 1. Introduction ........................................................................................................................ 1 2. Data Sources ....................................................................................................................... 1 3. Site Description ................................................................................................................... 2 4. Proposed Development ...................................................................................................... 4 5. Access.................................................................................................................................. 4 6. Sight Distance Assessment ................................................................................................. 4 6.1 Available Sight Distance .......................................................................................................... 4 6.2 Sight Distance Requirements .................................................................................................. 6 6.4 Sight Distance Improvements ................................................................................................. 6 7. Car Parking and Turning Movements ................................................................................. 7 8. Frontage Works .................................................................................................................. 7 9. Stormwater Management – Quantity and Quality............................................................. 8 10. Earthworks .......................................................................................................................... 8 11. Waste Management ........................................................................................................... 8 12. Sewer Connection ............................................................................................................... 8 13. Water Connection and Fire Hydrant Location .................................................................... 9 14. Conclusion......................................................................................................................... 10 Appendix A – Development Layout by All Design and Drafting .............................................. 11 Appendix B – Contour and Detailed Survey prepared by Max Watterson & Associates ........ 13 Appendix C – Unitywater Sewer and Water Infrastructure Plan............................................. 15 Appendix D – Noosa Council Stormwater Infrastructure Plan ................................................ 17 Appendix E – 360 Civil Consulting Preliminary Engineering Drawings (P01 and P02) ............. 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
181002_25 Kauri St_Cooroy_B_Final.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.